365B, 365B Series II, 365BL and 365BL Series II Excavators Machine Systems Caterpillar


Undercarriage Frame - Remove

Usage:

365B L 4XZ

Removal Procedure

Table 1
Required Tools    
Tool     Part Number     Part Description     Qty    
(A)     9U-5344     Threaded Rod     2    
(B)     FT-2437     Link Assembly     1    
(C)     132-8223     Power Pack     1    
132-8159 Hydraulic Torque Wrench Assembly     1    
132-8177 46 mm Hex Link     1    
(D)         M30x3.5x381mm (15 inch) Threaded Rod     2    
(E)     3S-6224     Electric Hydraulic Pump     1    
6D-7726 Hose Assembly     2    
1P-2376 Coupler Assembly     2    
3B-3722 Bushing     2    
8S-7650 Cylinder     2    
4C-6486 Stand     2    
8S-7615 Pin     4    
8S-7641 Tube     2    
8S-7625 Collar     2    
8S-8048 Saddle     2    
(F)     3S-6224     Electric Hydraulic Pump     1    
6D-7726 Hose Assembly     2    
1P-2376 Coupler Assembly     2    
3B-3722 Bushing     2    
8S-7650 Cylinder     2    
4C-6486 Stand     2    
8S-7615 Pin     4    
8S-7641 Tube     2    
8S-7625 Collar     2    
(G)         16 mm (0.63 inch) Shackles     2    

Start By:

  1. Remove the bucket. Refer to Disassembly and Assembly, "Bucket - Remove" in this manual.

  1. Place the machine onto a hard level surface. Completely retract the stick.



    Illustration 1g00570547

  1. Place wood blocks in front of each track assembly and behind each track assembly.



    Illustration 2g00570105

  1. Position drain plug (2) for each final drive in the position that is shown. Drain the oil from each final drive into a suitable container for storage or disposal. The capacity of each final drive is 15 L (4 US gal).

  1. Remove two bolts (1) and the washers from the final drive.

  1. Install Tool (A) in place of two bolts (1), as shown. The threaded rods will keep the ring gear and the carrier assemblies positioned, when cover (4) is removed.

  1. Remove remaining bolts (3) that hold cover (4) in position.

  1. It may be necessary to use a soft faced hammer in order to break the seal between the cover and the ring gear of the final drive. Use two persons, and slide cover (4) onto the threaded rods.



    Illustration 3g00613079

  1. Remove socket head bolts (5) and ring gear (6) from cover (4). Reinstall cover (4) without ring gear (6) .

  1. Repeat Steps 3 through 8 for the other final drive.

  1. Remove the right hand boom cylinder from the machine.

    Reference: Refer to Disassembly and Assembly, "Boom Cylinder - Remove" in this manual.




    Illustration 4g00569958

  1. Start the machine. Position the end of the stick so the distance between the end of the stick and the floor is the same distance between the floor and the bottom of the counterweight.

  1. Adjust the length of Tooling (B), and install it in place of the right hand boom cylinder. Be sure to use six bolts, six washers, and six nuts in order to hold Tooling (B) together.



    Illustration 5g00570054

  1. Use Tool (C) to loosen bolts (7), but do not remove all the bolts that hold the upper structure to the undercarriage frame assembly.



    Illustration 6g00570582

    (X) Access hole

  1. Install Tool (D) in place of two mount bolts (7) in the front of the machine and the rear of the machine.

    Note: Use the access hole (X) in order to install Tool (D) .




    Illustration 7g00570703

  1. Reinstall bucket pin (8) in the stick, as shown. Be sure to position the bucket pin in the center of the stick.

  1. Install Tooling (E) under the bucket pin on each side, as shown.



    Illustration 8g00570711

  1. Install Tooling (F) under the main frame at the rear of the machine, as shown.

  1. Remove all bolts (7) that hold the upper structure to the undercarriage frame assembly.

  1. Release the hydraulic system pressure.

    Reference: Refer to Disassembly and Assembly, "Hydraulic System Pressure - Release" in this manual.

  1. Drain the oil from the hydraulic oil tank into a suitable container for storage or disposal.

    Reference: Refer to Operation and Maintenance Manual, "Refill Capacities" for the capacity of the hydraulic oil tank.




    Illustration 9g00569898

  1. Remove six bolts (10) and washers from the middle cover assembly (9). Remove middle cover assembly (9) .

  1. Remove six bolts (11) and washers from cover assemblies (12). Remove cover assemblies (12) .



    Illustration 10g00569854

  1. Disconnect two hose assemblies (16) from the swivel assembly.

  1. Disconnect two hose assemblies (13) from the swivel assembly. Remove fitting (14) in order to create extra clearance for removing the upper frame from the undercarriage of the machine.

  1. Disconnect four hose assemblies (15) from the swivel assembly.



    Illustration 11g00613178

  1. Remove five bolts (17) and the washers that secure the swivel assembly to the undercarriage of the machine.



    Illustration 12g00569912

  1. Disconnect two lubrication tube assemblies (18) from the block at the front of the upper structure.



    Illustration 13g00570747

    Typical example

    Note: It is important to keep the upper structure level when the upper structure is being removed or installed from the undercarriage frame assembly. If the upper structure is not kept level, binding of pinion shaft (19) in the swing drive with swing gear and bearing (20) will result. The clearance between the gears is minimal.

    Note: The weight of the upper structure and undercarriage frame assembly will vary depending on the attachments. The weights which are listed below are only approximate weights.

  1. Carefully, raise upper structure (18) from the undercarriage frame assembly with Tooling (E) and (F) in 6.4 mm (0.25 inch). Raise the upper structure until pinion shafts (19) of the swing drives are clear of swing gear and bearing (20). The weight of the upper structure is approximately 34000 kg (74957 lb) to 38500 kg (84877 lb).



    Illustration 14g00570712

  1. Check the clearance between the pinion shafts of the swing drives and the swing gear and bearing. Make sure that the components will not interfere with each other during the removal of the undercarriage frame assembly.

  1. Remove the wood blocks from the front and rear of the track assemblies.

  1. Fasten Tooling (G) and a chain to the undercarriage frame assembly, as shown. Use a lift truck and slowly pull undercarriage frame assembly (21) away from the upper structure. The weight of the undercarriage frame is approximately 22800 kg (50265 lb) to 24500 kg (54013 lb).

  1. If the undercarriage frame is going to be serviced, use wood blocks to support the upper structure of the machine. Support the upper structure under the main frame and under the subframe.

Caterpillar Information System:

3512 and 3516 EUI Engines for 784B, 785B, 789B and 793B Off-Highway Trucks MID 036 - CID 0248 - FMI 09 Cat Data Link not communicating
Generator Service Literature Index{4450} Generator Service Literature Index{4450}
365B Excavator Main Menu
3408E and 3412E Engines for Caterpillar Built Machines Inlet and Exhaust Valve Guides - Remove and Install
3064 and 3066 Engines for Caterpillar Built Machines Basic Engine
MP-15, MP-20, MP-30 and MP-40 Multi Processors Hydraulic Cylinder Cycle Time - Check
365B, 365B Series II, 365BL and 365BL Series II Excavators Machine Systems Heating and Air Conditioning Unit - Install
311B, 312B and 312B L Excavators Quick Coupler - Lubricate - If Equipped
312B Excavator Machine Systems Main Hydraulic Pump and Pump Drive Coupling - Remove
365B, 365B Series II, 365BL and 365BL Series II Excavators Machine Systems Heating and Air Conditioning Unit - Remove
MP-15, MP-20, MP-30 and MP-40 Multi Processors Hydraulic Rotator Cycle Time - Check
MP-15, MP-20, MP-30 and MP-40 Multi Processors Hydraulic System Air - Purge
365B, 365B Series II, 365BL and 365BL Series II Excavators Machine Systems Track Adjuster - Disassemble
365B, 365B Series II, 365BL and 365BL Series II Excavators Machine Systems Final Drive - Install
365B, 365B Series II, 365BL and 365BL Series II Excavators Machine Systems Final Drive - Remove
3064 and 3066 Engines for Caterpillar Built Machines Pinion Clearance - Adjust
G112, G115, G125 and G140 Mechanical Grapple Mounting Bracket
MP-15, MP-20, MP-30 and MP-40 Multi Processors Gerotor Motor
MP-15, MP-20, MP-30 and MP-40 Multi Processors Swivel
312B Excavator Machine Systems Main Hydraulic Pump and Pump Drive Coupling - Install
MP-15, MP-20, MP-30 and MP-40 Multi Processors Control Manifold - Crossover Relief Valve
MP-15, MP-20, MP-30 and MP-40 Multi Processors Hydraulic Cylinder
365B and 365B Series II Excavators and 365B Series II Front Shovel Machine System Specifications Final Drive
3046 Engine for Caterpillar Built Machines Basic Engine
Back to top
The names Caterpillar, John Deere, JD, JCB, Hyundai or any other original equipment manufacturers are registered trademarks of the respective original equipment manufacturers. All names, descriptions, numbers and symbols are used for reference purposes only.