Removal Procedure
Required Tools     | |||
Tool     | Part Number     | Part Description     | Qty     |
A     | 138-7575     | Link Bracket     | 2     |
B     | 8S-9906     | Ratchet Puller Gp     | 1     |
Start By:
- Remove the overspeed control valve. Refer to Disassembly and Assembly, "Overspeed Control Valve - Remove".
NOTICE |
---|
Care must be taken to ensure that fluids are contained during performance of inspection, maintenance, testing, adjusting and repair of the product. Be prepared to collect the fluid with suitable containers before opening any compartment or disassembling any component containing fluids. Refer to Special Publication, NENG2500, "Caterpillar Tools and Shop Products Guide" for tools and supplies suitable to collect and contain fluids on Caterpillar products. Dispose of all fluids according to local regulations and mandates. |
Personal injury can result from hydraulic oil pressure and hot oil. Hydraulic oil pressure can remain in the hydraulic system after the engine has been stopped. Serious injury can be caused if this pressure is not released before any service is done on the hydraulic system. Make sure all of the attachments have been lowered, oil is cool before removing any components or lines. Remove the oil filler cap only when the engine is stopped, and the filler cap is cool enough to touch with your bare hand. |
Note: Put identification marks on all lines, on all hoses, on all wires, and on all tubes for installation purposes. Plug all lines, hoses, and tubes. This helps to prevent fluid loss and this helps to keep contaminants from entering the system.
Note: Drain all fluids in a suitable container for storage or disposal.
- Remove screws (1) and remove cover (2) from the cab.
Illustration 1 | g00536255 |
- Attach Tooling (A) to the roof of the cab.
Illustration 2 | g00536277 |
- Attach Tooling (B) to Tooling (A) .
- Remove hydraulic hose assemblies (3), (5), and (6) from the top of the valve.
Illustration 3 | g00556375 |
- Remove mounting bolt (4) .
- Attach Tooling (A) to the top of bulldozer control valve and attach Tooling (B) to Tooling (A) .
- Remove mounting bolts (7) on the bottom of the valve.
Illustration 4 | g00556376 |
- Remove the bulldozer control valve. The weight of the bulldozer control valve is approximately 93 kg (205 lb).