C175-16 Locomotive Engine Caterpillar


Crankshaft Main Bearings - Remove and Install

Usage:

C175-16 3A9

Removal Procedure

Table 1
Required Tools 
Tool  Part Number  Part Description  Qty 
A(1)  253-3272  Cylinder 
B(2)  178-9312  Hose As 
C(3)  253-3276  Distribution Coupler 
185-0683 Gage As 
D(4)(5)  227-6724  Electric Hydraulic Pump Gp (120 V) 
227-8834 Electric Hydraulic Pump Gp (240 V) 
191-5347 Hydraulic Pump Gp 
156-7167 Manual Hydraulic Pump 
279-3473  Engine Turning Tool 
329-3831(6) Air Power Turning Tool 
369-4007  Bearing Driver 
Guide Stud M20 - 2.5 by 250 MM 
284-5266  Spanner Wrench 
(1) Part of Tool Group 278-1150
(2) Part of Tool Group 278-1150
(3) Part of Tool Group 278-1150
(4) Use any of the pumps that are listed in Tooling (D) for this procedure.
(5) The latest pumps and hoses require 151685 kPa (22000 psi) capacity.
(6) Optional

Start By:

  1. Remove the starting motors.

  2. Remove the fuel filter base.

  3. Remove the fuel pump.

  4. Remove the engine oil pump.

  5. Remove the engine oil cooler.

  6. Remove the engine oil scavenge pump.


    Illustration 1g01212026


    Illustration 2g03350574

  1. Remove bolts (1) and remove side cover (2). Repeat for the remaining side covers on both sides of the engine.

  2. Remove bolt (3) from each side of the engine and install Tooling (G).


    Illustration 3g01212105

  3. Install Tooling (A) onto the studs for the crankshaft main bearing cap. Tighten the threaded collar of Tooling (A). Loosen the threaded collar of Tooling (A) by 1 1/2 turns. Attach Tooling (B) onto Tooling (A). Attach Tooling (B) onto Tooling (C). Attach Tooling (C) onto Tooling (D). Apply approximately 135 MPa (19580 psi) of pressure to Tooling (A). Use the drive on Tooling (A) in order to loosen the nuts for the crankshaft main bearings. Rotate the drive on Tooling (A) by approximately three turns. Release the pressure on Tooling (A). Remove Tooling (A).


    Illustration 4g03350575

  4. Remove crankshaft main bearing nuts (4). Remove plate (5).


    Illustration 5g03350579

  5. Slide down crankshaft main bearing cap (6) on the studs. Remove crankshaft main bearing (7) from crankshaft main bearing cap (6).

  6. Install Tooling (F) in order to remove the upper crankshaft main bearing. If necessary, use Tooling (E) in order to rotate the crankshaft and remove the upper crankshaft main bearing.

Installation Procedure



    Illustration 6g03350579

  1. Lubricate main bearing studs (8) with clean engine oil. Use Tooling (H) and a suitable torque wrench in order to check the torque on main bearing studs (8). Tighten main bearing studs (8) to a torque of 100 ± 20 N·m (74 ± 15 lb ft).

    Note: Be sure that the back of the main bearing is clean and free from oil.

  2. Lightly lubricate the upper crankshaft main bearing with clean engine oil. If necessary, use Tooling (E) in order to rotate the crankshaft and remove main bearing. Use Tooling (F) and install the upper crankshaft main bearing into the cylinder block.

  3. Lightly lubricate crankshaft main bearing (7) with clean engine oil. Install crankshaft main bearing (7) into crankshaft main bearing cap (6). Lift crankshaft main bearing cap (6) into position.


    Illustration 7g03350574


    Illustration 8g03350575

  4. Lubricate bolts (3) with clean engine oil. Remove Tooling (G). Install bolts (3) finger tight.

  5. Lubricate the main bearing studs with clean engine oil. Install plate (5). Install nuts (4) for the crankshaft main bearings finger tight.


    Illustration 9g03350574

  6. Start at the front of the engine and tighten bolts (3) on the right side of the cylinder block to a torque of 100 ± 20 N·m (74 ± 15 lb ft).


    Illustration 10g01212105

    Note: Show 14 to 15 threads or 28 to 30 mm of protrusion of the stud above the nut before tension is applied. Show 16 to 17 threads or 32 to 34 mm of protrusion of the stud above the nut after tension is applied.

  7. Install Tooling (A) onto the studs for the crankshaft main bearing cap. Tighten the threaded collar of Tooling (A). Loosen the threaded collar of Tooling (A) by 1 1/2 turns. Attach Tooling (B) onto Tooling (A). Attach Tooling (C) onto Tooling (D). Apply approximately 135 MPa (19580 psi) of pressure to Tooling (B). Use the drive on Tooling (A) in order to tighten the nuts for the crankshaft main bearings. Release the pressure on Tooling (A). Reapply approximately 135 MPa (19580 psi) of pressure to Tooling (A). Recheck nuts (3) for tightness. Remove Tooling (A).


    Illustration 11g03350574

  8. Start at the front of the engine and tighten bolts (3) on the left side of the cylinder block to a torque of 100 ± 20 N·m (74 ± 15 lb ft).


    Illustration 12g03350574

  9. Start at the front of the engine and tighten bolts (3) on the right side of the cylinder block to a torque of 530 ± 70 N·m (391 ± 52 lb ft).

  10. Start at the front of the engine and tighten bolts (3) on the left side of the cylinder block to a torque of 530 ± 70 N·m (391 ± 52 lb ft).


    Illustration 13g01212026

  11. Install side cover (2). Install bolts (1). Repeat for the remaining side covers on both sides of the engine.
Back to top
The names Caterpillar, John Deere, JD, JCB, Hyundai or any other original equipment manufacturers are registered trademarks of the respective original equipment manufacturers. All names, descriptions, numbers and symbols are used for reference purposes only.
CH-Part.com is in no way associated with any of the manufacturers we have listed. All manufacturer's names and descriptions are for reference only.