C7.1 Industrial Engine Caterpillar


Turbocharger - Install - First Stage Turbocharger

Usage:

C7.1 770

Installation Procedure

Table 1
Required Tools 
Tool  Part Number  Part Description  Qty 
370-4653  Counterweight Tool 
4C-5597  Anti-Seize Compound 


NOTICE

Keep all parts clean from contaminants.

Contaminants may cause rapid wear and shortened component life.




    Illustration 1g02176197

  1. Ensure that turbocharger (4) is clean and free from damage. Inspect the turbocharger for wear. Refer to System Operation, Testing and Adjusting, "Turbocharger Inspect" for more information. If any part of the turbocharger is worn or damaged, the complete turbocharger must be replaced.

  2. Test wastegate actuator (24) for correct operation. Refer to System Operation, Testing and Adjusting, "Turbocharger Inspect" for more information. If any part of the wastegate actuator is worn or damaged, the complete turbocharger must be replaced.


    Illustration 2g02175963

  3. Clean the gasket surface of exhaust manifold (20). If necessary, install studs (23) to turbocharger (4). Tighten the studs to a torque of 18 N·m (160 lb in).

  4. Install a new gasket (22) to turbocharger (4).

  5. Position turbocharger (4) onto the exhaust manifold and install nuts (21) finger tight. The nuts (21) should not constrain the turbocharger and prevent Tooling (A) from correctly positioning the turbocharger onto the exhaust manifold.

  6. Use Tooling (A) to align turbocharger (4).

    Note: Ensure that the turbocharger is correctly oriented.

  7. Tighten nuts (21) to a torque of 44 N·m (32 lb ft).

  8. Remove Tooling (A) from turbocharger (4).


    Illustration 3g02176198


    Illustration 4g02175962

  9. Remove plugs and caps from tube assemblies. Ensure that tube assembly (19) and tube assembly (15) are clean and free from damage. Replace any damaged components.

  10. Position a new gasket (17) (not shown) onto tube assembly (19).

  11. Install bolts (18) to tube assembly (19). Tighten the bolt to a torque of 9 N·m (80 lb in).

  12. Remove the plug from oil inlet port (25). Lubricate the turbocharger bearings with clean engine oil through the oil inlet port. Rotate the wheel of the compressor several times in order to lubricate the bearings.

  13. Install a new sealing washer (16) to banjo bolt (14). Install banjo bolt (14) to tube assembly (15) and install remaining sealing washers (16) to banjo bolt (14).

  14. Tighten banjo bolt (14) to a torque of 20 N·m (177 lb in).


    Illustration 5g02175961

  15. Use Tooling (B) to lubricate the allen head bolt for V-band clamp (6). Position V-band clamp (6) onto air duct (13).

  16. Position hose assembly (12) and air duct (13) onto the outlet of turbocharger (10) and turbocharger (4). Ensure that the V-band clamp (6) is seated correctly onto the turbochargers.

  17. Tighten the allen head bolt for V-band clamp (6) to a torque of 12 N·m (106 lb in).

  18. Tighten hose clamps (11) to a torque of 6 N·m (53 lb in).

  19. Use Tooling (B) to lubricate the allen head bolt for V-band clamp (9). Position V-band clamp (9) onto turbocharger (10).

  20. Use Tooling (B) to lubricate the allen head bolt for V-band clamp (3). Position V-band clamp (3) onto elbow (1).

  21. Position elbow (1) onto turbocharger (10) and turbocharger (4).

  22. Tighten allen head bolt for V-band clamp (3) and V-band clamp (9) finger tight. Ensure that the V-band clamps are seated correctly onto the turbochargers.

  23. Tighten allen head bolt for V-band clamp (3) and V-band clamp (9) to a torque of 12 N·m (106 lb in).

  24. Connect hose assembly (2) to the wastegate actuator.

    Note: Ensure that the clip for hose assembly is correctly positioned.

  25. Connect hose assembly (7) to the connection in outlet of turbocharger (4).

    Note: Ensure that the clip for hose assembly is correctly positioned.

  26. Install bolt (8) to clip for tube assembly. Tighten the bolt to a torque of 22 N·m (195 lb in).

  27. Connect hose assembly to air outlet (5) of turbocharger (4). Tighten the hose clamps securely.

Caterpillar Information System:

C7.1 Industrial Engine Throttle Valve (Intake Air) - Remove
C7.1 Industrial Engine Throttle Valve (Intake Air) - Install
C7.1 Industrial Engine Temperature Sensor (Cooled Exhaust Gas) - Remove and Install
C7.1 Industrial Engine Temperature Sensor (DPF) - Remove and Install - Temperature Sensor (DPF) and Flame Detection Sensor
C7.1 Industrial Engine Soot Antenna - Remove and Install
C7.1 Industrial Engine Rocker Shaft and Pushrod - Remove
C7.1 Industrial Engine Rocker Shaft and Pushrod - Install
C7.1 Industrial Engine Rocker Shaft - Disassemble
C7.1 Industrial Engine Rocker Shaft - Assemble
C7.1 Industrial Engine Relay (ARD Nozzle Heater) - Remove and Install - Clean Emissions Module
C7.1 Industrial Engine Refrigerant Compressor - Remove and Install
C7.1 Industrial Engine Rear Power Take-Off (RPTO) - Remove
C7.1 Industrial Engine Turbocharger - Remove - First Stage Turbocharger
C7.1 Industrial Engine Turbocharger - Install - Second Stage Turbocharger
C7.1 Industrial Engine Turbocharger - Remove - Second Stage Turbocharger
C7.1 Industrial Engine Valve Mechanism Cover - Remove and Install
C7.1 Industrial Engine Vibration Damper and Pulley - Install
C7.1 Industrial Engine Vibration Damper and Pulley - Remove
C7.1 Industrial Engine Wastegate Solenoid - Remove and Install
C7.1 Industrial Engine Water Pump - Install
C7.1 Industrial Engine Water Pump - Remove
C7.1 Industrial Engine Water Temperature Regulator - Remove and Install
C7.1 Industrial Engine Fuel Priming Pump - Remove and Install - Electric Fuel Lift Pump (EFLP)
Cleaning Procedure After a Pump, Motor, or Cylinder Failure for Backhoe Loaders{5050, 7000} Cleaning Procedure After a Pump, Motor, or Cylinder Failure for Backhoe Loaders{5050, 7000}
Back to top
The names Caterpillar, John Deere, JD, JCB, Hyundai or any other original equipment manufacturers are registered trademarks of the respective original equipment manufacturers. All names, descriptions, numbers and symbols are used for reference purposes only.
CH-Part.com is in no way associated with any of the manufacturers we have listed. All manufacturer's names and descriptions are for reference only.