Required Tools | |||
Tool | Part Number | Part Description | Qty |
A | - | Loctite 263 High Strength Threadlocker | - |
- | Loctite 270 High Strength Threadlocker(1) | - | |
B | 456-8912 | Installer Gp | 1 |
(1) | For use in EAME only |
NOTICE |
---|
Care must be taken to ensure that fluids are contained during performance of inspection, maintenance, testing, adjusting, and repair of the product. Be prepared to collect the fluid with suitable containers before opening any compartment or disassembling any component containing fluids. Refer to Special Publication, PERJ1017, "Dealer Service Tool Catalog" for tools and supplies suitable to collect and contain fluids on Cat® products. Dispose of all fluids according to local regulations and mandates. |
Note: Lubricate the O-ring seals and the check valve assemblies with the lubricant that is being sealed.
- Install check valve (43). Install O-ring seal (44) to cap (45). Apply Tooling (A) to cap (45). Install cap (45) and tighten to a torque of
400 ± 40 N·m (295 ± 30 lb ft) . Repeat for the remaining cap assembly. Install 12 screws (47) and tighten until the first thread of the port is visible. Apply Tooling (A) to check valves (48). Install two check valves (48) and tighten to a torque of80 ± 8 N·m (59 ± 6 lb ft) . Install 15 O-ring seals (46).Show/hide tableIllustration 2 g03678884 Show/hide tableIllustration 3 g03678882 Intensifier Valve Assembly Note: When installing backup ring (40), ensure that the concave side is facing O-ring seal (37).
- Using Tooling (B), install backup rings (40), (39), (41), (42), and O-ring seals (36), (37), and (38). Apply Tooling (A) to bolts (35). Install cover (34) and bolts (35). Tighten bolts (35) to a torque of
50 N·m (37 lb ft) , then retighten to a torque of235 N·m (173 lb ft) .Show/hide tableIllustration 4 g03678880 Intensifier Valve Assembly - Install O-ring seal (31) to plug (30). Apply Tooling (A) to the threads of plug (30). Install check valve (32) and plug (30). Tighten plug (30) to a torque of
100 ± 10 N·m (74 ± 7 lb ft) . There are four sets of plugs, O-ring seals, and check valves in total. Install screw (33) and tighten until the first thread of the port is visible. There are 14 screws in total.Show/hide tableIllustration 5 g03678879 - Position intensifier valve assembly (29) to the regenerative valve assembly and install four bolts (28). Tighten bolts (28) to a torque of
145 ± 14 N·m (107 ± 10 lb ft) .Show/hide tableIllustration 6 g03678878 Sequence Valve Assembly - Install five screws (26) and tighten until the first thread of the port is visible. Install O-ring seals (not shown) to plugs (27). Apply Tooling (A) to plugs (27) and install plugs (27). Tighten plugs (27) to a torque of
100 ± 10 N·m (74 ± 7 lb ft) . There are two plugs in total. Install six O-ring seals (25).Show/hide tableIllustration 7 g03678877 - Position sequence valve assembly (24) to the intensifier valve assembly and install six bolts (23). Tighten bolts (23) to a torque of
42 ± 4 N·m (31 ± 3 lb ft) .Show/hide tableIllustration 8 g06226148 Relief Valve and Manifold assembly - Install O-ring seal (not shown) onto relief valve (21). Apply Tooling (A) to the threads of relief valve (21). Install relief valve (21) and tighten to a torque of
40 ± 4 N·m (30 ± 3 lb ft) . - Install check valve (19). Install O-ring seal (20) to plug (22). Apply Tooling (A) to plug (22). Install plug (22) and tighten to a torque of
140 ± 40 N·m (103 ± 30 lb ft) . - Install O-ring seal (20A) to plug (22A). Apply Tooling (A) to plug (22A). Install plug (22A) and tighten to a torque of
270 ± 20 N·m (200 ± 15 lb ft) . - Install eight screws (18) and tighten until the first thread of the port is visible.
- Install O-ring seal (17) to plug (16) and install plug (16).
Note: There are four plugs in total.
- Apply Tooling (A) to plug (14). Install O-ring seal (15) to plug (14) and install plug (14).
Show/hide table
Illustration 9 g03678873 Pilot Valve Assembly Show/hide tableIllustration 10 g03678871 Pilot Valve Assembly Show/hide tableIllustration 11 g03678869 Pilot Valve Assembly Show/hide tableIllustration 12 g03678867 Pilot Valve Assembly - Install O-ring seal (12) to check valve (13) and install check valve (13). Tighten check valve (13) to a torque of
100 ± 10 N·m (74 ± 7 lb ft) . Install two screws (11) and two screws (7). Tighten the screws until the top thread of the port is visible. Install O-ring seal (8) to cap (9) and install cap (9). Tighten cap (9) to a torque of220 ± 22 N·m (162 ± 16 lb ft) . Install four O-ring seals (10).Show/hide tableIllustration 13 g03678866 Show/hide tableIllustration 14 g03677990 - Position pilot valve assembly (6) to manifold (3) and install bolts (5). Tighten bolts (5) to a torque of
43 ± 4 N·m (32 ± 3 lb ft) . There are four bolts in total. Install manifold (3) to the regenerative valve assembly and install bolts (4). Tighten bolts (4) to a torque of43 ± 4 N·m (32 ± 3 lb ft) . There are two bolts in total. - Position plate (1) to manifold (3) (If Equipped). Apply Tooling (A) to thread of bolts (2). Tighten bolts (2) to a torque of
12 ± 3 N·m (106 ± 26 lb in) .
Illustration 1 | g03678886 |
Regenerative Valve Assembly |
End By:
- Install the speed control