Trailer Brake Valve (Hydraulic) - Remove and Install

Usage:

TH210 CEC

Removal Procedure

Start By:

  1. Raise the boom and install the boom cylinder lock. Refer to Operation and Maintenance Manual, "Boom Cylinder Lock - Removal and Installation Procedures".
  2. Apply the foot brake valve several times in order to relieve the pressure in the brake system. Refer to Systems Operation, Testing and Adjusting, RENR5156, "Machine Preparation for Troubleshooting".
  3. Remove the hood, the door and the grill from the engine enclosure. Refer to Disassembly and Assembly Manual, RENR5153, "Engine Enclosure - Remove and Install".
  4. Remove the battery. Refer to Disassembly and Assembly Manual, RENR5153, "Battery - Remove and Install".
  5. Remove the upper hydraulic tank. Refer to Disassembly and Assembly Manual, "Hydaulic Tank - Remove".
  6. Remove the bottom guard. Refer to Disassembly and Assembly Manual, "Sump Guard - Remove and Install".

------ WARNING! ------

Personal injury or death can result from improper lifting or blocking.

When a hoist or jack is used to lift any part or component, stand clear of the area. Be sure the hoist or jack has the correct capacity to lift a component. Install blocks or stands before performance of any work under a heavy component.

Approximate weights of the components are shown. Clean all surfaces where parts are to be installed.

----------------------

------ WARNING! ------

Personal injury can result from hydraulic oil pressure and hot oil.

Hydraulic oil pressure can remain in the hydraulic system after the engine has been stopped. Serious injury can be caused if this pressure is not released before any service is done on the hydraulic system.

Make sure all of the work tools have been lowered to the ground, and the oil is cool before removing any components or lines. Remove the oil filler cap only when the engine is stopped, and the filler cap is cool enough to touch with your bare hand.

----------------------


NOTICE

Care must be taken to ensure that fluids are contained during performance of inspection, maintenance, testing, adjusting and repair of the product. Be prepared to collect the fluid with suitable containers before opening any compartment or disassembling any component containing fluids.

Refer to Special Publication, NENG2500, "Caterpillar Tools and Shop Products Guide" for tools and supplies suitable to collect and contain fluids on Caterpillar products.

Dispose of all fluids according to local regulations and mandates.


  1. Put identification marks on all lines, on all hoses, on all wires, and on all tubes for installation purposes. Plug all lines, all hoses and all tubes. This helps to prevent fluid loss and this helps to keep contaminants from entering the system.



    Illustration 1g00984285

  1. Disconnect electrical wires (2) from window washer reservoir (1) .



    Illustration 2g00984287

  1. Disconnect lines (4) for the window washers at the connections to valves (3). Cut the cable straps that secure the lines to the underside of the machine and move the lines aside. Make a note of the number and the location of all the cable straps for the purpose of installation.



    Illustration 3g00984288

  1. Cut the cable straps that secure fuses (5) to battery tray (6). Make a note of the number and location of all the cable straps for the purpose of installation.



    Illustration 4g00984289

  1. Cut the cable straps that secure electrical component (7) to battery tray (6). Make a note of the number and location of the cable straps for the purpose of installation.



    Illustration 5g00984290

  1. Remove bolts (9), the nuts and the washers that secure the accumulator charging valve (8) to the battery tray (6) .



    Illustration 6g00984291

  1. Remove bolts (11), the nuts and the washers that secure battery tray (6) to post (10) .



    Illustration 7g00984292

    Position of nylon lifting sling

  1. Attach a suitable nylon lifting sling and a suitable hoist to battery tray (6). Refer to the white arrow in Illustration 7. Use the attached lifting equipment to support the weight of the battery tray. The weight of the battery tray is approximately 24 kg (53 lb).

  1. Remove bolts (12), the nuts, the washers, bolts (13), and the washers that secure battery tray (6) onto the machine.

  1. Use the attached lifting equipment to remove battery tray (6) from the machine. Place the battery tray on suitable cribbing. Remove the nylon lifting sling and the hoist from the battery tray.



    Illustration 8g00984275

    The accumulator charging valve has been removed for photographic clarity.

  1. Disconnect hoses (14) from the trailer brake valve.

  1. Remove bolts (15) (not shown) and the washers in order to remove the trailer brake valve from the machine.

Installation Procedure

------ WARNING! ------

Personal injury or death can result from improper lifting or blocking.

When a hoist or jack is used to lift any part or component, stand clear of the area. Be sure the hoist or jack has the correct capacity to lift a component. Install blocks or stands before performance of any work under a heavy component.

Approximate weights of the components are shown. Clean all surfaces where parts are to be installed.

----------------------

  1. Clean all parts and inspect all parts. If any parts are worn or damaged, use new Caterpillar parts for replacement.



    Illustration 9g00984275

    The accumulator charging valve has been removed for photographic clarity.

  1. Position the trailer brake valve to the frame of the machine. Install bolts (15) (not shown) and the washers in order to secure the trailer brake valve to the frame of the machine.

  1. Connect hoses (14) to the trailer brake valve.



    Illustration 10g00984295

    Position of nylon lifting sling

  1. Attach a suitable nylon lifting sling and a suitable hoist to battery tray (6). The weight of the battery tray is approximately 24 kg (53 lb).



    Illustration 11g00984292

  1. Use the attached lifting equipment to carefully position battery tray (6) to the machine. Secure the battery tray in position with bolts (12), the nuts, the washers, bolts (13) and the washers.

  1. Remove the nylon lifting sling and the hoist from battery tray (6) .



    Illustration 12g00984291

  1. Install bolts (11), the nuts and the washers that secure battery tray (6) to post (10) .



    Illustration 13g00984290

  1. Position accumulator charging valve (8) to battery tray (6). Secure the accumulator charging valve in position with bolts (9), the nuts and washers.



    Illustration 14g00984289

  1. Position electrical component (7) to battery tray (6) before securing the electrical component in place with new cable straps. For the location and the number of the cable straps, refer to the note that was made during the removal procedure.



    Illustration 15g00984288

  1. Position fuses (5) onto battery tray (6) before securing the fuses in place with new cable straps. For the location and the number of the cable straps, refer to the note that was made during the removal procedure.



    Illustration 16g00984287

  1. Connect lines (4) for the window washers at the connections to valves (3). Install new cable straps in order to secure the lines to the underside of the machine. For the location and the number of the cable straps, refer to the note that was made during the removal procedure.



    Illustration 17g00984285

  1. Connect electrical wires (2) to window washer reservoir (1) .
,,,

End By:

  1. Install the battery. Refer to Disassembly and Assembly ManualRENR5153, "Battery - Remove and Install".
  2. Install the upper hydraulic tank. Refer to Disassembly and Assembly Manual, "Hydaulic Tank - Install".
  3. Install the hood, the door and the grill from the engine enclosure. Refer to Disassembly and Assembly ManualRENR5153, "Engine Enclosure - Remove and Install".
  4. Install the bottom guard. Refer to Disassembly and Assembly Manual, "Sump Guard - Remove and Install".
  5. Remove the boom cylinder lock and lower the boom. Refer to Operation and Maintenance Manual, "Boom Cylinder Lock - Removal and Installation Procedures".
  6. Check the hydraulic tank oil level. Refer to Operation and Maintenance Manual, "Hydraulic Tank - Check Oil Level".
  7. Purge the service brake system of air. Refer to System Operations, Testing and AdjustingRENR5156, "Service Brake Air - Purge".

Caterpillar Information System:

TH210 and TH215 Telehandlers Machine Systems Diverter Valve - Remove and Install
TH350B, TH360B, TH460B and TH560B Telehandlers Engine Supplement Engine - Install
3034 Engine for Caterpillar Built Machines Pistons and Connecting Rods - Remove - Fractured Connecting Rod
938G Series II Wheel Loader and IT38G Series II Integrated Toolcarrier Machine Systems Piston Pump (Hydraulic Fan) - Install
735 and 740 Articulated Trucks and 735 and 740 OEM Articulated Trucks Steering, Suspension, and Body Hoist Hydraulic Systems Hoist, Steering, Suspension, and Fan Drive System (Schematic)
735 and 740 Articulated Trucks and 735 and 740 OEM Articulated Trucks Steering, Suspension, and Body Hoist Hydraulic Systems Braking System (Schematic)
735 and 740 Articulated Trucks and 735 and 740 OEM Articulated Trucks Steering, Suspension, and Body Hoist Hydraulic Systems Suspension System (Schematic)
735 and 740 Articulated Trucks and 735 and 740 OEM Articulated Trucks Steering, Suspension, and Body Hoist Hydraulic Systems Hoist System (Schematic)
938G Series II Wheel Loader and IT38G Series II Integrated Toolcarrier Machine Systems Piston Pump (Hydraulic Fan) - Remove
Procedure for Replacement of Air Conditioner Components{7320} Procedure for Replacement of Air Conditioner Components{7320}
797 Off-Highway Truck Power Train Worksheets
120H and 135H Motor Graders Operator Controls
TH350B, TH360B, TH460B and TH560B Telehandlers Engine Supplement Engine Mount (Rear) - Remove
2003/03/10 Correction to Specifications, Systems Operation, Testing and Adjusting , "Transmission Control Pressure Test" {3030, 3065, 3167}
938G Series II Wheel Loader and IT38G Series II Integrated Toolcarrier Machine Systems Pilot Operated Hydraulic Control (Joystick) - Disassemble
3412 Generator Set Engines Disconnect Switch
938G Series II Wheel Loader and IT38G Series II Integrated Toolcarrier Machine Systems Pilot Operated Hydraulic Control (Joystick) - Assemble
TH350B, TH360B, TH460B and TH560B Telehandlers Engine Supplement Engine Mount (Rear) - Install
Installation and Operation of the Belt Recoil Alarm for the Mobil-trac System{4197, 7400} Installation and Operation of the Belt Recoil Alarm for the Mobil-trac System{4197, 7400}
938G Series II Wheel Loader and IT38G Series II Integrated Toolcarrier Machine Systems Selector and Pressure Control Valve (Pilot) - Remove and Install
776D, 777D and 777D HAA Off-Highway Truck/Tractors Power Train Rear Axle and Final Drive System
120H and 135H Motor Graders Hydraulic and Steering System Ripper Cylinder and Lines
938G Series II Wheel Loader and IT38G Series II Integrated Toolcarrier Machine Systems Pressure Reducing Valve (Traction Control System) - Remove and Install
776D, 777D and 777D HAA Off-Highway Truck/Tractors Power Train Visual Inspection (Rear Axle and Final Drive)
Back to top
The names Caterpillar, John Deere, JD, JCB, Hyundai or any other original equipment manufacturers are registered trademarks of the respective original equipment manufacturers. All names, descriptions, numbers and symbols are used for reference purposes only.
CH-Part.com is in no way associated with any of the manufacturers we have listed. All manufacturer's names and descriptions are for reference only.