Remove Instrument Panel

1. Drain the coolant from the cooling system below the level of the cylinder head.

2. Remove water temperature sending unit (1) from the cylinder head.

3. Remove four bolts (2) that hold the instrument panel to bracket (3). Remove clip (4). Move the instrument panel forward.

4. Disconnect oil pressure sensing line (5) and the wire that is connected to the bottom of the instrument panel. Remove the instrument panel.

5. Put identification on wires (7) and disconnect the wires from the gauges.

6. Remove brackets (6) that hold the gauges in position.

7. Put identification on the wires connected to the stop switch and the magnetic switch. Disconnect the wires.

8. Remove gauges (8) from the instrument panel.

9. Remove the nuts from stop switch (9) and magnetic switch (10). Remove the switches.

Install Instrument Panel

1. Install the nuts which hold magnetic switch (1) and stop switch (2) in position.

2. Connect the wires to the magnetic switch and the stop switch.

3. Put the water temperature gauge and the oil pressure gauge in position. Install brackets (3) that hold the gauges in position.

4. Connect wires (4) to the gauges.

5. Connect oil line (5) and wire (6). Install clip (7) on the valve cover.

6. Put instrument panel (8) in position. Install four bolts which hold the instrument panel to bracket (9).

7. Install the water temperature sending unit in the cylinder head.

8. Fill the cooling system with coolant to the correct level.