Usage:
1. Remove pin (5).
2. Move signal plate (1) to the LIFT KICKOUT position (9) as shown in the illustration.
3. Move lift cylinder control lever (6) (counterclockwise) to the RAISE detent position.
4. Adjust the length of rod assembly (7) until the pin holes of lever (4) and rod assembly (7) are in alignment.
5. Shorten rod assembly (7) by four turns. Put lift cylinder control lever (6) in the spring-centered position and install pin (5).
6. Raise the bucket to the desired height.
7. Make mark (8) on the lift arms opposite the high point of pin (2). [Pin (2) is part of lever (3)].
8. Lower the bucket.
9. Move signal (1) until the lobe (high point of the signal plate) is in alignment with mark (8) on the lift arm.
10. Tighten the bolts that hold signal plate (1) in position.