Gear Pump (Implement, Pilot and Braking) - Assemble
Assembly Procedure
Show/hide table
Required Tools     | |||
---|---|---|---|
Tool     | Part Number     | Part Description     | Qty     |
A     | 1P-0510     | Driver Group     | 1     |
Note: Replace all O-ring seals and gaskets. Apply a light film of SAE 10 oil to all components before assembly.
Note: Cleanliness is an important factor. Before assembly, all parts should be thoroughly cleaned in cleaning fluid. Allow the parts to air dry. Wiping cloths or rags should not be used to dry parts. Lint may be deposited on the parts which may cause later trouble. Inspect all parts. If any parts are worn or damaged, use new parts for replacement.
- Install retainer ring (35) , seal (34) , backup ring (33) and isolation plate (32) .
Show/hide table
Illustration 1 | g00736454 |
- Install plate (31) .
- Install O-ring seal (28) .
Show/hide table
Illustration 2 | g00736288 |
- Install gear (29) and gear (30) .
- Install plate (27) .
Show/hide table
Illustration 3 | g00736287 |
- Install O-ring seal (22) .
Show/hide table
Illustration 4 | g00735555 |
- Install isolation plate (23) , backup ring (24) , seal (25) and retainer ring (26) .
- Install cover (21) .
Show/hide table
Illustration 5 | g00735541 |
- Install gear (19) .
- Install eight socket head bolts (20) and the washers. Tighten the bolts to a torque of 100 ± 15 N·m (74 ± 11 lb ft).
- Install body (6) .
Show/hide table
Illustration 6 | g00735526 |
- Install four nuts (18) and the washers. Tighten the nuts to a torque of 115 ± 7 N·m (85± 5 lb ft).
Show/hide table
Illustration 7 | g00735511 |
- Install plate (16) and hidden seal (17) .
Show/hide table
Illustration 8 | g00735473 |
- Install gear (14) and gear (15) .
Show/hide table
Illustration 9 | g00735460 |
- Install O-ring seal (11) , seal (12) and plate (13) .
Show/hide table
Illustration 10 | g00735449 |
- Use Tooling (A) in order to install lip seal (9) .
Show/hide table
Illustration 11 | g00735431 |
- Install O-ring seal (10) .
- Install flange (5) .
Show/hide table
Illustration 12 | g00736700 |
- Install eight bolts (8) . Tighten the bolts to a torque of 228 ± 10 N·m (168 ± 7 lb ft).
Show/hide table
Illustration 13 | g00735418 |
- Install O-ring seal (4) .
Show/hide table
Illustration 14 | g00735404 |
- Install manifold (3) .
Show/hide table
Illustration 15 | g00735384 |
- Install four bolts (2) .
- Install plug (1) .
Show/hide table
Illustration 16 | g00735378 |
End By: Install the gear pump. Refer to Disassembly and Assembly, "Gear Pump (Implement, Pilot and Braking) - Install".
Caterpillar Information System:
953C Track-Type Loader Power Train System Components
966F Wheel Loader and 966F Series II Wheel Loader Hydraulic System Pump Performance (Implement) - Test
AD30 and AD55 Underground Articulated Trucks Power Train Electronic Control System MID 027 - CID 0724 - FMI 05
611 Wheel Tractor-Scraper Hydraulic System Accumulator (Axle Suspension) - Test and Charge
627G Wheel Tractor-Scraper Wheel Scraper Power Train Visual Inspection
950G and 962G Wheel Loaders and IT62G Integrated Toolcarrier Power Train Oscillating Axle (Rear) - Install
950G and 962G Wheel Loaders and IT62G Integrated Toolcarrier Power Train Oscillating Axle (Rear) - Remove
AD30 and AD55 Underground Articulated Trucks Power Train Electronic Control System MID 027 - CID 0709 - FMI 05
966G II and 972G II Wheel Loaders Safety Messages - Arrangement I
631E Series II, 633E Series II and 637E Series II Wheel Tractor-Scrapers Air System and Brakes General Troubleshooting Information
AD30 and AD55 Underground Articulated Trucks Power Train Electronic Control System MID 027 - CID 0708 - FMI 05
IT28G and IT38G Integrated Toolcarriers and 924G, 924GZ, 928G and 938G Wheel Loaders Power Train Electronic Control System Transmission Control (Shift Lever)
AD30 and AD55 Underground Articulated Trucks Power Train Electronic Control System MID 027 - CID 0725 - FMI 05
AD30 and AD55 Underground Articulated Trucks Power Train Electronic Control System MID 027 - CID 1605 - FMI 05
AD30 and AD55 Underground Articulated Trucks Power Train Electronic Control System MID 027 - CID 1606 - FMI 05
AD30 and AD55 Underground Articulated Trucks Power Train Electronic Control System MID 027 - CID 1607 - FMI 05
950F Wheel Loader and 950F Series II Wheel Loader Air System and Brakes Parking Brake for Models with Hydraulic Brakes
AD30 and AD55 Underground Articulated Trucks Power Train Electronic Control System MID 027 - CID 1608 - FMI 05
AD30 and AD55 Underground Articulated Trucks Power Train Electronic Control System MID 027 - CID 1610 - FMI 05
2001/12/24 New Water Valve Assembly and Board Control Assembly Improve Reliability of the HVAC System {7320}
623G Wheel Tractor-Scraper Hydraulic System Relief Valve (Main) - Test and Adjust
621G and 623G Wheel Tractor-Scrapers Wheel Tractor Power Train Retarder
966F Wheel Loader and 966F Series II Wheel Loader Hydraulic System Implement Cycle Time - Check
627G Wheel Tractor-Scraper Wheel Scraper Power Train Operational Checks