311B and 312B Excavators Hydraulic System Caterpillar


Swing Bearing Movement - Measure

Usage:

312B 2NS

Specification

Table 1
"Swing Bearing Movement - Measure" 
Date  Machine Serial Number 
Specification For Vertical Movement Of The Swing Bearing 
Item  Specification  Actual  Average 
New  1.5 mm (0.06 inch)  1.   
2.
3.
Service Limit  3.0 mm (0.12 inch)  1.   
2.
3.
 
Specification For Circular Movement Of The Swing Bearing 
Item  Specification  Actual  Average 
New  4.0 mm (0.16 inch)  1.   
2.
3.
4.
Service Limit  12.0 mm (0.47 inch)  1.   
2.
3.
4.

Introduction

Use the procedures that follow in order to check the vertical movement and the circular movement of the swing bearing. Two dial indicators with magnetic bases are required for the procedures.

Required Tools

Table 2
Tool  Description  Qty 
Dial Indicator 

Procedure To Measure Vertical Movement Of The Swing Bearing

  1. Place the machine on level ground.

  2. Empty the bucket.

  3. Position the upper structure parallel with the tracks.

  4. Inspect the static torque of the bolts in the swing bearing in order to make sure that the bolts are tightened properly.

    1. Set the torque wrench to a torque value of 230 N·m (170 lb ft).

    2. Make a mark on the head of the bolt that is relative to the carbody or the bearing race.

    3. Apply the specified torque to the bolt.

    4. If the head of the bolt does not move, the torque is within the specification.

    5. If the head of the bolt moves, replace the bolt.


    Illustration 1g01107785
    (A) Dial indicator
    (B) Dial indicator
    (C) Outer race of the swing bearing
    (D) Inner race of the swing bearing
    (F) Carbody

  5. Refer to Illustration 1. Position dial indicator (A) between the carbody and the outer race of the swing bearing (C). Position dial indicator (B) between the carbody and the outer race of the swing bearing (C).

    Note: Position the dial indicators at the front center of the carbody and at the rear center of the carbody.



    Illustration 2g02173683

  6. Position the machine as shown in Illustration 2.

  7. Adjust both dial indicators to "zero".


    Illustration 3g02173685

  8. Position the machine as shown in Illustration 3. The angle between the ground and the track should be approximately 15 degrees.

  9. Calculate the total distance of movement between dial indicator (A) and dial indicator (B). Record the total distance movement of in Table 1.

    Note: This measurement is one of three measurements of the vertical swing bearing movement to be used in Step 14.

  10. Reposition the machine as shown in illustration 2.

  11. Note the distance movement of both of the dial indicators. Calculate the difference for each dial indicator and the measurement at the zero point that was measured in Step 7.

    Note: The difference calculated for each dial indicator should be less than ± 0.05 mm (± 0.002 inch). A greater distance may indicate the dial indicator has moved out of the original zero position This greater distance also indicates that the measurement from Step 9 is not a valid measurement and additional vertical swing bearing movement measurements are necessary. Repeat Steps 6 through 11.

  12. Remove the dial indicators. Rotate the upper structure three times in a clockwise direction. Rotate the upper structure three times in a counterclockwise direction.

  13. Repeat Steps 5 through 12 three times.

  14. Calculate the average of the values that were recorded in Step 9. Compare this average to the service limit specifications are shown in Table 1.

Procedure To Measure Circular Movement Of The Swing Bearing

  1. Place the machine on level ground.

  2. Empty the bucket.


    Illustration 4g02173688
    (E) 1000 mm (39.4 inch)

  3. Position the upper structure parallel to the tracks. Refer to Illustration 4 for the correct position of the boom, of the stick, and of the bucket.

  4. Stop the engine.


    Illustration 5g00740365
    (A) Dial indicator
    (C) Outer race of swing bearing
    (D) Inner race of swing bearing
    (F) Magnet

  5. Position dial indicator (A) on the outer race of swing bearing (C). Position a magnet (F) on the inner race of swing bearing (D). The value for the measurement will be the average of four readings.

  6. By hand, push the side of the bucket in order to rotate the upper structure in a counterclockwise direction as far as possible. Hold the upper structure in that position while the dial indicator is set to "zero".

  7. By hand, push the side of the bucket in order to rotate the upper structure in a clockwise direction as far as possible. Record the dial indicator reading.

  8. Remove the dial indicator. Rotate the upper structure three times in a clockwise direction. Rotate the upper structure three times in a counterclockwise direction.

  9. Perform Step 5 through 8 for each machine position that is shown in Illustration 6. The evaluation of the movement of the bearing is based on the average value of the four measurements at the four positions shown in Illustration 6.

If the measurements for the circular movement of the swing bearing exceed the specifications that are listed in Table 1, check the following components for improper function, wear and/or failure:

  • swing gear teeth

  • pinion gear in the swing drive

  • swing drive

  • swing motor

  • swing brake valve

  • swing control valve


Illustration 6g00741029

Caterpillar Information System:

307C Excavator Hydraulic System Swing Bearing Movement - Measure
318E Excavator C4.4 Engine Supplement Turbocharger - Remove and Install
336E H Excavator Relay - Test
730C2 and 725C2 Articulated Truck Power Train Transmission Planetary - Assemble
349F and 352F Excavator Machine System Electrical Connector - Inspect
730C2 and 725C2 Articulated Truck Power Train Transmission Planetary - Disassemble
336E H Excavator Alarm - Test
349F and 352F Excavator Machine System Emerging Symptom Information
349F and 352F Excavator Machine System Symptom Troubleshooting
318D2 Excavator Lubricant Viscosities - Fluids Recommendations
349F and 352F Excavators Determining Diagnostic Trouble Codes
374F and 390F Excavators and 390F MHPU Mobile Hydraulic Power Unit Diagnostic Capabilities
312D2 and 313D2 Excavators Hydraulic System Main Hydraulic System
312D2 and 313D2 Excavators Hydraulic System Boom Hydraulic System
312D2 and 313D2 Excavators Specifications
312D2 and 313D2 Excavators Hydraulic System Electronic Control System
Procedure to Install the 380-3967 Connecting Lines Gp (Thumb) on Certain Hydraulic Excavators{5057, 5362, 6547} Procedure to Install the 380-3967 Connecting Lines Gp (Thumb) on Certain Hydraulic Excavators{5057, 5362, 6547}
336E Excavator Machine System Specifications Pilot Lines
312F, 313F, 316F and 318F Excavators Wiring Harness (Short Circuit) - Test
Installation of the Generator and Control Panel Components for Dynamic Gas Blending Retrofits on Certain 3500 Engines{4490, 7451} Installation of the Generator and Control Panel Components for Dynamic Gas Blending Retrofits on Certain 3500 Engines{4490, 7451}
336E Excavator Machine System Specifications Front Lines
336E Excavator Machine System Specifications Pilot Lines
336E Excavator Machine System Specifications Pilot Lines
336E Excavator Machine System Specifications Pilot Lines
Back to top
The names Caterpillar, John Deere, JD, JCB, Hyundai or any other original equipment manufacturers are registered trademarks of the respective original equipment manufacturers. All names, descriptions, numbers and symbols are used for reference purposes only.
CH-Part.com is in no way associated with any of the manufacturers we have listed. All manufacturer's names and descriptions are for reference only.