- Asphalt Screed
- SE60 V (S/N: JJ31-UP)
- SE60V XW (S/N: JS91-UP)
Introduction
Inspections are the most basic form of condition monitoring. Inspections are easy to do and surprisingly effective at helping you spot equipment health issues. Proactive monitoring and analysis of equipment information will allow Dealers to intervene effectively before problems occur.
Note: Before adjusting product settings to comply with listed baseline TA2 values, consult SIS for the latest specification values.
Creating an Electronic Copy
Use the following procedure to create an editable electronic copy from SIS Web.
- Click format to print.
- Save the document as an HTML format.
- Open the document with Microsoft Word.
Screed Plate Check and Adjust
Reference: Refer to Testing & Adjusting, UENR3139 for more detail on the following test.
Status(1) | Description | Specification | Actual | Comments |
---|---|---|---|---|
The distance between drop arm face and slope box face | |
(1) | N = Normal, M = Monitor, A = Action |
Nose Bar Check and Adjust
Reference: Refer to Testing & Adjusting, UENR3139 for more detail on the following test.
Status(1) | Description | Specification | Actual | Comments |
---|---|---|---|---|
The distance of the bottom nose bar should be below main screed plate | Zero to |
|||
The distance of the bottom extender nose bar should be below extender screed plate | Zero to |
(1) | N = Normal, M = Monitor, A = Action |
Deflector Check and Adjust
Reference: Refer to Testing & Adjusting, UENR3139 for more detail on the following test.
Status(1) | Description | Specification | Actual | Comments |
---|---|---|---|---|
The distance from the bottom edge of the main screed deflector plate to tool | |
|||
The distance from the bottom edge of extender deflector plate to tool | |
(1) | N = Normal, M = Monitor, A = Action |
Extender Check and Adjust
Reference: Refer to Testing & Adjusting, UENR3139 for more detail on the following test.
Status(1) | Description | Specification | Actual | Comments |
---|---|---|---|---|
Correct angle of attack | Zero to |
(1) | N = Normal, M = Monitor, A = Action |
Chain (Crown) Check and Adjust
Reference: Refer to Testing & Adjusting, UENR3139 for more detail on the following test.
Status(1) | Description | Specification | Actual | Comments |
---|---|---|---|---|
Crown chain maximum deflection | |
(1) | N = Normal, M = Monitor, A = Action |
Heater Element Test
Reference: Refer to Testing & Adjusting, UENR3139 for more detail on the following test.
Status(1) | Description | Specification | Actual | Comments |
---|---|---|---|---|
Resistance across pin "A" and pin "B" in the screed plate heater element harness | 143.6 ohms to 167.2 ohms | |||
Resistance across pin "A" and pin "B" in the end gate heater element harness | 76.9 ohms to 89.6 ohms | |||
Amount of allowable insulation leakage across pin "A" and pin "C" in heater element harness | The resistance should be greater than five giga- ohms at room temperature | |||
Amount of allowable insulation leakage across pin "B" and pin "C" in heater element harness | The resistance should be greater than five giga- ohms at room temperature | |||
Harness connector torque | |
(1) | N = Normal, M = Monitor, A = Action |
S·O·S Samples
Reference: Refer to Operation and Maintenance Manual, KEBU7172, "Maintenance Interval Schedule" for more detail on performing S.0.S samples.
Status(1) | Description | Obtain | Comments | |
---|---|---|---|---|
Hydraulic System Oil Sample | ||||
Pump Drive Oil Sample | ||||
Right Final Drive Planetary Oil Sample | ||||
Left Final Drive Planetary Oil Sample | ||||
Right Conveyor Planetary Drive (Auger) Oil Sample | ||||
Left Conveyor Planetary Drive (Auger) Oil Sample | ||||
Right Conveyor Planetary Drive (Drag) Oil Sample | ||||
Left Conveyor Planetary Drive (Drag) Oil Sample |
(1) | N = Normal, M = Monitor, A = Action |