Required Tools | |||
Tool | Part Number | Part Description | Qty |
A | 1P-2420 | Transmission Repair Stand | 1 |
B | 138-7575 | Link Bracket | 3 |
C | 5P-5197 | Retaining Ring Pliers | 1 |
D | 5P-4758 | Internal Pliers | 1 |
E | FT-0947 | Spring Compressor | 2 |
F | 138-7574 | Link Bracket | 2 |
G | FT-0833 | Spring Compressor | 2 |
H | 138-7575 | Link Bracket | 2 |
J | 3K-4897 | Spring Pin | 8 |
Start By:
- Separate the transmission and bevel gear. Refer to Disassembly and Assembly, "Transmission and Bevel Gears - Separate".
Note: The transmission modulating valves must be recalibrated if any of the following procedures are performed:
- The transmission modulating valve and/or the solenoid is replaced.
- The transmission is serviced or replaced.
- The ECM is replaced.
- Put the transmission in the correct position on Tooling (A). Put marks on all the housings for alignment during the assembly procedure.
- Remove small O-ring seals (1) and large O-ring seal (2) from the transmission cover.
Show/hide table
Illustration 2 g00595592 - Remove the plugs and fitting (5).
- Remove the bolts and retainers (4).
- Remove tubes (3) and the seals from the tubes.
Show/hide table
Illustration 3 g00595597 Show/hide tableIllustration 4 g00595602 - Remove locknut (6). Push connector (7) out of the case.
- Disconnect harness assembly (8).
Show/hide table
Illustration 5 g00595604 - Remove 9/16 inch bolts (9) and control valve (10).
Show/hide table
Illustration 6 g00595608 - Remove bolt (11) and tube assembly (12).
- Remove the O-ring seal from tube assembly (12).
Show/hide table
Illustration 7 g00595609 Show/hide tableIllustration 8 g00595610 - Attach Tooling (B) and a suitable lifting device to the planetary group. Remove bolts (13) that hold the planetary group to the transmission cover. Remove the planetary group. The weight of the planetary group is approximately
341 kg (751.8 lb) .Show/hide tableIllustration 9 g00648092 - Attach Tooling (B) and a suitable lifting device to the transmission cover. Remove the transmission cover from Tooling (A). The weight of transmission cover (15) is approximately
100 kg (220.5 lb) . - Remove the bolts and cover (14) of the suction screen and the O-ring seal from the transmission cover.
- Remove the suction screen from transmission cover (14).
Show/hide table
Illustration 10 g00648094 - Put transmission planetary group (16) in position on Tooling (A). Use the bolts and nuts (17) to fasten the planetary group to Tooling (A).
Show/hide table
Illustration 11 g00595611 - Remove harness assemblies (20) from the clips on the back side of plate assembly (19). Remove bolts (18), the washers, and plate assembly (19) from planetary group (16).
Show/hide table
Illustration 12 g00595612 - Remove guard (21) and the bracket with sensors (22) from the planetary group.
Show/hide table
Illustration 13 g00595614 - Use Tooling (C) to remove retaining ring (23) and rotor (24).
Show/hide table
Illustration 14 g00595678 - Remove ring (25) and rotor (26).
Show/hide table
Illustration 15 g00595680 - Use Tooling (C) to remove retaining ring (27). Remove bolts (28) and the washers from manifold (29).
Show/hide table
Illustration 16 g00595682 - Install Tool (B) and a suitable lifting device to manifold (29). Remove manifold (29). The weight of manifold (29) is approximately
22 kg (48.5 lb) .Show/hide tableIllustration 17 g00648095 - Use Tooling (D) to remove bearing (30) from manifold (29).
- Remove bearing (31) from manifold (29).
Show/hide table
Illustration 18 g00648096 - Remove first clutch gear (31) and the housing assembly. The weight of first clutch gear (31) and the housing assembly is approximately
31 kg (68.3 lb) . - Remove springs (32) and dowels (34).
Note: The discs and the plates from the individual clutches must be kept in the correct order. The discs and the plates must be kept with the original clutch housings. The different clutches use different friction material. The discs and the plates must not be mixed together.
- Remove the two discs and one plate (33). The two discs and plate (33) are the second speed clutch.
Show/hide table
Illustration 19 g00648098 - Remove retaining ring (34) and housing (35) from first clutch gear (31).
- Remove the four discs and the three plates from first clutch gear (31).
Show/hide table
Illustration 20 g00648099 Show/hide tableDo not remove the retaining ring until the spring force has been released. Failure to do so could result in personal injury or death. In order to prevent this, use a suitable press to hold the spring force while the retaining ring is removed. Slowly release the spring tension with the press after the retaining ring has been removed.
- Put housing (35) in a press, as shown. Compress the springs under plate (36). Remove retainer ring (37). Slowly release the spring pressure. Remove plate (36) and the three spring plates under plate (36).
Show/hide table
Illustration 21 g00648100 - Remove piston (39) from housing (35). Remove ring (40) and seal (38) from the piston.
Show/hide table
Illustration 22 g00648103 - Turn over the housing. Remove seal rings (41) from carrier (42).
Note: Carrier (42) will be destroyed if the carrier is removed from the housing.
- If carrier (42) must be removed, use a hammer and a chisel to break the carrier. Remove the carrier. After the carrier is removed, remove the dowel that holds the carrier in position.
Show/hide table
Illustration 23 g01033377 - Use Tooling (E) to hold the two pistons in clutch housing (43).
- Attach Tooling (F) and a suitable lifting device to clutch housing (43). Remove clutch housing (43). The weight of clutch housing (43) and the piston is approximately
46 kg (101.4 lb) .Show/hide tableIllustration 24 g00648119 - Remove pistons (45) and (47) from clutch housing (43).
- Remove seal rings (44) and (46) from pistons (45) and (47).
Show/hide table
Illustration 25 g00648120 - Remove springs (48).
- Remove three discs (49) and the two plates.
Show/hide table
Illustration 26 g00648123 - Use Tooling (C) to remove retaining ring (50).
- Remove gear (51) and planetary carrier (52).
Show/hide table
Illustration 27 g00648125 - Use a hammer and a punch to push pins (56) into shafts (53).
- Remove shafts (53), gears (54), and thrust washers (55) and (58) from planetary carrier (52). Remove bearings (57) from gears (54).
- Remove pins (56) from shafts (53).
- Install small screwdrivers in teeth (X) around the planetary carrier. This will compress the retaining ring. Remove gear (59) from planetary carrier (52).
Show/hide table
Illustration 28 g01033379 - Put wood blocks under reverse clutch housing (62).
- Remove bolts (60). Use Tooling (G) to hold the piston in forward clutch housing (61).
- Attach Tooling (H) and a suitable lifting device to the piston and forward clutch housing (61). Remove the piston and forward clutch housing (61). The weight of the piston and forward clutch housing (61) is approximately
26 kg (57.3 lb) .Show/hide tableIllustration 29 g00648132 - Remove piston (63) from forward clutch housing (61).
- Remove seal ring (64) and seal ring (65) from piston (63).
Show/hide table
Illustration 30 g00648133 - Remove dowels (68) and springs (70).
- Remove four discs (67), the three plates, ring gear (66), and plate assembly (69).
Show/hide table
Illustration 31 g00648135 - Remove four discs (71) and the three plates from reverse clutch housing (62).
Show/hide table
Illustration 32 g00648136 - Use Tooling (C) to remove retaining ring (72). Retaining ring (72) holds the shaft and the planetary carrier to reverse clutch housing (62).
Show/hide table
Illustration 33 g00648137 - Use a suitable lifting device to remove output shaft (73) and the planetary carrier from reverse clutch housing (62). The weight of output shaft (73) and the planetary carrier is approximately
70 kg (154.3 lb) .Show/hide tableIllustration 34 g00648139 - Remove piston (74) from reverse clutch housing (62).
- Remove seal ring (75) and seal ring (76) from the piston.
Show/hide table
Illustration 35 g00648140 - Turn over the reverse clutch housing. The weight of the reverse clutch housing is
42 kg (92.6 lb) . Use Tooling (D) to remove snap ring (77). - Remove bearing (78).
Show/hide table
Illustration 36 g00648141 - Remove seal (80), seal rings (79), and seal ring (81) from the shaft and the planetary carrier.
Show/hide table
Illustration 37 g00648145 - Turn over the output shaft, the planetary carriers, and the gears. Position the components on wood blocks, as shown.
- Remove seal (82) from output shaft (73).
- Remove seal ring (84) from the planetary carrier.
- Remove retaining ring (83) that holds output shaft (73) to the planetary carrier.
- Remove output shaft (73) from the input shaft and from the planetary carrier.
Show/hide table
Illustration 38 g00648146 - Use Tooling (C) to remove retaining ring (85) from output shaft (83). Remove gear (86) and bearing (87) from the output shaft.
Show/hide table
Illustration 39 g00648149 - Remove bearing (88) from output shaft (73).
Show/hide table
Illustration 40 g00648150 - Use Tooling (C) to remove retaining ring (92). Retaining ring (92) holds gear (91) in position on input shaft (90). Remove gear (91).
- Use two people in order to remove the planetary carrier from the input shaft. The weight of planetary carrier (89) is approximately
26 kg (57.3 lb) .Show/hide tableIllustration 41 g00648151 - Use Tooling (J) to compress retaining ring (93). Remove gear (94) from the planetary carrier.
Show/hide table
Illustration 42 g00648153 - Remove retaining ring (95). Remove bearing (97) and the gear as a unit from the planetary carrier.
- Remove bearing (97) from gear (96).
- Use a hammer and a punch to push pin (98) into the planetary gear shafts.
Show/hide table
Illustration 43 g00648154 - Remove planetary gear shafts (102), gears (99) and (101), and thrust washers (103) from the planetary carrier.
- Remove bearings (100) from gears (99) and (101).
- Remove pins (104) from planetary gear shafts (102).
Show/hide table
Illustration 44 g00648158 - Remove planetary carrier (105) from input shaft (90).
Show/hide table
Illustration 45 g00648159 - Use Tooling (D) to remove retaining ring (106). Remove bearing (107).
- Use a hammer and a punch to push pins (108) into the planetary gear shafts.
Show/hide table
Illustration 46 g00648160 - Remove planetary gear shafts (109), gears (110), and thrust washers (112).
- Remove bearings (111) from gears (110).
- Remove pins (113) from the planetary gear shafts.
Show/hide table
Illustration 47 g00648161 - Remove O-ring seal (115) from input shaft (90).
Note: Carrier (114) will be damaged if the carrier is removed.
- If necessary, remove carrier (114) from input shaft (90).
Illustration 1 | g00595589 |