C18 Generator Set Engines Caterpillar


Crankshaft - Remove and Install

Usage:

C18 GEN SE RT8

Removal Procedure

Table 1
Required Tools 
Tool  Part Number  Part Description  Qty 
395-1590  Lifting Eye Assembly 
1H-3110  Bearing Puller 
8B-7560 Step Plate 
9U-6600 Hand Hydraulic Pump 
1H-3108 Push-Puller Leg 
1H-3107 Bearing Puller 
3H-0468 Puller Plate 
3H-0465 Push-Puller Plate 
1P-0820 Hydraulic Puller 
5B-0637 Nut 
8S-6586 Forcing Screw 
5P-0944  Dowel Puller Group 
5P-0939 Dowel Extractor 
8T-5096  Dial Indicator 
8T-3052  Degree Wheel 

Start By:

  1. Remove the front housing.

  2. Remove the flywheel housing.

  3. Remove the piston cooling jets.


NOTICE

Keep all parts clean from contaminants.

Contaminants may cause rapid wear and shortened component life.


  1. Check the main bearing caps for identification for the location and the direction in the cylinder block. The identification marks on the main bearing caps must be installed in the same direction prior to removal.

  2. Check the connecting rod and the connecting rod bearing caps for identification and the location in the cylinder block.


    Illustration 1g01017945

  3. Remove bolts (1) for connecting rod bearing cap (2). Remove the connecting rod bearing caps.


    Illustration 2g01020310

  4. Remove bolts (3) for main bearing cap (4). Remove the main bearing caps.


    Illustration 3g00996555

  5. Install Tooling (A) and a suitable lifting device on each end of crankshaft (5). The weight of crankshaft (5) is approximately 177 kg (390 lb).

  6. Remove the crankshaft from the cylinder block.

  7. Remove the thrust plates from each side of the No. 4 main bearing.

  8. Remove the lower main bearings from the main bearing caps. Remove the upper main bearings from the cylinder block.

    Note: Mark the used main bearings or identify the used main bearings for installation if the main bearings will be used again.



    Illustration 4g00996556

  9. Use Tooling (B) to remove crankshaft gear (6) from crankshaft (5).


    Illustration 5g01056151

  10. If necessary, use Tooling (C) to remove dowel (7) and dowel (8) from crankshaft (5).

Installation Procedure


NOTICE

Keep all parts clean from contaminants.

Contaminants may cause rapid wear and shortened component life.




    Illustration 6g01018035

  1. Install dowel (7) in the crankshaft.

    Protrusion of dowel (7) from the crankshaft face ... 6.4 mm (0.25 inch)

  2. Install dowel (8) in the crankshaft.

    Protrusion of dowel (8) from the crankshaft ... 4.1 ± 0.5 mm (0.160 ± 0.020 inch)

    Note: Do not use a torch to heat the crankshaft gear. Overheating of the crankshaft gear will cause premature failure.

  3. Raise the temperature of crankshaft gear (6) to a maximum temperature of 233° C (451° F). Install crankshaft gear (6) on the crankshaft with the keyway in alignment with dowel (8). The Timing Mark "V" of the gear should face away from crankshaft (5). If necessary, use a suitable brass drift and a suitable hammer to seat the crankshaft gear against the shoulder of the crankshaft.

  4. Clean the cylinder block and the main bearing caps thoroughly.


    Illustration 7g01048335

    Note: Install the main bearings dry when clearance checks are performed. Refer to Disassembly and Assembly, "Bearing Clearance - Check". Apply clean engine oil on the face of the main bearings for final assembly.

  5. Install the upper halves of main bearings (9) in the cylinder block.

    Note: Ensure that the main bearings are installed so that the bearing tabs fit into the notch in the cylinder block. The upper halves of the main bearings have the oil groove and the oil hole.

  6. Install Tooling (A) and a suitable lifting device on crankshaft (5). The weight of crankshaft (5) is approximately 177 kg (390 lb).

  7. Install crankshaft (5) with the Timing Mark "V" on the crankshaft gear in alignment with the Timing Mark "V" on the cluster gear.


    Illustration 8g01048338

  8. Install thrust plates (10) on each side of the No. 4 main bearing.

    Note: Install the thrust plates with the words "Block Side" toward the cylinder block.

  9. Install the lower halves of the crankshaft main bearings in the main bearing caps.

    Note: Ensure that the main bearings are installed so that the bearing tabs fit into the notch in the main bearing cap.



    Illustration 9g01020434

  10. Position main bearing caps (4) on the crankshaft.

    Note: Ensure that the numbers on the main bearing caps match the numbers on the cylinder block. Also ensure that the "FRONT" on the main bearing cap is installed toward the front of the cylinder block.

  11. Lubricate the threads of bolts (3) with clean engine oil. Install the bolts.

  12. Tighten bolts (3) for the main bearing caps, as follows:

    1. Tighten Bolt (A) to a torque of 258 ± 14 N·m (190 ± 10 lb ft).

      Note: Bolt (A) is on the bearing tab side of the main bearing cap.

    2. Tighten Bolt (B) opposite the bearing tab side to a torque of 258 ± 14 N·m (190 ± 10 lb ft).

      Note: Bolt (B) is on the opposite side of the bearing tab of the main bearing cap.

    3. Tighten Bolt (B) for an extra 120 ± 5 degrees (2 flats).

      Note: If Tooling (E) is not used, place an index mark on the bolt and the main bearing cap.

    4. Tighten Bolt (A) for an extra 120 ± 5 degrees (2 flats).

      Note: If Tooling (E) is not used, place an index mark on the bolt and the main bearing cap.

    5. Rotate the crankshaft to ensure that the crankshaft turns freely.


    Illustration 10g01103661

  13. Use Tooling (D) to check the crankshaft end play. Ensure that Tooling (D) is against a machined surface. The end play is controlled by the thrust plates of No. 4 main bearing (center). Refer to Specifications, "Crankshaft" for the crankshaft end play.

    Note: Install the connecting rod bearings dry when clearance checks are performed. Refer to Disassembly and Assembly, "Bearing Clearance - Check". Apply clean engine oil on the face of the connecting rod bearings for final assembly.



    Illustration 11g01020428

  14. Position the connecting rod against the crankshaft. Install connecting rod bearing cap (2) on the connecting rod.

    Note: Ensure that the number on the side of the connecting rod bearing cap is on the same side as the number on the connecting rod. The bearing tabs of the connecting rod bearing cap and the connecting rod are on the side of the piston cooling jet.

  15. Lubricate the threads of bolts (1) with clean engine oil. Install the bolts.

  16. Tighten bolts (1), as follows:

    1. Tighten Bolt (A) and Bolt (C) to a torque of 70 ± 4 N·m (52 ± 3 lb ft).

    2. Tighten Bolt (B) and Bolt (D) to a torque of 70 ± 4 N·m (52 ± 3 lb ft).

    3. Turn Bolt (B) and Bolt (D) for an extra 60 ± 5 degrees (1/6 turn).

      Note: If Tooling (E) is not used, place an index mark on each bolt and connecting rod cap.

    4. Tighten Bolt (A) and Bolt (C) to a torque of 70 ± 4 N·m (52 ± 3 lb ft).

    5. Turn Bolt (A) and Bolt (C) for an extra 60 ± 5 degrees (1/6 turn).

      Note: If Tooling (E) is not used, place an index mark on each bolt and connecting rod cap.

    6. Rotate the crankshaft to ensure that the crankshaft turns freely.

End By:

  1. Install the piston cooling jets.

  2. Install the flywheel housing.

  3. Install the front housing.

Caterpillar Information System:

G3512 EPA Emergency and Non-Emergency Standby Generator Sets Sound Information
G3512 EPA Emergency and Non-Emergency Standby Generator Sets Fire Prevention and Explosion Prevention
G3512 EPA Emergency and Non-Emergency Standby Generator Sets Additional Messages
C18 Generator Set Engines Crankshaft Main Bearings - Remove and Install
C18 Generator Set Engines Connecting Rod Bearings - Remove and Install
C18 Generator Set Engines Pistons and Connecting Rods - Assemble
C18 Generator Set Engines Pistons and Connecting Rods - Disassemble
XQP150 Rental Generator Set Welding on Engines with Electronic Controls
XQP150 Rental Generator Set Refill Capacities
C18 Generator Set Engines Piston and Connecting Rods - Remove and Install
XQP150 Rental Generator Set Refill Capacities
C9.3 Marine Engine Transmission Oil Cooler - Remove and Install
G3512 EPA Emergency and Non-Emergency Standby Generator Sets Engine Starting
G3512 EPA Emergency and Non-Emergency Standby Generator Sets Generator Isolating for Maintenance
G3512 EPA Emergency and Non-Emergency Standby Generator Sets Model View Illustrations
XQP150 Rental Generator Set Coolant Extender (ELC) - Add
XQP150 Rental Generator Set Coolant Level - Check
XQP150 Rental Generator Set Engine Air Cleaner Element (Dual Element) - Inspect/Clean/Replace
C18 Generator Set Engines Bearing Clearance - Check
XQP150 Rental Generator Set Engine Oil Sample - Obtain
XQP150 Rental Generator Set Radiator - Clean
New Engine Software Is Now Available For Certain C18 630 hp Industrial Engines {1920} New Engine Software Is Now Available For Certain C18 630 hp Industrial Engines {1920}
C18 Generator Set Engines Nitrogen Oxide Sensor - Remove and Install
XQP150 Rental Generator Set Hoses and Clamps - Inspect/Replace
Back to top
The names Caterpillar, John Deere, JD, JCB, Hyundai or any other original equipment manufacturers are registered trademarks of the respective original equipment manufacturers. All names, descriptions, numbers and symbols are used for reference purposes only.
CH-Part.com is in no way associated with any of the manufacturers we have listed. All manufacturer's names and descriptions are for reference only.