Introduction
Revision | Summary of Changes in SEBF8612 |
10 | Updated Introduction |
Added serial number prefixes for New Product Introduction. | |
09 | Added serial number prefixes for New Product Introduction. |
08 | Added serial number prefixes for New Product Introduction. |
07 | Added PL83, PL87 to Tables
Added serial number prefixes for New Product Introduction. |
© 2018 Caterpillar All Rights Reserved. This guideline is for the use of Caterpillar dealers only. Unauthorized use of this document or the proprietary processes therein without permission may be violation of intellectual property law. Information contained in this document is considered Caterpillar: Confidential Yellow.
This Undercarriage Reconditioning Bulletin contains the necessary information to allow a dealer to establish a parts reusability program. Reuse and salvage information enables Caterpillar dealers and customers to benefit from cost reductions. Every effort has been made to provide the most current information that is known to Caterpillar. Continuing improvement and advancement of product design might have caused changes to your product which are not included in this publication. This Undercarriage Reconditioning Bulletin must be used with the latest technical information that is available from Caterpillar.
For technical questions when using this document, work with your Dealer Technical Communicator (TC).
To report suspected errors, inaccuracies, or suggestions regarding the document, submit a form for feedback in the Service Information System (SIS Web) interface.
Summary
The Positive Pin Retention Track was developed by Caterpillar to reduce a common cause of loss of lubrication in track joints. Retaining rings are used to lock the track pin and the track links together. Refer to Illustration 1. The retaining ring prevents any motion between the track link and the track pin during machine operation as well as proper end play of the track joint. With proper end play, the seals maintain full compression against the ends of the bushings and the seals retain oil in the cavities of the track joints.
Illustration 1 | g01172751 |
Positive Pin Retention Track |
The information in this bulletin describes the tooling that will be used and the required service procedures. Follow each step to ensure that each track joint has minimum end play and maximum service life.
Note: Refer to Undercarriage Reconditioning Bulletin, SEBF8613, "Field Service for Sleeve Bearing Track" to service D11 Sleeve Bearing Track in the field. Sleeve Bearing Track was introduced in 2002on D11 Track-Type Tractors. Sleeve Bearing Track is now standard on the D11. The Positive Pin Retention Track without the sleeve bearing is no longer available for the D11.
A list of important reference and training materials is shown on the next page of this bulletin. The operator of the track press should become familiar with this material for training prior to servicing the Positive Pin Retention Track.
Safety
Illustration 2 | g03673682 |
Most accidents that involve product operation, maintenance, and repair are caused by failure to observe basic safety rules or precautions. An accident can often be avoided by recognizing potentially hazardous situations before an accident occurs. A person must be alert to potential hazards. This person should also have the necessary training, skills, and tools to perform these functions properly.
This bulletin may contain hazardous steps. A safety alert symbol like the one below is used to call attention to a hazard.
Warning messages identify a specific, imminent, latent, hazard that has a reasonable probability of resulting in personal injury or death if the warning is ignored.
Illustration 3 | g03186216 |
Example warning |
Do not attempt to disassemble or assemble this machine until you read and understand the disassembly and assembly instructions. Improper disassembly and assembly procedures could result in injury or death. |
Inspect all threaded components before use. Damaged threads may fail under hydraulic pressure. Broken threads may release flying objects that are propelled with great force. Personal injury or death can occur if struck by flying objects. |
Do not stand near the hydraulic press while the press is in operation. A component that slips or breaks under pressure may fly into the air with great force. Personal injury or death can occur if struck by flying objects. |
NOTICE |
---|
When reconditioning track assemblies always wear normal safety equipment; such as, safety glasses and steel-toed shoes. |
The machine must be on a level, hard surface before a separation of the track is made. Any time a separation of both tracks is made, the machine must have blocks correctly positioned so the machine will not move. |
Personal injury can result from grease under high pressure. The adjuster cylinder for the track is under high hydraulic pressure. Grease under high pressure can cause injury. Do not visually inspect the adjuster to see if grease is released when the valve is opened. Check the rod to see that it moves to the rear into the front support on the track roller frame. |
Keep away from the front of the machine when the track is pushed off the final drive. A minimum distance of |
Canceled Part Numbers and Replaced Part Numbers
This document may not include all canceled part numbers and replaced part numbers. Use NPR on SIS for information about canceled part numbers and replaced part numbers. NPR will provide the current part numbers for replaced parts.
References
Reference: Undercarriage Reconditioning Guide, SEBF8599
Reference: Undercarriage Reconditioning Bulletin, SEBF8558, "Guideline for Reusable Track Parts"
Reference: Undercarriage Reconditioning Bulletin, SEBF8553, "Reusability Guidelines and Installation Procedures for Split Master Links"
Reference: Undercarriage Reconditioning Bulletin, SEBF8562, "Procedures and Guidelines for Cleaning Phosphate Coated Track Pins"
Reference: Undercarriage Reconditioning Bulletin, SEBF8554, "Track Press Assembly Specifications Decals"
Reference: Undercarriage Reconditioning Bulletin, SEBF8594, "Nitrogen Pressure Test"
Reference: Undercarriage Reconditioning Bulletin, SEBF8566, "Caterpillar Track Data Charts"
Reference: Undercarriage Reconditioning Bulletin, SEBF8577, "Oil Volumes for Track Link Assemblies"
Reference: Shop Repair of Positive Pin Retention Track, PEVN4329
Reference: Tool Operating Manual, NEHS0650, "Caterpillar Track Press Manual"
Reference: Tool Operating Manual, NEHS0826, "Caterpillar 300T Track Press Manual"
Reference: Tool Operating Manual, NEHS0803, "Caterpillar 375T Track Press Manual"
Reference: Tool Operating Manual, NEHS0830, "Caterpillar Track Torque Wrench"
Reference: Servicing Handbook, PEKP9400, "Caterpillar Track Service Handbook"
Reference: Parts Sales Kit, PECP3003
Reference: Catalog, NENG2500, "Dealer Service Tool Catalog"
Reference: See Testing and Adjusting for your machine.
Reference: See Disassembly and Assembly for your machine.
Reference: See Operation and Maintenance Manual for your machine.
Required Tooling
Required Tooling | ||
Callout | Part Number | Part Description |
(A) | Pneumatic Wrench Gp | |
(B) | Hydraulic Pressure Gauge | |
(C) | Quick Connect Coupler | |
(D) | Indicator Gauge Gp | |
(E) | Electric Hydraulic Pump Gp | |
(F) | Gauge Calibration Gp | |
(G) | Track Repair Group | |
(H) | Load Positioner Gp | |
(J) | Double Acting Cylinder | |
(K) | Wheel Grinder Gp | |
(L) | End Brush | |
(M) | Installation Tool | |
(N) | Installer Tool | |
(P) | Indicator Gauge Gp | |
(R) | Dial Indicator Gp | |
(S) | Pressure Gauge Tool Gp | |
(U) | Loctite
C5-A |
Anti-Seize Compound |
(V) | Pipe Bushing | |
(W) | Pipe Coupling | |
(X) | Paper Towel | |
(Y) | Cap | |
(Z) | Pin Tool |
Model | Guide Pin (AA) |
D11T/R/N
5130B 5130 |
|
D10T/R/N
D10 5110B |
|
D9T/R/N
D9L 589 |
|
D8T/R/N
587T/R 583T/R 578 PL83 PL87 |
Model | Seal Installer (BB) | End Groove Gauge (CC) |
D11T/R/N | ||
5130B
5130 |
||
D10T/R/N | ||
D10 | ||
5110B | ||
D9T/R/N | ||
D9L
589 |
||
D8T/R/N
587T/R 583T/R 578 PL83 PL87 |
(1) | Post Turn Seal Installer |
Model | Forcing Pin (DD) |
D11T/R/N
5130B 5130 |
|
D10T/R/N
D10 5110B |
|
D9T/R/N
D9L 589 D8T/R/N 587T/R 583T/R 578 PL83 PL87 |
Model | Pin Receiver (EE) |
D11T/R/N
5130B 5130 |
|
D10T/R/N
D10 5110B |
|
D9T/R/N
D9L 589 D8T/R/N 587T/R 583T/R 578 PL83 PL87 |
Model | Pin Projection Adapter (FF) |
D11T/R/N
5130B 5130 |
|
D10T/R/N | |
D10
5110B |
|
D9T/R/N | |
D9L
589 D8T/R/N 587T/R 583T/R 578 PL83 PL87 |
Model | Extruder (GG) |
D11T/R/N
5130B 5130 |
|
D10T/R/N
D10 5110B |
|
D9T/R/N
D9L 589 |
|
D8T/R/N
587T/R 583T/R 578 PL83 PL87 |
Preparation for Removal of the Track Joint
The repair of the damaged track joint can be performed on the tractor or on the ground.
- If the repair will be performed on the tractor, position dry joint (1) above the front track roller frame.
- If the repair will be performed on the ground, move the track until the master track link is in alignment above the centerline of the rear idler.
Note: The procedure in this guideline repairs the damaged track joint on the ground.
Show/hide tableIllustration 6 g01159329 - Remove five of the track shoes that are next to the dry joint.
Note: Use Tooling (A) to remove the track bolts.
Show/hide tableIllustration 7 g01179354 (2) Track adjuster cover - Remove cover (2).
Show/hide table
Personal injury can result from grease under high pressure.
The adjuster cylinder for the track is under high hydraulic pressure. Grease under high pressure can cause injury.
Do not visually inspect the adjuster to see if grease is released when the valve is opened. Check the rod to see that it moves to the rear into the front support on the track roller frame.
Show/hide tableIllustration 8 g01179371 (3) Track adjusting mechanism - Release the pressure from track adjusting mechanism (3).
Show/hide table
Illustration 9 g01159659 - Place cribbing under the grouser bar.
- Remove the bolts for the track shoe from the master track link with Tooling (A) and separate the master track link.
Show/hide table
Keep away from the front of the machine when the track is pushed off the final drive. A minimum distance of
7.6 m (25 ft) is needed in front of the track to permit the track to move out onto the floor. - Turn the final drive in a forward direction and allow the track to fall forward.
Show/hide table
Illustration 10 g01159675 Note: All illustrations in this document are shown with the rail downward.
- Use cribbing to provide clearance for Tooling (G).
Show/hide table
Illustration 11 g01159681 - Use a permanent pen to mark the track pins and bushings for proper reinstallation.
Note: to determine reusability, examine the track joint.
- Calibrate the hydraulic system.
Note: Tooling (B) should be calibrated with Tooling (F). Tooling (B) should be used as a master gauge in the field. Connect Tooling (V) and Tooling (W) with Tooling (C). Use calibrated Tooling (B) and assembled Tooling (C) to check the accuracy of Tooling (D) and Tooling (E).
Recommended calibration range of the master gauge is
34500.0 kPa to 60300.0 kPa (5000.00 psi to 8745.00 psi) . Connect the master gauge to the high-pressure hose on Tooling (E). Record the correct assembly pressure on the mounted gauge when the correct assembly pressure is achieved. The recorded pressure is the pressure that should be used to assemble the track.
Illustration 4 | g01176658 |
Field Repair of Positive Pin Retention Track |
Illustration 5 | g01159309 |
(1) Location of the dry joint |
Removal of the Damaged Joint
Note: This Undercarriage Reconditioning Bulletin uses Tooling (G) to repair the track.
Note: Refer to Servicing Handbook, PEKP9400, "Caterpillar Track Service Handbook". For current reuse information, refer to Undercarriage Reconditioning Bulletin, SEBF8558, "Guideline for Reusable Track Parts".
- Remove bolster (4) from Tooling (G) and install Tooling (DD).
Note: Use Tooling (H) to suspend Tooling (G). Tooling (G) will be easier to maneuver by using Tooling (H).
Show/hide tableIllustration 13 g01159706 - Position Tooling (G) around the track link assembly.
Show/hide table
Illustration 14 g01348190 - Install Tooling (EE) in the bolster.
Show/hide table
NOTICE Using the wrong pin receiver will result in interference between the receiver inside diameter and the retainer ring.
Show/hide tableIllustration 15 g01159719 - Install bolster (4) on Tooling (G).
Show/hide table
Illustration 16 g01159702 - Connect the hydraulic lines to Tooling (G).
Show/hide table
Illustration 17 g01159721 Show/hide tableIllustration 18 g01159722 - Align Tooling (DD) and Tooling (EE) on the track link assembly.
Show/hide table
Illustration 19 g01159724 - Remove the track pin with Tooling (G).
Show/hide table
Illustration 20 g01348193 - Install Tooling (AA) after the first track pin is removed.
- Remove the track pins that are next to the dry joint. Install Tooling (AA) as each additional track pin is removed.
- Remove Tooling (G) and one guide pin.
Show/hide table
Illustration 21 g01348197 - Use Tooling (J) to spread the track links.
Note: Use only minimal force. Excessive force will cause the track links to move on the bushing, resulting in incorrect bushing projection and possible interference of the track links.
Show/hide tableIllustration 22 g01159731 - After the track links have been spread apart, carefully separate the track joint.
- Move Tooling (J) to the adjacent pair of track links.
Show/hide table
Illustration 23 g01159732 - Attach a hoist to the pair of track links which will be removed.
- Remove Tooling (AA).
- Use Tooling (J) to spread the adjacent pair of track links and remove the damaged track joint.
- Remove the thrust rings and remove the retaining rings as each track pin is pressed out of the bore of the track link.
Note: If the retaining ring does not fall out of the groove on the track link, use a hammer and a chisel to remove the retaining ring. Be careful not to damage the groove of the track link. The angle and depth of the groove are important.
Illustration 12 | g01348188 |
(4) Bolster |
Preparation for Assembly
- Remove any burrs or material from the spot face of track link (5) that will interfere with Tooling (FF).
Show/hide table
Illustration 25 g02085433 - Thoroughly clean the track link counterbores for the seals with Tooling (K) and (L).
Note: Tooling (L) should be rated at the maximum rpm rating of Tooling (K). Make sure that all debris is removed from the retaining ramp on the track link.
Show/hide tableIllustration 26 g02085475 - Wipe the track link counterbore with Tooling (X).
Note: Tooling (X) is a lint free cloth.
- Inspect the bushing for reusability.
Note: Refer to Undercarriage Reconditioning Bulletin, SEBF8558, "Guideline for Reusable Track Parts".
Post Turn Seals are now available for all D11T/R/N, D11, D10T/R/N, and D10 track link assemblies. These new seals have a smaller diameter than the standard seals. If a bushing has a maximum of 50 percent end grooving and the bushing is being reused, the Post Turn Seal should be used. The Post Turn Seal will contact a new, unworn surface of the bushing which will provide a better reliability of the seal after service. Reference Information Release Memo, PELJ0242, "New D11R/N Post Turn Seals" and Information Release Memo, PELJ0443, "D10R/N and D10 Post Turn Seals" for more information.
Use the new 241-1854 Seal Installer with the D11T/R/N and D11 Post Turn Seal. Use the new 262-9822 Seal Installer with the D10T/R/N and D10 Post Turn Seal.
The standard seal is still available for use when the bushings are replaced. If the end grooving exists inside Tooling (CC), the bushing should be replaced. Ignore the shiny band of contact area. Reference Undercarriage Reconditioning Bulletin, SEBF8558, "Guideline for Reusable Track Parts".
Refer to Table 9, Table 10, or Parts Sales Kit, PECP3003 for the seal part numbers.
Show/hide tableTable 9 D11T/R/N
D11Standard Seal Post Turn Seal Seal Assembly 222-7007 261-4338 Seal Set 248-5531 261-4408 Show/hide tableTable 10 D10T/R/N
D10Standard Seal Post Turn Seal Seal Assembly 222-7001 252-6327 (1)Seal Set 239-5272 252-6329 Show/hide table(1) 235-2213 Thrust Ring must be used with these seals.Show/hide tableIllustration 27 g01176012 Standard Seal
(1) Seal
(2) Link
(3) Bushing
(4) Thrust ring
(5) PinShow/hide tableIllustration 28 g01176060 Post Turn Seal
(1) Seal
(2) Link
(3) Bushing
(4) Thrust ring
(5) PinShow/hide tableIllustration 29 g01348269 - Place the seal into Tooling (BB).
Show/hide table
Illustration 30 g01348272 - Use Tooling (BB) to install the seals. Make sure that the seal is seated properly in the track link counterbore and use a firm even pressure to properly seat the seal.
Note: For ease of seal installation, the outer load ring should be lubricated with a light weight oil.
Note: Do not lubricate the track pin, the bore of the track pin, or the bore of the bushing.
Show/hide tableNOTICE Do not damage the seal face or the bushing ends. Cleaning the bushing ends with abrasives will damage the seal surface. It is critical that the bushing faces are not scratched from metal to metal contact or sliding them on any surface. If parts are to be put in storage, protect them from damage and corrosion. Corrosion in the seal band area will cause the seal to fail.
Show/hide tableIllustration 31 g01348283 - Install the optional facing group (1) on Tooling (BB) with the adhesive side facing upward.
Note: The facing group is optional to help achieve proper articulation of the joint after installation on the tractor. However, unlocking the track joint is the best practice to achieve the proper end play.
Note: Thrust rings can be ordered with the applied ring. Refer to Parts Sales Kit, PECP3003 for the correct part numbers for the thrust rings.
Show/hide tableIllustration 32 g01348285 - Slide the thrust ring onto Tooling (BB). Press firmly on the thrust ring until the ring adheres to the thrust ring.
- Remove the thrust ring from Tooling (BB).
- Repeat Steps 7 through 9 for the reverse side of the thrust ring.
- Install the thrust ring into the track link counterbore.
Note: Applying a thin layer of molybdenum grease to the face of the thrust ring may help hold the thrust ring in the track link counterbore.
- Repeat Steps 7 through 11 for the other track link counterbores.
Show/hide table
Illustration 33 g01159791 - Inspect each track pin for excessive wear or damage, plugged crossholes, or other signs of damage such as spalling or galling.
Note: Refer to Undercarriage Reconditioning Bulletin, SEBF8558, "Guideline for Reusable Track Parts".
Show/hide tableNOTICE Do not grind the end of the pin. Any change in the pin end will adversely affect assembly and result in damage to tooling and track. Small burrs may be removed with very light grinding.
Show/hide tableIllustration 34 g02085476 Show/hide tableIllustration 35 g01237738 - Lubricate the stopper with a light weight oil and install the stopper in the end of the track pin with Tooling (M).
Note: The stopper must be installed
7.0 ± 7.0 mm (0.28 ± 0.28 inch) below the surface of the track pin.Note: Absorption of the oil by the stopper causes the rubber to swell. Swelling of the stopper locks the stopper in place. Installing all stoppers before inspecting the remaining track components will allow time for the stoppers to swell. The plastic plugs will be installed later.
Note: The 5130 and 5110 have the Grease Lubricated Track. Therefore, the track pin does not have an oil reservoir.
Note: Assembly which involves track bushings and track links must be done on the track press. Tooling for removal of the bushing in the field is not available. Refer to Undercarriage Reconditioning Bulletin, SEBF8546, "Shop Repair Procedure for Positive Pin Retention Track".
Note: Carefully clean the track pins, bushings, thrust rings, and track links. A cross section of a track joint is shown in Illustration 1 to help the serviceman identify the track components. Inspection of the track components is easier when the track pins are clean. Cleaning the track pins removes any foreign material and contaminated oil.
Note: For current reuse information of the track components, refer to Undercarriage Reconditioning Bulletin, SEBF8558, "Guideline for Reusable Track Parts".
Note: Whenever any track joint is disassembled, always replace the seal with a new seal.
Illustration 24 | g01159773 |
(5) Spot face of the track link |
Assembly of Track
- Attach a hoist to the new set of track links.
- Use Tooling (J) to spread the adjacent track links open so the bushing can pass by the seals.
Show/hide table
NOTICE Maximum care should be used to prevent the bushing from contacting the seal lips as the joint is brought into alignment. The seal lips can be cut as the bushing slides past.
- Align the bushing with the seals and lower the hoist to position the pairs of track links together.
Show/hide table
Illustration 36 g01348286 - Install Tooling (AA).
- Release the hydraulic pressure and remove Tooling (J).
- Repeat Steps 3 through 5 for the opposite end of the new set of track links.
Show/hide table
Illustration 37 g01160912 - Install Tooling (G) around the joint of the track assembly with the proper Tooling (Y) and (EE).
- Align tooling with the track links and the track pin.
- Install the new track pin with the crosshole toward the wear surface of the track links. Position the track pin so the oil hole faces the same side of the track as the other track pins.
- For the 5130 and 5110, apply an even coat of grease to the track pin and the inner diameter of the bushing. Wipe the excess grease off the ends of the track pin and the bushing with Tooling (X).
Note: Refer to Table 11 for the correct part numbers for the grease.
Show/hide tableTable 11 Specifications for the Grease Part Number Grease Quantity 161-9203 Ultra 5Moly Grease
NLGI No. 1Cartridge 183-3432 Ultra 5Moly Grease
NLGI No. 116 kg (35.0 lb) 161-0970 Ultra 5Moly Grease
NLGI No. 154 kg (120.0 lb) 161-0971 Ultra 5Moly Grease
NLGI No. 1181 kg (400.0 lb) Show/hide tableNOTICE The track pin must always be installed so the cross drilled hole is towards the wear surface of the track links. The track pin must be installed in this position to ensure minimum load on the track pin in the area of the cross drilled hole. The track pin may break if installed with the cross drilled hole in any other position.
Show/hide tableIllustration 38 g01348287 (6) Track pin Show/hide tableNOTICE When the pin is installed to the correct depth, it will protrude above the spot face on the link surface.
The pin projection adapters have the proper pin projection built in and the correct pin projection should occur automatically, provided the tooling is maintained in good condition and all foreign material (burrs and cold-flowed material) is removed from the spot face surfaces on the links.
Correct pin projection is necessary to align the retaining ring groove on the pin with the retaining ring ramp in the link. Unless these are in alignment, the ring will not provide the desired retention.
Show/hide tableNOTICE Make sure the correct hydraulic pressure is used for the assembly procedure. Hydraulic pressure outside the specification will result in poorly assembled joints or joints with excessive end play.
- Press the track pin into the pin bores of the track link until the track pin is approximately
13.0 mm (0.52 inch) from the spot face of the track link.Show/hide tableIllustration 39 g01348288 - Install Tooling (FF) on Tooling (G).
- Press the track pin completely into the bores of the track link.
Note: Do not remove Tooling (AA) from the bore of the track until the track pin is installed completely.
- Use Tooling (P) to measure the pin projection of the track link assembly. Refer to Table 12 for the correct pin projection.
Show/hide table
Table 12 Model Pin Projection D11T/R/N
5130B
51301.80 ± 0.13 mm (0.071 ± 0.005 inch) D10T/R/N
D101.97 ± 0.13 mm (0.078 ± 0.005 inch) 5110B 1.95 ± 0.13 mm (0.077 ± 0.005 inch) D9T/R/N
D9L
589
D8T/R/N
587T/R
583T/R
578
PL83
PL872.00 ± 0.13 mm (0.079 ± 0.005 inch) - Move the tooling to the second track joint and repeat Steps 8 through 14.
Show/hide table
Illustration 40 g02085478 Retaining rings Show/hide tableIllustration 41 g01160080 - Install a retaining ring on each end of the track pin.
Show/hide table
Illustration 42 g01941777 - Install Tooling (GG) and align Tooling (GG) on both sides of the track joint.
Note: Rotate the extruders several times as the spring-loaded centers are compressed.
Show/hide tableNOTICE Careful alignment is necessary to make sure the lands of the extruder do not contact the pin ends. Contact can cause the extruding land to break off the extruder assembly, damaging the tooling and the link assembly.
Show/hide tableIllustration 43 g02085479 - Press the retaining rings into the groove of the track link. Refer to Table 13 for the maximum allowable force.
- Remove Tooling (GG).
Note: Tap the tooling with a hammer if the tooling sticks to the end of the ring.
Show/hide tableIllustration 44 g01348292 - Install Tooling (Z) on both sides of the track joint.
Show/hide table
Illustration 45 g02085480 - Unlock the track joint by applying force to the track pin through Tooling (Z). Maximum allowable unlocking forces for unlocking the track joints are listed in Table 13.
Before unlocking, the joint will not articulate. Applying and releasing the unlocking force allows the links to move slightly outward. Unlocking gives the joint end play and the ability to articulate. Unlocking force must be adjusted to achieve proper end play values.
Show/hide tableTable 13 Sales Model Maximum Installation Force for the Retaining Ring Maximum Force for Unlocking the Joint D11T/R/N 1245 kN (280000.0 lb) 1334 kN (300000.0 lb) (1)5130B
51301245 kN (280000.0 lb) 1334 kN (300000.0 lb) (1)D10T/R/N
D10
5110B1070 kN (240000.0 lb) 1334 kN (300000.0 lb) (1)D9T/R/N
D9L
5891015 kN (230000.0 lb) 1330 kN (300000.0 lb) D8T/R/N
587T/R
583T/R
578
PL83
PL87845 kN (190000.0 lb) 1200 kN (270000.0 lb) Show/hide table(1) The maximum allowed unlocking force may not achieve full articulation of the track joint. However, installing the optional facing group on the thrust ring may aid in proper articulation of the joint once the track is put into service on the tractor. - Repeat Steps 16 through 21 for the second track joint.
- Remove Tooling (G) from the track link assembly.
- Check the end play of the track links.
- Use a pry bar to apply force on the track links at one of the recently assembled joints.
Show/hide table
Illustration 46 g02085481 - While the force is applied, set Tooling (R) to zero.
- Remove the force between these track links and apply force between the other two track links of the track joint.
- Read the total end play on the dial indicator while the force is applied to the track links.
Note: Acceptable end play is
0.03 mm to 0.20 mm (0.001 inch to 0.008 inch) .Show/hide tableIllustration 47 g02085482 - Check each assembled track joint for articulation. Articulation of the track joint will aid in field installation.
- Repeat Steps 24 through 29 for the second track joint.
Lubrication of the Track Joint
The 5130 and 5110 have the Grease Lubricated Track. Lubrication of the track joints should have been done during assembly of the track with the specified grease. This section of the service does not need to be performed.
NOTICE |
---|
Before track joints can be filled with oil, the joint must be checked for leaks. The following methods are recommended to ensure a proper seal before lubrication. |
Refer to Undercarriage Reconditioning Bulletin, SEBF8594, "Nitrogen Pressure Test Unit".
- Introduce nitrogen into the oil cavity to a pressure of
138 kPa (20.0 psi) with Tooling (S).Note: The cavity must be sealed and pressure must be observed for 10 seconds.
Note: A pressure drop of
3.5 kPa (0.50 psi) or less is acceptable.Show/hide tableNOTICE Do not allow a surge of air to enter the track joint and do not use pressure in excess of
138 kPa (20 psi) . - Fill track joints with oil. Refer to Undercarriage Reconditioning Bulletin, SEBF8577, "Oil Volumes for Track Link Assemblies".
Note: Caterpillar uses only synthetic oil for filling the track pins. This oil was previously used for arctic applications. This oil is now the standard oil from the factory. This oil is recommended for use at the turn of the bushing or reseal. Refer to Table 14.
Note: The synthetic oil is available in the following quantities:
Show/hide tableTable 14 Part Number Part Description Quantity 242-3466 Gear Oil (75W-140) 19 L (5.0 US gal) 242-3467 Gear Oil (75W-140) 208 L (55.0 US gal) Show/hide tableIllustration 49 g02086953 - Use Tooling (N) to install the plastic plug in the rubber stopper.
Note: Install the tapered end of the plug into the stopper first.
Note: The plastic plug must protrude
0.0 mm to 5.0 mm (0.00 inch to 0.20 inch) out of the rubber stopper. The plug can vibrate into the cavity of the track pin if the plug is pushed fully into the stopper hole.
Illustration 48 | g02085483 |
Tooling (S) |
Preparation for Installation of the Track Shoes
- All paint, loose rust, metal debris, and dirt must be removed from the mating surfaces of the track shoes, track bolts, track nuts, the seats of the track nuts, and the track links.
Remove paint on the mating surfaces of new link assemblies and new track shoes before installation. The correct clamping force cannot be achieved if the paint is not removed. The following methods may be used to remove the paint:
- Use a sandpaper of 24 grit to remove the paint from the mating surfaces of the track links and track shoes. A light mist of water should be sprayed on the mating surface during sanding. The water will keep the sandpaper clean during sanding.
- A paint remover may be used to remove the paint from the mating surfaces of the track links and the track shoes. Make sure that the paint remover does not contact the track seal. The paint remover can damage the track seal.
- Do not use a torch to remove the paint from the mating surfaces of the track links and master track links. The high temperatures can damage to the track seals.
- Do not drag the track link assembly across the ground to remove the paint from the mating surfaces of the track links. Dragging of the track link assembly may damage to the master track joint and other track components. High spots may be created on the track links. Dragging the track link assembly may cause the track joints to open.
Note: The track bolts and the threads of the track nuts must be in good condition.
- Lubricate the threads of the track bolts and lubricate the mating surface of the bolt head with Tooling (U).
- Clean the teeth of the split master links.
- Remove dirt, loose rust, and debris from the bolt holes of the master track link.
Note: Reuse track bolts in good condition and replace damaged track bolts.
Illustration 50 | g01160153 |
Installation of the Track Chain
- Fasten a cable and chain to the track.
Show/hide table
Illustration 52 g01160156 - Fasten the other end of the cable to another tractor or similar machine to pull the track over the front idler.
- Block the other end of the track. Refer to Step 6 in Preparation for Removal of the Track Joint.
- Pull the track until the track bushings engage with the sprocket segments on the final drive.
Show/hide table
NOTICE Make sure to pull the cable in a straight line.
- Start the machine and turn the final drive in a reverse direction to pull the track together.
Show/hide table
Illustration 53 g01160160 - Place the lower end of the master link in alignment with the upper end of the master link.
Note: Make sure that the teeth of both ends of the master link are engaged properly with no interference.
Note: Close one master link so the teeth are in full contact. The other master link should have no more than a
3.2 mm (0.13 inch) gap between the teeth. - Place the master shoe in position.
- Start all four master track bolts by hand.
Show/hide table
Illustration 54 g01160163 - Use Tooling (A) to tighten the master track bolts to the specified preliminary torque in Table 15.
Note: Do not force the track bolts if the holes are not aligned or the threads will be damaged.
Show/hide tableTable 15 Torque Specifications for the Track Shoe Bolts Method for the Torque Turn Sales Model Bolt Size and Threads per Inch Part Number for the Socket Part Number for the Worn Socket Preliminary Torque Additional Turn for the Master Track Bolt Additional Turn for the Standard Track Bolt D11T/R/N 1 3/8"-12 8T-9174 8T-9175 1500 ± 150 N·m (1100.0 ± 110.0 lb ft) 180° 120° D10T/R/N 1 1/8"-12 1U-8586 1U-8798 870 ± 90 N·m (640.0 ± 65.0 lb ft) 120° 120° D10 1 1/8"-12 1U-8586 1U-8798 870 ± 90 N·m (640.0 ± 65.0 lb ft) 180° 120° D9T/R/N
D9L
5891"-14 9S-6371 (1)5P-3581 (1)870 ± 90 N·m (640.0 ± 65.0 lb ft) 120° 120° D8T/R/N
587T/R
583T/R
578
PL83
PL877/8"-14 9S-6372 (1)5P-3580 (1)650 ± 70 N·m (480.0 ± 50.0 lb ft) 120° 120° 5130B
51301 3/8"-12 8T-9174 8T-9175 1500 ± 150 N·m (1100.0 ± 110.0 lb ft) -- 120° 5110B 1 1/8"-12 1U-8586 1U-8798 870 ± 90 N·m (640.0 ± 65.0 lb ft) -- 120° Show/hide table(1) Use with 9S-4026 Adapter and9S-4027 Extension - Perform the additional turn on the master track bolts. Refer to Table 15 for the correct additional turn. Follow the correct pattern to tighten the track bolts.
Note: Do not tighten the track bolts more than the recommended torque.
- All blocks, chains, and tooling should be removed.
- Install the remaining track shoes and use Tooling (A) to tighten the standard track bolts to the proper preliminary torque. Refer to Table 15 for the correct torque values.
- Perform the additional turn on the standard track bolts. Refer to Table 15 for the correct additional turn. Follow the correct pattern to tighten the track bolts.
Illustration 51 | g01160155 |
Track Adjustment Procedure