Distribution Board Installation (6 and 8 Cylinder Magnetos)
Usage:
1. Remove the magneto from the test bench.
2. Remove the four screws (1) from the magneto cover (2). Remove cover (2).
3. Disconnect all of the wires from terminal blocks (C) and (D). Remove four screws (4), then remove the distribution board.
4. Install the new distribution board, connect all of the wires as shown in the wiring diagrams and assemble the magneto.
5. Do the FAILURE ANALYSIS again to check the timing system and to be sure there is no other problem.
Caterpillar Information System:
SCSA SOLID STATE MAGNETO Distribution Board Installation (12 Cylinder Magneto)
SCSA SOLID STATE MAGNETO Mechanical Drive Disassembly
SCSA SOLID STATE MAGNETO Generator Coil Installation
SCSA SOLID STATE MAGNETO Failure Analysis
SCSA SOLID STATE MAGNETO Typical Ignition Cycle Per Cylinder
SCSA SOLID STATE MAGNETO Introduction
SCSA SOLID STATE MAGNETO Glossary
6.25" BORE ENGINE ATTACHMENTS Flexible Coupling (5L3395)
6.25" BORE ENGINE ATTACHMENTS Enclosed Clutches
6.25" BORE ENGINE ATTACHMENTS Hydraulic Starting System
6.25" BORE ENGINE ATTACHMENTS Air Starting Motors (3H3170, 3H3171)
6.25" BORE ENGINE ATTACHMENTS Prelubrication Pump And Air Motor
SCSA SOLID STATE MAGNETO Power Resistor Installation
SCSA SOLID STATE MAGNETO Power Board Installation
SCSA SOLID STATE MAGNETO Zener Diode Installation
SCSA SOLID STATE MAGNETO Storage Capacitor Installation
SCSA SOLID STATE MAGNETO Pulser Coil Installation
G333C ENGINE Magneto
G333C ENGINE Governor And Governor Drive
G333C ENGINE Governor
G333C ENGINE Governor Drive
G333C ENGINE Oil Cooler And Filter Base
G333C ENGINE Auxiliary Water Pump
G333C ENGINE Auxiliary Water Pump Drive