C2.2 Engines for Caterpillar Built Machines Caterpillar


Throttle Valve (Intake Air) - Install

Usage:

239D BL9

Installation Procedure

Table 1
Required Tools 
Tool  Part Number  Part Description  Qty 
Anti-Seize Compound 


NOTICE

Keep all parts clean from contaminants.

Contaminants may cause rapid wear and shortened component life.


  1. Ensure that all components are clean and free from wear and damage. If necessary, replace any components that are worn or damaged.


    Illustration 1g03819693
    Typical example

  2. Clean the gasket surface of exhaust gas recirculation valve (2) and the inlet manifold.

  3. Position a new gasket (7) (not shown) onto throttle valve (2). Ensure that the gasket is correctly orientated.

  4. Position throttle valve (2) onto the inlet manifold.

  5. Apply Tooling (A) to the threads of bolts (4).

  6. Install bolts (4) to throttle valve (2). Tighten the bolts to a torque of 10 N·m (89 lb in).

  7. Connect harness assembly (1) for throttle valve (2).
Back to top
The names Caterpillar, John Deere, JD, JCB, Hyundai or any other original equipment manufacturers are registered trademarks of the respective original equipment manufacturers. All names, descriptions, numbers and symbols are used for reference purposes only.
CH-Part.com is in no way associated with any of the manufacturers we have listed. All manufacturer's names and descriptions are for reference only.