Field Installation of the Payload Control System{7494} Caterpillar


Field Installation of the Payload Control System{7494}

Usage:

966G II ANT
Wheel Loader:
938G Series II (S/N: CRD1-UP)
950G Series II (S/N: AXR1-UP; AXX1-UP)
962G Series II (S/N: AXS1-UP; AXY1-UP)
966G Series II (S/N: ANT1-UP; ANZ1-UP)
972G Series II (S/N: AWP1-UP; ANY1-UP)
980G Series II (S/N: AWH1-UP)

Introduction

Information that is contained in this publication is for the field installation of the following kits for the payload control system:

  • 2Q-8547 Payload Monitor Gp (Kit) for the 938G Series II (S/N: CRD1-UP)

  • 2Q-8050 Payload Monitor Gp (Kit) for the 950G Series II (S/N: AXR1-UP) and the 962G Series II (S/N: AXS1-UP)

  • 2Q-8048 Payload Monitor Gp (Kit) for the 950G Series II (S/N: AXX1-UP) and the 962G Series II (S/N: AXY1-UP)

  • 2Q-8590 Payload Monitor Gp (Kit) for the 966G Series II (S/N: ANT1-UP) and the 972G Series II (S/N: ANY1-UP)

  • 2Q-8576 Payload Monitor Gp (Kit) for the 966G Series II (S/N: ANZ1-UP) and the 972G Series II (S/N: AWP1-UP)

  • 2Q-8557 Payload Monitor Gp (Kit) for the 980G Series II (S/N: AWH1-UP)

A complete listing of the parts that is contained in this kit is listed in the Parts Manual, SEBC1330. This supplemental product support literature should be used with the appropriate Service Manual that is available for the standard machine.

Do not perform any procedure and do not order parts that are outlined in this publication until you understand the information that is contained in this document.

  • 950G Series II Wheel Loader and the 962G Series II Wheel Loader

ReferenceOperation and Maintenance Manual, SEBU7459, "PAYLOAD CONTROL SYSTEM (PCS)"

  • 966G Series II Wheel Loader and the 972G Series II Wheel Loader

ReferenceOperation and Maintenance Manual, SEBU7458, "PAYLOAD CONTROL SYSTEM (PCS)"

  • 980G Series II Wheel Loader

ReferenceOperation and Maintenance Manual, SEBU7012, "PAYLOAD CONTROL SYSTEM (PCS)"

  • All models

ReferenceSYSTEMS OPERATION, TROUBLESHOOTING, TESTING AND ADJUSTING, SENR6614, "PAYLOAD CONTROL SYSTEM (PCS)"

ReferenceVIDEO, AEHQ5197, "PAYLOAD CONTROL SYSTEM (PCS)"

General Information

------ WARNING! ------

Sudden movement or accidental starting of the machine can cause personal injury or death to persons on or near the machine.

To prevent personal injury or death, perform the following:

Park the machine on a smooth, level surface.

Lower the work tool to the ground and engage the parking brake.

Stop the engine and remove the key.

Block the wheels and install the steering frame lock.

----------------------

Installation of 2Q-8547 Payload Monitor Gp (Kit) on the 938G Series II Wheel Loader (S/N: CRD1-UP)

Installation of the Sensor Wiring Gp




Illustration 1g01331870

Right side view of front frame

(D) Existing check valve

(E) Front wiring harness




Illustration 2g01331873

Front view of front frame

(E) Front wiring harness

Installation of 219-2384 Position Sensor Group (Lift)

  1. Install one 6D-3025 Ball Bearing (37) into the 4E-2250 Housing (21) .

  1. Install one 2L-6726 Retaining Ring (39) into the 4E-2250 Housing (21) .

    Note: This 2L-6726 Retaining Ring (39) serves as a spacer. The 4E-2250 Housing (21) has no groove for the 2L-6726 Retaining Ring (39) .

  1. Install the other 6D-3025 Ball Bearing (37) into the 4E-2250 Housing (21) .

  1. Install the other 2L-6726 Retaining Ring (39) into the groove in the 4E-2250 Housing (21) .

  1. Slide the 4E-2453 Governor Control Shaft (38) into the 4E-2250 Housing (21) from the front. Then slide the 4E-2453 Governor Control Shaft (38) through the two 6D-3025 Ball Bearings (37) .

  1. Install the 2H-3429 Retaining Ring (31) onto the 4E-2453 Governor Control Shaft (38) .

  1. Install one 8C-5608 Spacer (35) and two 8C-5607 Mounts (34) in each of the three holes in the 4E-2250 Housing (21) .

  1. Use the following hardware to install the 219-2384 Position Sensor Group (Lift) (28) to the back of 4E-2250 Housing (21) :

  1. Use the following hardware to install the 129-6792 Bail Arm (25) onto lift arm:

  1. Use the following hardware to install the 4E-2250 Housing (21) onto the 7I-3236 Support (23) :

  1. Use the following hardware to install the 7I-3236 Support Bracket (23) onto the studs on the frame:

  1. Place lift arm in the lowest possible position. Place the bucket in the fully racked back position.

  1. Use the following hardware to install the 6S-4868 Lever (22) onto the 4E-2453 Governor Control Shaft (38) :

    Note: Do not tighten the 9B-7237 Bolt (19) on the 4E-2453 Governor Control Shaft (38) at this time.

  1. Assemble one 6V-8186 Full Nut (27) and 8K-1253 Rod End (26) completely onto one end of 129-6791 Rod (24) .

  1. Assemble one 8L-4496 Jam Nut (16) and 5P-9683 Rod End (15) completely onto the other end of 129-6791 Rod (24) .

  1. Set the length between the centerlines of the rod ends to 284 mm (11.1811 inch) by turning the 129-6791 Rod (24) .

  1. Use a 8T-4224 Hard Washer (18) and connect 8K-1253 Rod End (26) to 129-6792 Bail Arm (25) .

  1. Use the following hardware to connect the other rod end to the 6S-4868 Lever (22) :

  1. Connect the 219-2384 Position Sensor Group (Lift) (28) lead to the front wiring harness (E). Secure the 219-2384 Position Sensor Group (Lift) (28) lead with two 3S-2093 Cable Straps (3) .

Installation of 124-4672 Pressure Sensor Group (Payload Control System)

  1. Use the following hardware to mount the 4E-2448 Bracket (11) onto the frame:

  1. Install the 124-4672 Pressure Sensor Group (Payload Control System) (9) onto the 4E-2448 Bracket (11) .

  1. Install the 6V-8636 Connector (12) and a 3J-1907 O-Ring Seal (6) onto the 124-4672 Pressure Sensor Group (Payload Control System) (9) .

  1. Install the 6V-9850 Swivel Elbow (13) and a 6V-8397 O-Ring Seal (7) onto the 6V-8636 Connector (12) .

    Note: The following steps 5 through 9 are used to place the 126-6872 Tee (5) in line with the existing check valve (D) .

  1. Remove the existing check valve (D) and install the 126-6872 Tee (5). Use the existing seal.

  1. Use a 3J-1907 O-Ring Seal (6) and reinstall the existing check valve (D) onto the top of the 126-6872 Tee (5) .

  1. Install 122-2222 Adapter (10) and a 6V-8397 Seal O-Ring (7) onto the 126-6872 Tee (5) .

  1. Use a 6V-8397 O-Ring Seal (7) and connect the straight end of 102-5912 Hose As (8) onto the 122-2222 Adapter (10) .

  1. Use a 6V-8397 O-Ring Seal (7) and connect the other end of 102-5912 Hose As (8) onto the 6V-9850 Swivel Elbow (13) .

  1. Connect one end of 129-8111 Monitor Harness As (4) to the 124-4672 Pressure Sensor Group (Payload Control System) (9) .

  1. Refer to Illustration 2 and route the 129-8111 Monitor Harness As (4). Secure the 129-8111 Monitor Harness As (4) with five 3S-2093 Cable Straps (3) .

  1. Connect the other end of 129-8111 Monitor Harness As (4) to the front wiring harness (E) .

Installation of the Payload Monitor Gp




Illustration 3g01332129

Front view of cab

(D) Main cab harness

  1. Use four 7Y-7256 Screws (51) to install 297-1398 Payload Keypad Module (45) onto the 136-9192 Plate As (49) .

  1. Use four 7Y-7256 Screws (51) to install 237-0825 Monitor Electronic Control Module (43) onto the 136-9192 Plate As (49) .

  1. Place the 2G-1133 Grommet (50) on the 135-1922 Monitor Harness As (46) near the end with the plug for the 297-1398 Payload Keypad Module (45) .

  1. Install the 115-1748 Lamp (44) into the lamp socket on the 135-1922 Monitor Harness As (46). Install the lamp socket into the 297-1398 Payload Keypad Module (45) .

  1. Connect the proper plug on the 135-1922 Monitor Harness As (46) to the 297-1398 Payload Keypad Module (45) .

  1. Connect the proper plug on the 135-1922 Monitor Harness As (46) to the 237-0825 Monitor Electronic Control Module (43) .

  1. Install the 2G-1133 Grommet (50) into the side of 136-9190 Cover (47). Refer to Section C-C in Illustration 3.

  1. Use six 9X-2042 Screws to install the 136-9190 Cover (47) onto the 136-9192 Plate As (49). Install the 236-8117 Film (56) on the top of the 136-9190 Cover (47) .

  1. Use two 8T-4171 Bolts (52) and two 9X-8256 Washers (55) to install 136-9191 Plate (48) in the cab. Refer to Illustration 3.

  1. Use three 9X-2043 Screws (54) to install the 136-9190 Cover (47) onto the 136-9191 Plate (48) .

  1. Route the 135-1922 Monitor Harness As (46). Refer to Illustration 3.

  1. Use five 7K-1181 Cable Straps (42) in order to secure the 135-1922 Monitor Harness As (46) .

  1. Connect the twelve pin plug on the 135-1922 Monitor Harness As (46) onto the main cab harness that is located in the overhead console.

  1. Refer to SYSTEMS OPERATION, TROUBLESHOOTING, TESTING AND ADJUSTING, SENR6614, "PAYLOAD CONTROL SYSTEM (PCS)" for adjustment procedures.

Installation of 2Q-8050 Payload Monitor Gp (Kit) on the 950G Series II Wheel Loader (S/N: AXR1-UP) and the 962G Series II Wheel Loader (S/N: AXS1-UP)

Installation of Pressure Sensor Mounting Group




Illustration 4g01332146

Top and right side view of pressure sensor mounting group

(B) Front wiring group

  1. Use the following hardware to install the 222-9995 Bracket (6) to the frame:

  1. Use the hardware that is included with the 124-4672 Pressure Sensor Group (Payload Control System) (3) and install the 124-4672 Pressure Sensor Group (Payload Control System) (3) onto the 222-9995 Bracket (6) .

  1. Install the 126-6872 Tee (4) and a 3J-1907 O-Ring Seal (9) onto the 124-4672 Pressure Sensor Group (Payload Control System) (3) .

  1. Install the 6V-3965 Fitting As (11) and a 3J-1907 O-Ring Seal (9) onto the 126-6872 Tee (4) .

  1. Install a 6V-0852 Dust Cap (1) onto the 6V-3965 Fitting As (11) .

    Note: The next three steps are only necessary if the machine does not have ride control. If the machine has ride control go to Step 10.

  1. If the machine does not have ride control install a 6V-8636 Connector (13) and a 3J-1907 O-Ring Seal (9) into the main control valve and mounting group.

  1. If the machine does not have ride control install a 122-2222 Adapter (2) and a 6V-8397 O-Ring Seal (12) into the 6V-8636 Connector (13) .

  1. If the machine does not have ride control install a 6V-9850 Swivel Elbow (14) and a 6V-8397 O-Ring Seal (12) into the 122-2222 Adapter (2) .

  1. If the machine does not have ride control connect the straight end of 125-9488 Hose As (8) and a 6V-8397 O-Ring Seal (123) onto the 6V-9850 Swivel Elbow (14) .

  1. If the machine has ride control install a 122-2222 Adapter (2) and a 6V-8397 O-Ring Seal (12) into the existing Tee on the main control valve and mounting group.

  1. If the machine has ride control connect the straight end of 125-9488 Hose As (8) and a 6V-8397 O-Ring Seal (123) onto the 122-2222 Adapter (2) .

  1. Connect the other end of 125-9488 Hose As (8) and a 6V-8397 O-Ring Seal (12) onto the 126-6872 Tee (4) .

  1. Connect the 124-4672 Pressure Sensor Group (Payload Control System) (3) lead to the proper plug on the 147-2764 Harness (5).

  1. Refer to Illustration 4 to route 147-2764 Harness (5). Use the following hardware to secure the 147-2764 Harness (5) :

  1. Connect the other end of 147-2764 Harness (5) to the front wiring group (B) .

Installation of the Payload Monitor Gp




Illustration 5g01105564

Payload monitor gp

  1. Use two 9X-2040 Screws (29) and install the 195-0973 Bracket (8) on the right front cab post.

  1. Use two 9X-2040 Screws (29) and install the 241-6393 Bracket (22) on the right front cab post.

  1. Use two 9X-2040 Screws (29) and install the 241-4227 Bracket (21) on the right front cab post.

  1. Use the following hardware and install the 224-9368 Bracket As (19) onto the back of the 228-7137 Rear Cover (20) :

  1. Use four 7Y-7256 Screws (26) and install the 297-1398 Payload Keypad Module (6) onto the 224-9364 Bracket (17) .

  1. Run the plug on the 297-1398 Payload Keypad Module (6) through the 228-7137 Rear Cover (20) .

  1. Install two 6K-8180 Grommets (3) into the 228-7137 Rear Cover (20) .

  1. Install the 228-7137 Rear Cover (20) and the 198-6588 Front Cover (12) onto the 224-9364 Bracket (17). Use three 9X-2045 Screws (31) to secure the covers.

  1. Use four 9X-2042 Screws (30) to install the 198-1941 Hinge Assembly (11) and 224-9364 Bracket (17) onto the 241-6393 Bracket (22) .

  1. Install a 210-7018 Latch Assembly (16) onto the 224-9368 Bracket (19) .

  1. Use the following hardware to install the 283-1636 Monitor Electronic Control Module (Payload) (23) onto the 195-0975 Bracket (9) :

  1. Use four 9X-8917 Screws (5) and install the 199-3417 Plate (13) onto the 210-7016 Cover (Rear) (15) .

  1. Use the following hardware to install the 224-9367 Bracket (18) onto the 210-7016 Cover (Rear) (15) :

  1. Install the 205-4933 Film (14) onto the 224-9367 Bracket (18) .

  1. Install a 210-7018 Latch Assembly (16) onto the 224-9367 Bracket (18) .

  1. Connect the 188-1421 Monitor Harness As (7) to the main cab harness which is located in the overhead console.

  1. Install the 7N-5876 Lamp (4) into the lamp socket that is on the 188-1421 Monitor Harness As (7) .

  1. Insert the lamp socket that is on the 188-1421 Monitor Harness As (7) into the empty 6K-8180 Grommet (3) that is on the back of the 228-7137 Rear Cover (20) .

  1. Connect the connector with three pins that is on the 188-1421 Monitor Harness As (7) to the connector that is on the 297-1398 Payload Keypad Module (6). Secure the connector with three pins that is on the 188-1421 Monitor Harness As (7) with one 3S-2093 Cable Strap (2) .

  1. Insert the other two connectors on the 188-1421 Monitor Harness As (7) through the rear of the 210-7016 Cover (Rear) (15).

  1. Install one 8T-9471 Grommet (28) around the 188-1421 Monitor Harness As (7) and into the hole in the rear of 210-7016 Cover (Rear) (15) .

  1. Use three 9X-8917 Screws (5) and install the connector with five pins on the 188-1421 Monitor Harness As (7) onto the 199-3417 Plate (13) .

  1. Install the 3E-5165 Protection Cap Assembly (1) onto the connector with five pins.

  1. Connect the other connector onto the 283-1636 Monitor Electronic Control Module (Payload) (23) .

  1. Use three 9X-2045 Screws (31) and install the 210-7016 Cover (Rear) (15) and the 195-0976 Front Cover (10) .

  1. Install the 236-8117 Film (33) onto the 195-0976 Front Cover (10) just above the display.

  1. Use four 9X-2042 Screws (30) to install the 198-1941 Hinge Assembly (11) and 195-0975 Bracket (9) onto the 195-0973 Bracket (8) .

Installation of 2Q-8048 Payload Monitor Gp (KIT) on the 950G Series II Wheel Loader (S/N: AXX1-UP) and the 962G Series II Wheel Loader (S/N: AXY1-UP)

Installation of the Mounting Group for the Position Sensor




Illustration 6g01332159

Right side and front views of the mounting group for the position sensor

  1. Use the following hardware and mount the 169-0417 Position Sensor Group (Lift) (5) onto the 199-4064 Bracket (7) :

  1. Use the following hardware and install the 214-3616 Plate (8) onto the 169-0417 Position Sensor Group (Lift) (5) shaft:

  1. Use the following hardware and install the 130-5300 Clip (3) onto the 199-4064 Bracket (7) :

  1. Refer to Section B-B in Illustration 6. Assemble the following parts:

  1. Connect one of the 7X-7662 Rod Ends (1) onto the 214-3616 Plate (8) that is mounted on the 169-0417 Position Sensor Group (Lift) (5) .

  1. Use the following hardware and install the 179-7000 Arm (6) onto the Lift Arm:

  1. Use the following hardware and install the 199-4064 Bracket (7) onto the Front Frame of the Machine:

  1. Connect the other 7X-7662 Rod End (1) onto the 199-4064 Bracket (7) .

  1. Connect the plug on the power lead of the 169-0417 Position Sensor Group (Lift) (5) onto the proper plug on the front wiring harness. The proper plug is located near the lift position sensor.

Installation of Pressure Sensor Mounting Group




Illustration 7g01332191

Top and right side view of pressure sensor mounting group

(B) Front wiring group

  1. Use the following hardware to install the 222-9995 Bracket (6) to the frame:

  1. Use the hardware that is included with the 124-4672 Pressure Sensor Group (Payload Control System) (3) and install the 124-4672 Pressure Sensor (3) onto the 222-9995 Bracket (6) .

  1. Install the 126-6872 Tee (4) and a 3J-1907 O-Ring Seal (9) onto the 124-4672 Pressure Sensor (3) .

  1. Install the 6V-3965 Fitting As (11) and a 3J-1907 O-Ring Seal (9) onto the 126-6872 Tee (4) .

  1. Install a 6V-0852 Dust Cap (1) onto the 6V-3965 Fitting As (11) .

    Note: The next three steps are only necessary if the machine does not have ride control. If the machine has ride control go to Step10.

  1. If the machine does not have ride control install a 6V-8636 Connector (13) and a 3J-1907 O-Ring Seal (9) into the main control valve and mounting group.

  1. If the machine does not have ride control install a 122-2222 Adapter (2) and a 6V-8397 O-Ring Seal (12) into the 6V-8636 Connector (13) .

  1. If the machine does not have ride control install a 6V-9850 Swivel Elbow (14) and a 6V-8397 O-Ring Seal (12) into the 122-2222 Adapter (2) .

  1. If the machine does not have ride control connect the straight end of 125-9488 Hose As (8) and a 6V-8397 O-Ring Seal (123) onto the 6V-9850 Swivel Elbow (14) .

  1. If the machine has ride control install a 122-2222 Adapter (2) and a 6V-8397 O-Ring Seal (12) into the existing Tee on the main control valve and mounting group.

  1. If the machine has ride control connect the straight end of 125-9488 Hose As (8) and a 6V-8397 O-Ring Seal (123) onto the 122-2222 Adapter (2) .

  1. Connect the other end of 125-9488 Hose As (8) and a 6V-8397 O-Ring Seal (12) onto the 126-6872 Tee (4) .

  1. Connect the 124-4672 Pressure Sensor Group (Payload Control System) (3) lead to the proper plug on the 147-2764 Harness (5) .

  1. Refer to Illustration 7 to route 147-2764 Harness (5). Use the following hardware to secure the 147-2764 Harness (5) :

  1. Connect the other end of 147-2764 Harness (5) to the front wiring group (B) .

Installation of Payload Monitor




Illustration 8g01105564

Payload monitor gp

  1. Use two 9X-2040 Screws (29) and install the 195-0973 Bracket (8) on the right front cab post.

  1. Use two 9X-2040 Screws (29) and install the 241-6393 Bracket (22) on the right front cab post.

  1. Use two 9X-2040 Screws (29) and install the 241-4227 Bracket (21) on the right front cab post.

  1. Use the following hardware and install the 224-9368 Bracket As (19) onto the back of the 228-7137 Rear Cover (20) :

  1. Use four 7Y-7256 Screws (26) and install the 297-1398 Payload Keypad Module (6) onto the 224-9364 Bracket (17) .

  1. Run the plug on the 297-1398 Payload Keypad Module (6) through the 228-7137 Rear Cover (20) .

  1. Install two 6K-8180 Grommets (3) into the 228-7137 Rear Cover (20) .

  1. Install the 228-7137 Rear Cover (20) and the 198-6588 Front Cover (12) onto the 224-9364 Bracket (17). Use three 9X-2045 Screws (31) to secure the covers.

  1. Use four 9X-2042 Screws (30) to install the 198-1941 Hinge Assembly (11) and 224-9364 Bracket (17) onto the 241-6393 Bracket (22) .

  1. Install a 210-7018 Latch Assembly (16) onto the 224-9368 Bracket (19) .

  1. Use the following hardware to install the 283-1636 Monitor Electronic Control Module (Payload) (23) onto the 195-0975 Bracket (9) :

  1. Use four 9X-8917 Screws (5) and install the 199-3417 Plate (13) onto the 210-7016 Cover (Rear) (15) .

  1. Use the following hardware to install the 224-9367 Bracket (18) onto the 210-7016 Cover (Rear) (15) :

  1. Install the 205-4933 Film (14) onto the 224-9367 Bracket (18) .

  1. Install a 210-7018 Latch Assembly (16) onto the 224-9367 Bracket (18) .

  1. Connect the 188-1421 Monitor Harness As (7) to the main cab harness which is located in the overhead console.

  1. Install the 7N-5876 Lamp (4) into the lamp socket that is on the 188-1421 Monitor Harness As (7) .

  1. Insert the lamp socket that is on the 188-1421 Monitor Harness As (7) into the empty 6K-8180 Grommet (3) that is on the back of the 228-7137 Rear Cover (20) .

  1. Connect the connector with three pins that is on the 188-1421 Monitor Harness As (7) to the connector that is on the 297-1398 Payload Keypad Module (6). Secure the connector with three pins that is on the 188-1421 Monitor Harness As (7) with one 3S-2093 Cable Strap (2) .

  1. Insert the other two connectors on the 188-1421 Monitor Harness As (7) through the rear of the 210-7016 Cover (Rear) (15).

  1. Install one 8T-9471 Grommet (28) around the 188-1421 Monitor Harness As (7) and into the hole in the rear of 210-7016 Cover (Rear) (15) .

  1. Use three 9X-8917 Screws (5) and install the connector with five pins on the 188-1421 Monitor Harness As (7) onto the 199-3417 Plate (13) .

  1. Install the 3E-5165 Protection Cap Assembly (1) onto the connector with five pins.

  1. Connect the other connector onto the 283-1636 Monitor Electronic Control Module (Payload) (23) .

  1. Use three 9X-2045 Screws (31) and install the 210-7016 Cover (Rear) (15) and the 195-0976 Front Cover (10) .

  1. Install the 236-8117 Film (33) onto the 195-0976 Front Cover (10) just above the display.

  1. Use four 9X-2042 Screws (30) to install the 198-1941 Hinge Assembly (11) and 195-0975 Bracket (9) onto the 195-0973 Bracket (8) .

Installation of 2Q-8590 Payload Monitor Gp (Kit) on the 966G Series II Wheel Loader (S/N: ANT1-UP) and the 972G Series II Wheel Loader (S/N: ANY1-UP)

Installation of Pressure Sensor Mounting Group




Illustration 9g01331848

Top view of pressure sensor mounting group

(B) Cap assembly

  1. Use a 3J-1907 O-Ring Seal (39) and install the 8T-1779 Connector (41) into the 124-4672 Pressure Sensor Group (Payload Control System) (42) .

  1. Use the hardware that is included with the 124-4672 Pressure Sensor Group (Payload Control System) (42) and install the 124-4672 Pressure Sensor Group (Payload Control System) (42) onto the Main Control Valve.

  1. Use a 6V-8397 O-Ring Seal (40) and connect one end of the 205-7627 Hose As (43) onto the 8T-1779 Connector (41) that is installed in the 124-4672 Pressure Sensor Group (Payload Control System) (42) .

  1. Remove Cap Assembly (B). Use the O-Ring Seal and connect the other end of the 205-7627 Hose As (43) in place of the Cap Assembly (B) .

  1. Connect the lead wire connector of the 124-4672 Pressure Sensor Group (Payload Control System) (42) onto the electrohydraulic control harness (C) .

Installation of Payload Monitor




Illustration 10g01331716

Payload monitor gp

  1. Use two 9X-2040 Screws (26) and install the 195-0973 Bracket (6) on the right front cab post.

  1. Use two 9X-2040 Screws (26) and install the 241-6393 Bracket (37) on the right front cab post.

  1. Use two 9X-2040 Screws (26) and install the 241-4227 Bracket (18) on the right front cab post.

  1. Use the following hardware and install the 224-9368 Bracket As (36) onto the back of the 228-7137 Rear Cover (11) :

  1. Install the 210-7018 Latch Assembly (17) onto the 224-9368 Bracket As (36) .

  1. Use four 7Y-7256 Screws (23) and install the 297-1398 Payload Keypad Module (4) onto the 224-9364 Bracket (12) .

  1. Run the plug on the 297-1398 Payload Keypad Module (4) through the 228-7137 Rear Cover (11) .

  1. Install two 6K-8180 Grommets (21) into the 228-7137 Rear Cover (11) .

  1. Install the 228-7137 Rear Cover (11) and the 198-6588 Front Cover (10) onto the 224-9364 Bracket (12). Use three 9X-2045 Screws (28) to secure the covers.

  1. Use four 9X-2042 Screws (27) to install the 198-1941 Hinge Assembly (9) and 195-0975 Bracket (7) onto the 195-0973 Bracket (6) .

  1. Use the following hardware to install the 283-1636 Monitor Electronic Control Module (Payload Control System) (19) onto the 195-0975 Bracket (7) :

  1. Use the following hardware to install the 224-9367 Bracket (16) onto the 210-7016 Cover (Rear) (15) :

  1. Use three 9X-8917 Screws (30) and install the 199-3417 Plate (13) onto the 210-7016 Cover (Rear) (15) .

  1. Install the 205-4933 Film (14) onto the 224-9367 Bracket (16) .

  1. Install the 210-7018 Latch Assembly (17) onto the 224-9367 Bracket (16) .

  1. Connect the 188-1421 Monitor Harness As (5) to the main cab harness which is located in the overhead console.

  1. Install the 7N-5876 Lamp (3) into the lamp socket that is on the 188-1421 Monitor Harness As (5) .

  1. Insert the lamp socket that is on the 188-1421 Monitor Harness As (5) into the empty 6K-8180 Grommet (21) that is on the back of the 228-7137 Rear Cover (11) .

  1. Connect the connector with three pins that is on the 188-1421 Monitor Harness As (5) to the connector that is on the 297-1398 Payload Keypad Module (4). Secure the connector with three pins that is on the 188-1421 Monitor Harness As (5) with one 3S-2093 Cable Strap (2) .

  1. Insert the other two connectors on the 188-1421 Monitor Harness As (5) through the rear of the 210-7016 Cover (Rear) (15) .

  1. Install one 8T-9471 Grommet (25) around the 188-1421 Monitor Harness As (5) and into the hole in the rear of 210-7016 Cover (Rear) (15) .

  1. Use four 9X-8917 Screws (30) and install the connector with five pins on the 188-1421 Monitor Harness As (5) onto the 199-3417 Plate (13) .

  1. Install the 3E-5165 Protection Cap Assembly (1) onto the connector with five pins.

  1. Connect the other connector onto the 283-1636 Monitor Electronic Control Module (Payload Control System) (19) .

  1. Use three 9X-2045 Screws (28) and install the 210-7016 Cover (Rear) (15) and the 195-0976 Front Cover (8) .

  1. Install the 236-8117 Film (38) onto the 195-0976 Front Cover (8) just above the display.

Installation of 2Q-8576 Payload Monitor Gp (Kit) on the 966G Series II Wheel Loader (S/N: ANZ1-UP) and the 972G Series II Wheel Loader (S/N: AWP1-UP)

Installation of the Mounting Group for the Position Sensor




Illustration 11g01332272

Right side and front views of the mounting group for the position sensor

  1. Use the following hardware and mount the 169-0417 Position Sensor Group (Lift) (5) onto the 199-4064 Bracket (7) :

  1. Use the following hardware and install the 214-3616 Plate (8) onto the 169-0417 Position Sensor Group (Lift) (5) shaft:

  1. Use the following hardware and install the 130-5300 Clip (3) onto the 199-4064 Bracket (7) :

  1. Refer to Section B-B in Illustration 6. Assemble the following parts:

  1. Connect one of the 7X-7662 Rod Ends (1) onto the 214-3616 Plate (8) that is mounted on the 169-0417 Position Sensor Group (Lift) (5) .

  1. Use the following hardware and install the 179-7000 Arm (6) onto the Lift Arm:

  1. Use the following hardware and install the 199-4064 Bracket (7) onto the Front Frame of the Machine:

  1. Connect the other 7X-7662 Rod End (1) onto the 199-4064 Bracket (7) .

  1. Connect the plug on the power lead of the 169-0417 Position Sensor Group (Lift) (5) onto the proper plug on the front wiring harness. The plug is located near the lift position sensor.

Installation of Pressure Sensor Mounting Group




Illustration 12g01332290

Top view of pressure sensor mounting group

(B) Cap assembly

  1. Use a 3J-1907 O-Ring Seal (5) and install the 8T-1779 Connector (7) into the 124-4672 Pressure Sensor Group (Payload Control System) (1) .

  1. Use the hardware that is included with the 124-4672 Pressure Sensor Group (Payload Control System) (1) and install the 124-4672 Pressure Sensor Group (Payload Control System) (1) onto the Main Control Valve.

  1. Use a 6V-8397 O-Ring Seal (6) and connect one end of the 205-7627 Hose As (4) onto the 8T-1779 Connector (7) that is installed in the 124-4672 Pressure Sensor Group (Payload Control System) (1) .

  1. Remove Cap Assembly (B). Use the O-Ring Seal and connect the other end of the 205-7627 Hose As (4) in place of the Cap Assembly (B) .

  1. Connect one end of the 136-1877 Sensor Harness As (3) onto the 124-4672 Pressure Sensor Group (Payload Control System) (1). Use the following hardware and secure the plugs:

  1. Connect the other end of the 136-1877 Sensor Harness As (3) onto the front wiring harness (C) .

Installation of Payload Monitor




Illustration 13g01367867

Payload monitor gp

  1. Use two 9X-2040 Screws (29) and install the 195-0973 Bracket (8) on the right front cab post.

  1. Use two 9X-2040 Screws (29) and install the 241-6393 Bracket (22) on the right front cab post.

  1. Use two 9X-2040 Screws (29) and install the 241-4227 Bracket (21) on the right front cab post.

  1. Use the following hardware and install the 224-9368 Bracket As (19) onto the back of the 228-7137 Rear Cover (20) :

  1. Use four 7Y-7256 Screws (26) and install the 297-1398 Payload Keypad Module (6) onto the 224-9364 Bracket (17) .

  1. Run the plug on the 297-1398 Payload Keypad Module (6) through the 228-7137 Rear Cover (20) .

  1. Install two 6K-8180 Grommets (3) into the 228-7137 Rear Cover (20) .

  1. Install the 228-7137 Rear Cover (20) and the 198-6588 Front Cover (12) onto the 224-9364 Bracket (17). Use three 9X-2045 Screws (31) to secure the covers.

  1. Use four 9X-2042 Screws (30) to install the 198-1941 Hinge Assembly (11) and 224-9364 Bracket (17) onto the 241-6393 Bracket (22) .

  1. Install a 210-7018 Latch Assembly (16) onto the 224-9368 Bracket (19) .

  1. Use the following hardware to install the 283-1636 Monitor Electronic Control Module (Payload) (23) onto the 195-0975 Bracket (9) :

  1. Use four 9X-8917 Screws (5) and install the 199-3417 Plate (13) onto the 210-7016 Cover (Rear) (15) .

  1. Use the following hardware to install the 224-9367 Bracket (18) onto the 210-7016 Cover (Rear) (15) :

  1. Install the 205-4933 Film (14) onto the 224-9367 Bracket (18) .

  1. Install a 210-7018 Latch Assembly (16) onto the 224-9367 Bracket (18) .

  1. Connect the 188-1421 Monitor Harness As (7) to the main cab harness which is located in the overhead console.

  1. Install the 7N-5876 Lamp (4) into the lamp socket that is on the 188-1421 Monitor Harness As (7) .

  1. Insert the lamp socket that is on the 188-1421 Monitor Harness As (7) into the empty 6K-8180 Grommet (3) that is on the back of the 228-7137 Rear Cover (20) .

  1. Connect the connector with three pins that is on the 188-1421 Monitor Harness As (7) to the connector that is on the 297-1398 Payload Keypad Module (6). Secure the connector with three pins that is on the 188-1421 Monitor Harness As (7) with one 3S-2093 Cable Strap (2) .

  1. Insert the other two connectors on the 188-1421 Monitor Harness As (7) through the rear of the 210-7016 Cover (Rear) (15).

  1. Install one 8T-9471 Grommet (28) around the 188-1421 Monitor Harness As (7) and into the hole in the rear of 210-7016 Cover (Rear) (15) .

  1. Use three 9X-8917 Screws (5) and install the connector with five pins on the 188-1421 Monitor Harness As (7) onto the 199-3417 Plate (13) .

  1. Install the 3E-5165 Protection Cap Assembly (1) onto the connector with five pins.

  1. Connect the other connector onto the 283-1636 Monitor Electronic Control Module (Payload) (23) .

  1. Use three 9X-2045 Screws (31) and install the 210-7016 Cover (Rear) (15) and the 195-0976 Front Cover (10) .

  1. Install the 236-8117 Film (33) onto the 195-0976 Front Cover (10) just above the display.

  1. Use four 9X-2042 Screws (30) to install the 198-1941 Hinge Assembly (11) and 195-0975 Bracket (9) onto the 195-0973 Bracket (8) .

Installation of 2Q-8557 Payload Monitor Gp (Kit) on the 980G Series II Wheel Loader (S/N: AWH1-01356)

Removal of parts from Main Control Valve




Illustration 14g01332299

View of main control valve and mounting group

(A) O-Ring seals

(B) Dust caps

(C) Fitting as

(D) Hose as

  1. Remove the following parts from the Main Control Valve:

Installation of the Pressure Sensor Mounting




Illustration 15g01332325

View of main control valve

  1. Use the following hardware to mount the two 4E-2448 Brackets (1) :

  1. Install the two 124-4672 Pressure Sensor Groups (Payload Control System) (6) onto the two 4E-2448 Brackets (1). Use the hardware that is included with the sensor.

  1. Install a 6V-8636 Connector (11) and a 3J-1907 O-Ring Seal (9) into each 124-4672 Pressure Sensor Group (Payload Control System) (6) .

  1. Install a 8T-8902 Tee (4) and a 6V-8397 O-Ring Seal (10) into each 6V-8636 Connector (11) .

  1. Install the following parts into each 8T-8902 Tee (4) :

  1. Install the 6V-8724 Elbow (12) and a 3J-1907 O-Ring Seal (9) onto the main control valve and mounting group.

  1. Install the 8T-1905 Elbow (13) and a 3J-1907 O-Ring Seal (9) onto the main control valve and mounting group.

  1. Install a 122-2222 Adapter (5) and a 6V-8397 O-Ring Seal (10) into the 6V-8724 Elbow (12) .

  1. Install a 122-2222 Adapter (5) and a 6V-8397 O-Ring Seal (10) into the 8T-1905 Elbow (13) .

  1. Connect the straight end of the 128-2055 Hose As (7) and a 6V-8397 O-Ring Seal (10) onto the 122-2222 Adapter (5) .

  1. Connect the other end of 128-2055 Hose As (7) and a 6V-8397 O-Ring Seal (10) onto the 8T-8902 Tee (4) .

  1. Connect the straight end of the 149-0489 Hose As (8) and a 6V-8397 O-Ring Seal (10) onto the 122-2222 Adapter (5) .

  1. Connect the other end of 149-0489 Hose As (8) and a 6V-8397 O-Ring Seal (10) onto the 8T-8902 Tee (4) .

  1. Connect both end of the 145-6689 Hose As . Refer to Illustration 18. This hose replaces the 164-7440 Hose As (D) .

Installation of the Sensor Wiring Gp




Illustration 16g01332337

Front view of sensor wiring group

(A) Control harness as

(B) Pressure sensor for the rod end of the lift cylinder

(C) Pressure sensor for the head end of the lift cylinder

  1. Connect the "ROD END" plug of the 137-8463 Sensor Harness As (18) to the lead of the pressure sensor for the rod end of the lift cylinder (B) .

  1. Connect the plug that is marked "HEAD END" of the 137-8463 Sensor Harness As (18) to the lead of the pressure sensor for the head end of the lift cylinder (C) .

  1. Use six 3S-2093 Cable Straps (17) to secure the 137-8463 Sensor Harness As (18). Refer to Illustration 16 for the location of the 3S-2093 Cable Straps (17) .

  1. Connect the 240-9983 Harness As onto the 137-8463 Sensor Harness As (18) .

  1. Connect the other end of the 240-9983 Harness As onto the electrohydraulic control harness.

Installation of the Payload Monitor Gp




Illustration 17g01105564

Payload monitor gp

  1. Use two 9X-2040 Screws (29) and install the 195-0973 Bracket (8) on the right front cab post.

  1. Use two 9X-2040 Screws (29) and install the 241-6393 Bracket (22) on the right front cab post.

  1. Use two 9X-2040 Screws (29) and install the 241-4227 Bracket (21) on the right front cab post.

  1. Use four 7Y-7256 Screws (26) and install the 297-1398 Payload Keypad Module (6) onto the 224-9364 Bracket (17) .

  1. Use the following hardware to install the 224-9368 Bracket (19) onto the 228-7137 Cover (Rear) (20) :

  1. Run the plug on the 297-1398 Payload Keypad Module (6) through the 228-7137 Rear Cover (20) .

  1. Install two 6K-8180 Grommets (3) into the 228-7137 Rear Cover (20) .

  1. Install the 228-7137 Rear Cover (20) and the 198-6588 Front Cover (12) onto the 224-9364 Bracket (17). Use three 9X-2045 Screws (31) to secure the covers.

  1. Use four 9X-2042 Screws (30) to install the 198-1941 Hinge Assembly (11) and 224-9364 Bracket (17) onto the 241-6393 Bracket (22) .

  1. Install a 210-7018 Latch Assembly (16) onto the 224-9368 Bracket (19) .

  1. Use the following hardware to install the 283-1636 Monitor Electronic Control Module (Payload) (23) onto the 195-0975 Bracket (9) :

  1. Use four 9X-8917 Screws (5) and install the 199-3417 Plate (13) onto the 210-7016 Cover (Rear) (15) .

  1. Use the following hardware to install the 224-9367 Bracket (18) onto the 210-7016 Cover (Rear) (15) :

  1. Install the 205-4933 Film (14) onto the 224-9367 Bracket (18) .

  1. Install a 210-7018 Latch Assembly (16) onto the 224-9367 Bracket (18) .

  1. Connect the 188-1421 Monitor Harness As (7) to the main cab harness which is located in the overhead console.

  1. Install the 7N-5876 Lamp (4) into the lamp socket that is on the 188-1421 Monitor Harness As (7) .

  1. Insert the lamp socket that is on the 188-1421 Monitor Harness As (7) into the empty 6K-8180 Grommet (3) that is on the back of the 228-7137 Rear Cover (20) .

  1. Connect the connector with three pins that is on the 188-1421 Monitor Harness As (7) to the connector that is on the 297-1398 Payload Keypad Module (6). Secure the connector with three pins that is on the 188-1421 Monitor Harness As (7) with one 3S-2093 Cable Strap (2) .

  1. Insert the other two connectors on the 188-1421 Monitor Harness As (7) through the rear of the 210-7016 Cover (Rear) (15).

  1. Install one 8T-9471 Grommet (28) around the 188-1421 Monitor Harness As (7) and into the hole in the rear of 210-7016 Cover (Rear) (15) .

  1. Use three 9X-8917 Screws (5) and install the connector with five pins on the 188-1421 Monitor Harness As (7) onto the 199-3417 Plate (13) .

  1. Install the 3E-5165 Protection Cap Assembly (1) onto the connector with five pins.

  1. Connect the other connector onto the 283-1636 Monitor Electronic Control Module (Payload) (23) .

  1. Use three 9X-2045 Screws (31) and install the 210-7016 Cover (Rear) (15) and the 195-0976 Front Cover (10) .

  1. Install the 236-8117 Film (33) onto the 195-0976 Front Cover (10) just above the display.

  1. Use four 9X-2042 Screws (30) to install the 198-1941 Hinge Assembly (11) and 195-0975 Bracket (9) onto the 195-0973 Bracket (8) .

Installation of 2Q-8557 Payload Monitor Gp (Kit) on the 980G Series II Wheel Loader (S/N: AWH01357-UP)

Installation of the Pressure Sensor Mounting




Illustration 18g01332347

Rear view of main control valve

(A) Pressure sensor for the autodig feature

(B) Plug and seal

  1. If equipped, remove the sensor for the aggregate autodig system (A) .

  1. Remove the plug and seal (B) from the Main Control Valve. Remove the other plug and seal (B) if the machine is not equipped with the autodig system.



    Illustration 19g01173623

    Rear view of main control valve

  1. Use the following hardware to mount the two 265-2834 Blocks (6) :

  1. Use a 3J-1907 O-Ring Seal (10) and install a 221-3416 Pressure Sensor Gp (Lift Cylinder Head End Oil) (5) into the 265-2834 Bracket (6) .

  1. Use a 3J-1907 O-Ring Seal (10) and install a 221-3416 Pressure Sensor Gp (Lift Cylinder Rod End Oil) (5A) into the 265-2834 Bracket (6) .

  1. Install a 168-1968 Tee (4) into each 265-2834 Block (6) .

  1. Install the following parts into each 168-1968 Tee (4) :

  1. Install the 150-3036 Elbow As (8) onto the main control valve and mounting group.

  1. Install the 148-8378 Elbow As (7) onto the main control valve and mounting group.

  1. Install a 164-6871 Adapter (3) into the 150-3036 Elbow (8) .

  1. Install a 164-6871 Adapter (3) into the 148-8378 Elbow As (7) .

  1. Connect one end of a 3T-6856 Hose As (1) onto the 164-6871 Adapter (3) that is located on the "ROD END" side.

  1. Connect the other end of the 3T-6856 Hose As (1) onto the 168-1968 Tee As (3) that is located on the "ROD END" side.

  1. Connect one end of a 3T-6856 Hose As (1) onto the 164-6871 Adapter (3) that is located on the "HEAD END" side.

  1. Connect the other end of the 3T-6856 Hose As (1) onto the 168-1968 Tee As (3) that is located on the "HEAD END" side.

Installation of the Sensor Wiring Group




Illustration 20g01332353

Rear view of sensor wiring group

(A) Control harness as

  1. Connect the plug that is marked "ROD END" that is on the 263-4169 Monitor Harness As (3) to the lead of the pressure sensor for the rod end of the lift cylinder .

  1. Connect the plug that is marked "HEAD END" on the 263-4169 Monitor Harness As (3) to the lead of the pressure sensor for the head end of the lift cylinder .

  1. Connect the 263-4169 Sensor Harness As (3) onto the electrohydraulic control harness (A) .

  1. Use the following hardware and secure the 137-8463 Sensor Harness As (3) :

Installation of the Payload Monitor Gp




Illustration 21g01105564

Payload monitor gp

  1. Use two 9X-2040 Screws (29) and install the 195-0973 Bracket (8) on the right front cab post.

  1. Use two 9X-2040 Screws (29) and install the 241-6393 Bracket (22) on the right front cab post.

  1. Use two 9X-2040 Screws (29) and install the 241-4227 Bracket (21) on the right front cab post.

  1. Use four 7Y-7256 Screws (26) and install the 297-1398 Payload Keypad Module (6) onto the 224-9364 Bracket (17) .

  1. Use the following hardware to install the 224-9368 Bracket (19) onto the 228-7137 Cover (Rear) (20) :

  1. Run the plug on the 297-1398 Payload Keypad Module (6) through the 228-7137 Rear Cover (20) .

  1. Install two 6K-8180 Grommets (3) into the 228-7137 Rear Cover (20) .

  1. Install the 228-7137 Rear Cover (20) and the 198-6588 Front Cover (12) onto the 224-9364 Bracket (17). Use three 9X-2045 Screws (31) to secure the covers.

  1. Use four 9X-2042 Screws (30) to install the 198-1941 Hinge Assembly (11) and 224-9364 Bracket (17) onto the 241-6393 Bracket (22) .

  1. Install a 210-7018 Latch Assembly (16) onto the 224-9368 Bracket (19) .

  1. Use the following hardware to install the 283-1636 Monitor Electronic Control Module (Payload) (23) onto the 195-0975 Bracket (9) :

  1. Use four 9X-8917 Screws (5) and install the 199-3417 Plate (13) onto the 210-7016 Cover (Rear) (15) .

  1. Use the following hardware to install the 224-9367 Bracket (18) onto the 210-7016 Cover (Rear) (15) :

  1. Install the 205-4933 Film (14) onto the 224-9367 Bracket (18) .

  1. Install a 210-7018 Latch Assembly (16) onto the 224-9367 Bracket (18) .

  1. Connect the 188-1421 Monitor Harness As (7) to the main cab harness which is located in the overhead console.

  1. Install the 7N-5876 Lamp (4) into the lamp socket that is on the 188-1421 Monitor Harness As (7) .

  1. Insert the lamp socket that is on the 188-1421 Monitor Harness As (7) into the empty 6K-8180 Grommet (3) that is on the back of the 228-7137 Rear Cover (20) .

  1. Connect the connector with three pins that is on the 188-1421 Monitor Harness As (7) to the connector that is on the 297-1398 Payload Keypad Module (6). Secure the connector with three pins that is on the 188-1421 Monitor Harness As (7) with one 3S-2093 Cable Strap (2) .

  1. Insert the other two connectors on the 188-1421 Monitor Harness As (7) through the rear of the 210-7016 Cover (Rear) (15).

  1. Install one 8T-9471 Grommet (28) around the 188-1421 Monitor Harness As (7) and into the hole in the rear of 210-7016 Cover (Rear) (15) .

  1. Use three 9X-8917 Screws (5) and install the connector with five pins on the 188-1421 Monitor Harness As (7) onto the 199-3417 Plate (13) .

  1. Install the 3E-5165 Protection Cap Assembly (1) onto the connector with five pins.

  1. Connect the other connector onto the 283-1636 Monitor Electronic Control Module (Payload) (23) .

  1. Use three 9X-2045 Screws (31) and install the 210-7016 Cover (Rear) (15) and the 195-0976 Front Cover (10) .

  1. Install the 236-8117 Film (33) onto the 195-0976 Front Cover (10) just above the display.

  1. Use four 9X-2042 Screws (30) to install the 198-1941 Hinge Assembly (11) and 195-0975 Bracket (9) onto the 195-0973 Bracket (8) .

Caterpillar Information System:

3054E and 3056E Industrial Engines and Engines for Caterpillar Built Machines Engine Pressure Sensor Open or Short Circuit - Test
D6K Track-Type Tractor Machine Systems Piston Pump (Winch) - Assemble
D6K Track-Type Tractor Machine Systems Piston Pump (Winch) - Disassemble
814F Series 2 Wheel Dozer, 815F Series 2 Soil Compactor and 816F Series 2 Landfill Compactor Braking System Brake and Planetary
D6K Track-Type Tractor Machine Systems Gear Pump (Fan Drive) - Remove
D6K Track-Type Tractor Machine Systems Piston Pump (Winch)
3054E and 3056E Industrial Engines and Engines for Caterpillar Built Machines Electrical Power Supply Circuit - Test
D6T Track-Type Tractor Systems Relief Valve (Main) - Standard
2006/11/27 New Exhaust Temperature Sensors Are Now Available {1919}
3054E and 3056E Industrial Engines and Engines for Caterpillar Built Machines Electrical Connectors - Inspect
814F Series 2 Wheel Dozer, 815F Series 2 Soil Compactor and 816F Series 2 Landfill Compactor Braking System Parking Brake
3054E and 3056E Industrial Engines and Engines for Caterpillar Built Machines Digital Throttle Position Sensor Circuit - Test
3054E and 3056E Industrial Engines and Engines for Caterpillar Built Machines Engine Temperature Sensor Open or Short Circuit - Test
D6K Track-Type Tractor Electrohydraulic Power Train Crossover Relief Valve - Adjust
D6K Track-Type Tractor Electrohydraulic Power Train Charge Relief Valve - Adjust
906H, 907H and 908H Compact Wheel Loaders Stopping the Engine if an Electrical Malfunction Occurs
657G Wheel Tractor-Scraper Auger Hydraulic System Pump Rotating Group
814F Series 2 Wheel Dozer, 815F Series 2 Soil Compactor and 816F Series 2 Landfill Compactor Engine Crankcase Breather - Clean
C4.4 and C6.6 Engines for Caterpillar Built Machines Injector Trim File
2006/12/11 Correction to the Parts Manual {1718, 1906, 1912, 1917, 1923, 1924, 1928}
2007/05/21 Correction to Disassembly and Assembly , "Hydraulic Tank - Disassemble" {5056}
3054E and 3056E Industrial Engines and Engines for Caterpillar Built Machines Indicator Lamp Circuit - Test
3054E and 3056E Industrial Engines and Engines for Caterpillar Built Machines Mode Selection Circuit - Test
3054E and 3056E Industrial Engines and Engines for Caterpillar Built Machines Set Speed Circuit - Test
Back to top
The names Caterpillar, John Deere, JD, JCB, Hyundai or any other original equipment manufacturers are registered trademarks of the respective original equipment manufacturers. All names, descriptions, numbers and symbols are used for reference purposes only.
CH-Part.com is in no way associated with any of the manufacturers we have listed. All manufacturer's names and descriptions are for reference only.