Complete the following steps in order:

  1. Position the machine on level ground and stop the engine.

  1. Release the pressure in the hydraulic system. Refer to Testing And Adjusting, "Hydraulic System Pressure - Release".



    Illustration 1g00983987

    (1) Auxiliary pump

    (2) Pressure tap

  1. Connect a 40000 kPa (5800 psi) pressure gauge to pressure tap (2) .

  1. Start the engine.

  1. Place the machine controls at the following settings: engine speed dial "10" and AEC switch OFF. Refer to Testing and Adjusting, "Engine Performance Test (Engine Speed)" for engine rpm settings.

  1. Increase the hydraulic oil temperature to 55° ± 5°C (131° ± 9°F).

  1. Set the pilot pressure to the specifications in Testing and Adjusting (Engine and Pump Control), "Relief Valve (Pilot) Test and Adjust".

  1. Loosen locknut (6). Turn the adjustment screw (3) for the main relief valve for the Auxiliary Control Valve (Medium Pressure) clockwise for one half turn. This will ensure that the main relief valve for the Auxiliary Control Valve (Medium Pressure) is set above the line relief valve for the Auxiliary Control Valve (Medium Pressure).

  1. Move the left joystick slide control Forward or Backward. Check the auxiliary pump discharge pressure on the pressure gauge.

  1. Return the left joystick slide control to NEUTRAL position.

  1. The pressure setting for the line relief valves must be within the specifications for the Auxiliary Control Valve (Medium Pressure). If the pressure setting of line relief valves are not within the specifications, loosen the locknut (4) and adjust the line relief valves to a pressure setting of 22100 kPa (3205 psi) to 23100 kPa (3350 psi).

    Note: Turn the adjustment screw clockwise in order to increase the pressure. Turn the adjustment screw counterclockwise in order to decrease the pressure.

    Note: Always make final pressure adjustments on pressure rise.

  1. Return the main relief valve for the Auxiliary Control Valve (Medium Pressure) to the specified pressure setting. Tighten locknut (6) to a torque of 50 ± 10 N·m (37 ± 7 lb ft).



    Illustration 2g00832133

    (3) Main relief valve adjustment screw

    (4) Locknut

    (5) Relief valve adjustment screw

  1. Tighten locknut (4) to a torque of 50 ± 10 N·m (37 ± 7 lb ft).

Caterpillar Information System:

SW45, SW60, SW80, SW345B, SW360B, SW380B, SW460B and SW480B Wheel Saws Frame Slide Bars - Lubricate
312C and 315C Excavators Tool Control System System G 1c: Relief Valve (Line) - Test and Adjust - One-Way System
312C and 315C Excavators Tool Control System System G 1b: Relief Valve (Line) - Test and Adjust
312C and 315C Excavators Tool Control System System G 1a: Relief Valve (Line) - Test and Adjust
325C Excavator 3126B Engine Supplement Engine Oil Cooler - Remove and Install
314C ExcavatorEngine Supplement Oil Pan - Remove and Install
320C Excavator Machine System Specifications Solenoid Valve (Quick Coupler)
H45/H45 S, H50/H50 S, 63/H63/H63 S, 70/70 S/H70/H70 S, H90C/H90C S and 100/H100/H100 S Hydraulic Hammers Hydraulic Accumulator (High Pressure) - Assemble
C-10, C-12, C-15 and C-16 Industrial Engines CID 0247 FMI 09 J1939 Data Link communications
H45/H45 S, H50/H50 S, 63/H63/H63 S, 70/70 S/H70/H70 S, H90C/H90C S and 100/H100/H100 S Hydraulic Hammers Hydraulic Accumulator (Low Pressure) - Assemble
C4.4 Industrial Engine Piston Ring Groove - Inspect
C4.4 Industrial Engine Cooling System - Inspect
2003/04/01 New Flash File Software Is Used for Product Link 151/201 {7620}
BP24 Pickup Broom Broom Brush
BP24 Pickup Broom Broom Hitch
BP24 Pickup Broom Debris Frame
312C and 315C Excavators Tool Control System System G14: Relief Valve (Line) - Test and Adjust - Auxiliary Control Valve
312C and 315C Excavators Tool Control System System G14: Relief Valve (Main) - Test and Adjust - Auxiliary Control Valve (Medium Pressure)
PC205, PC206, PC210, PC306B, PC310B, PC408B and PC412B Work Tools Piston Motor - Install
PC205, PC206, PC210, PC306B, PC310B, PC408B and PC412B Work Tools Piston Motor - Remove
Procedure for Replacement of Air Conditioner Components{7320} Procedure for Replacement of Air Conditioner Components{7320}
5130B Excavator Hydraulic System Control Manifold
3412 Generator Set Engines Disconnect Switch
2003/04/14 Use 216-3914 Track Repair Group to Assemble and Disassemble the Track Assemblies {4170}
Back to top
The names Caterpillar, John Deere, JD, JCB, Hyundai or any other original equipment manufacturers are registered trademarks of the respective original equipment manufacturers. All names, descriptions, numbers and symbols are used for reference purposes only.
CH-Part.com is in no way associated with any of the manufacturers we have listed. All manufacturer's names and descriptions are for reference only.