Governor Control Linkage and Decelerator - Assemble
Assembly Procedure
Show/hide table
Required Tools     | |||
---|---|---|---|
Tool     | Part Number     | Description     | Qty     |
A     | 1P-0510     | Driver Group     | 1     |
Show/hide table
Illustration 1 | g00632031 |
Show/hide table
NOTICE |
---|
To prevent damage to the bearings, install the bearings by driving only on the stamped end of the bearing. |
- If bearings (30) were removed, use Tool (A) to install the bearings in support (29). Install the bearings 5 mm (0.20 inch) below the surface of the support.
- If seals (31) were removed, use Tool (A) to install the seals on each side of the bearings. Install the seals so that the lip of the seals faces away from bearings (30) .
- Fill the bearings and the area between the seals with 5P-0960 Molybdenum Grease .
- Put shaft (25) in position in the first bearing. Install key (26) in the shaft.
Show/hide table
Illustration 2 | g00631804 |
- Put lever (27) in position. Push shaft (25) through the lever and into the support.
- Tighten bolt (28) that holds the lever in position on the shaft.
- Align the mark on the end of the shaft with the centerline of the slot in pedal (24). Install the pedal on the shaft until the space between the pedal and the support is 2 ± 1 mm (.08 ± .04 inch).
Show/hide table
Illustration 3 | g00631803 |
- Tighten bolt (23) .
- Put a washer in position on each side of the support and install shaft (22) .
Show/hide table
Illustration 4 | g00631801 |
- Install pedal (15) on the shaft. Tighten bolt (21) that holds the pedal in place.
- Put shaft assembly (20) in position in the support. Install key (32) in the shaft.
Show/hide table
Illustration 5 | g00632033 |
- Put lever (18) and the bar in position on the shaft assembly and install bolt (19). DO NOT tighten the bolt at this time.
- Put bar (16) in position on pedal (15). Install pin (17) and the cotter pin that holds the bar in place.
Show/hide table
Illustration 6 | g00632034 |
- Tighten bolt (19) .
- Install the key in shaft assembly (20). Put lever (13) in position on the shaft assembly and tighten bolt (14). Tighten bolt (19) .
Show/hide table
Illustration 7 | g00632036 |
- Put spring (11) and shaft assembly (12) in position in cover assembly (4) .
Show/hide table
Illustration 8 | g00631795 |
Note: Spring (11) must be installed with the concave side of the spring toward shaft assembly (12) .
- Install spring (9) in the slot in shaft assembly (12) .
Show/hide table
Illustration 9 | g00632038 |
Note: Put clean SAE 10W oil on all parts of the detent assembly before assembly.
- Align the slot in plate assembly (10) with spring (9) and install the plate assembly.
- Put springs (7) in position in plate assembly (10) with spring 9 and install the plate assembly.
Show/hide table
Illustration 10 | g00632039 |
- Put a gasket on each side of plate (3). Put the plate in position on the support.
Show/hide table
Illustration 11 | g00631792 |
- Align the plate assembly in cover assembly (4) with the shaft assembly in the support and install the cover assembly.
- Install bolts (6) that hold the cover assembly in place.
- Install the washers and housing (5) in cover assembly (4) .
- Install the key in shaft assembly (12). Put lever (1) in position on the shaft and tighten bolt (2) .
Show/hide table
Illustration 12 | g00632041 |
End By: Install the governor control linkage and decelerator.
Caterpillar Information System:
824G Wheel Dozer, 825G Soil Compactor and 826G Landfill Compactor Hydraulic System Piston Motor (Fan Drive)
793C Off-Highway Truck/Tractor Power Train Lockup Clutch and Synchronizing Valve - Assemble
527 Track-Type Skidder Machine Supplements Governor Control Linkage and Decelerator - Disassemble
527 Track-Type Skidder Machine Supplements Governor Control Linkage and Decelerator - Install
527 Track-Type Skidder Machine Supplements Governor Control Linkage and Decelerator - Remove
Challenger 35, Challenger 45 and Challenger 55 Agricultural Tractors Implement, Steering and Brake Hydraulic Systems Three-Point Hitch Control Valve
527 Track-Type Skidder Machine Supplements Bulldozer Control Valve - Assemble
D250E Series II and D300E Series II Articulated Trucks Power Train Transmission and Transfer Gears - Remove
527 Track-Type Skidder Machine Supplements Bulldozer Control Valve - Disassemble
527 Track-Type Skidder Machine Supplements Bulldozer Control Valve - Install
527 Track-Type Skidder Machine Supplements Bulldozer Control Valve - Remove
527 Track-Type Skidder Machine Supplements Implement Pump - Assemble
527 Track-Type Skidder Machine Supplements Governor Control Linkage - Adjust
216, 226, 228, 232, 236, 242, 246, 248, 252 and 262 Skid Steer Loaders Wheel Nuts - Tighten
527 Track-Type Skidder Machine Supplements Refrigerant Compressor - Remove and Install
527 Track-Type Skidder Machine Supplements Refrigerant Condenser - Remove and Install
527 Track-Type Skidder Machine Supplements Refrigerant Condenser Fans and Motor - Remove and Install
527 Track-Type Skidder Machine Supplements Refrigerant Evaporator Coil and Heater Core - Remove
527 Track-Type Skidder Machine Supplements Refrigerant Evaporator Coil and Heater Core - Install
527 Track-Type Skidder Machine Supplements Receiver-Dryer - Remove and Install
527 Track-Type Skidder Machine Supplements Sweeps - Remove and Install
527 Track-Type Skidder Machine Supplements Rollover Protective Structure (ROPS, Open Cab) - Remove and Install
527 Track-Type Skidder Machine Supplements Rollover Protective Structure (ROPS, Enclosed Cab) - Remove and Install
527 Track-Type Skidder Machine Supplements Cab - Remove