3208 DIESEL TRUCK ENGINE Caterpillar


Fuel Injection Pump

Usage:

Firing order (injection sequence) ... 1,2,7,3,4,5,6,8

Injection timing BTC (before top center):

Engines with 1W6742 Fuel Pump Group ... 8 ± 1°

Engines with 7C8966 and 7W5479 Fuel Pump Groups ... 10 ± 1°

Engines with 7E9890 Fuel Pump Groups ... 11.5 ± 1°

Engines with 7C8968, 7C8969, 7C8970, 7C8971 and 4P4260 Fuel Pump Groups ... 12.5 ± 1°

All other engines ... 15 ± 1°

Torque for the nuts that hold the fuel lines (Use 5P0144 Fuel Line Socket) ... 40 ± 7 N·m (30 ± 5 lb ft)

(1) Bore in the rear bearing for the camshaft (new) ... 60.325 ± 0.013 mm (2.3750 ± .0005 in)

Diameter of rear bearing surface (journal) of the camshaft (new) ... 60.249 ± 0.013 mm (2.3720 ± .0005 in)

Maximum permissible clearance between the bearing and the camshaft bearing surface (journal) (worn) ... 0.15 mm (.006 in)

(2) Torque for screws that hold sleeve control levers ... 2.8 ± 0.2 N·m (24 ± 2 lb in)

(3) Bore in the housing for the fuel control shaft (new) ... 8.999 ± 0.013 mm (.3543 ± .0005 in)

Diameter of sleeve control shaft (new) ... 8.966 ± 0.008 mm (.3530 ± .0003 in)

Maximum permissible clearance between the bore in the housing and the sleeve control shaft (worn) ... 0.08 mm (.003 in)

(4) End play for camshaft with sleeve installed (new) ... 0.58 ± 0.46 mm (.023 ± .018 in)

NOTE: When installing sleeve on end of camshaft, support the camshaft to prevent damage to parts inside of injection pump and governor housing.

(5) Bore in the front bearing for the camshaft (new) ... 25.413 ± 0.013 mm (1.0005 ± .0005 in)

Diameter of front bearing surface (journal) of the camshaft (new) ... 25.375 ± 0.013 mm (.9990 ± .0005 in)

Maximum permissible clearance between the bearing and the camshaft bearing surface (journal) (worn) ... 0.10 mm (.004 in)

(6) Torque for bushing ... 82 ± 7 N·m (60 ± 5 lb ft)

(7) Crossover levers.

NOTE: For adjustment of crossover levers, see the Testing And Adjusting Section.

(8) Torque for screws that hold crossover levers ... 2.8 ± 0.2 N·m (24 ± 2 lb in)

(9 and 10) Fuel control shafts.

(11) Dowel pin (linkage between crossover levers).

(12) Distance guide pin extends into bore ... 1.20 ± 0.10 mm (.047 ± .004 in)

NOTE: Install guide pin with slot toward the top of the lifter bore.

(13) 9N5862 Spring for injection pump:

Length under test force ... 35.13 mm (1.383 in)

Test force ... 56.7 ± 6.6 N (12.4 ± 1.4 lb)

Free length after test ... 40.80 mm (1.606 in)

Outside diameter ... 18.49 mm (.728 in)

A. Reverse Flow Check Valve (RFC).
B. Orificed Delivery Valve (ODV).
C. Orificed Delivery Valve-Lo Volume (ODV).
D. Orificed Reverse Flow Check Valve (ORFC).
Back to top
The names Caterpillar, John Deere, JD, JCB, Hyundai or any other original equipment manufacturers are registered trademarks of the respective original equipment manufacturers. All names, descriptions, numbers and symbols are used for reference purposes only.
CH-Part.com is in no way associated with any of the manufacturers we have listed. All manufacturer's names and descriptions are for reference only.