Introduction

Table 1
Revision  Summary of Changes in REHS3480 
01  Added new Knuckleboom Loader serial number prefixes KBL, KBF, KBA, KBR, KL5, KL7, KP5, and KP7 to document. 
Added Blank Specifications Table to document.
00  New Document. 

© 2017 Caterpillar All Rights Reserved. This guideline is for the use of Cat dealers only. Unauthorized use of this document or the proprietary processes therein without permission may be violation of intellectual property law. Information contained in this document is considered Caterpillar: Confidential Yellow.

This Special Instruction includes test procedures for piston pumps. This Special Instruction also provides specifications. The technician should have a good understanding of hydraulic piston pumps. The technician should be educated in the operation of the hydraulic test bench. The test benches in this document are available through the Caterpillar Service Tool Division. Gather all necessary tooling before you need to hook up the pump. Some of the required tooling appears in a table at the end of this document. There are many possible variations of tooling that could be used. Not every possible variation can be listed.

For technical questions when using this document, work with your Dealer Technical Communicator (TC).

To report suspected errors, inaccuracies, or suggestions regarding the document, submit a form for feedback in the Service Information System (SIS Web) interface.

Canceled Part Numbers and Replaced Part Numbers

This document may not include all Canceled part numbers and replaced part numbers. Use NPR on SIS for information about Canceled part numbers and replaced part numbers. NPR will provide the current part numbers for replaced parts.

Safety



Illustration 1g02139237

------ WARNING! ------

Personal injury or death can result from improperly checking for a leak.

Always use a board or cardboard when checking for a leak. Escaping air or fluid under pressure, even a pin-hole size leak, can penetrate body tissue causing serious injury, and possible death.

If fluid is injected into your skin, it must be treated immediately by a doctor familiar with this type of injury.


------ WARNING! ------

Hot oil and hot components can cause personal injury. Do not allow hot oil or hot components to contact skin.


------ WARNING! ------

Pump test pressures in this guideline may exceed the normal operating range of the hydraulic test hoses utilized when connecting the tested pump to the test bench. However, the order of magnitude of these pressures is significantly below the burst strength of the Caterpillar "XT6" product.

High pressure oil can escape through improperly assembled hoses and fittings. High pressure oil can also escape through poorly maintained hoses and fittings. High pressure oil may also leak through hose that has become damaged over the life of the hose due to the pressure levels that occur during test bench operation.

Personal injury or death can result from improper hose & fitting inspection or improper hose replacement procedures. Escaping fluid under pressure can penetrate body tissue causing serious injury, and possible death.

Thoroughly inspect all testing hoses, fittings, and quick disconnects prior to any testing operation. Check the assembly date tag or hose assembly log date for a hose life indicator. Replace all Test Bench hoses at a minimum of every 2 years or earlier if the hose or fittings appear to be damaged.


Summary

This procedure is specific to the type of pump and the type of control. Refer to the test specifications and the tooling at the end of this document.

Note: A paper copy of this document may not be the latest version. Go to the Service Information System (SIS) to view the latest version.

References

Table 2
References 
Media Number  Title 
REHS1761  "Required Tooling for Bench Testing Hydraulic Components" 
SEBF8810  "Hydraulic Pump, Motor, and Cylinder Bench Test Procedure Reference Manual" 
SEHS8892  "Operating Instructions for Caterpillar 1U-9400 Series Hydraulic Test Center" 
NEHS0563  "Tool Operating Manual for 9U-5000 Series Hydraulic Test Bench" 

Connections for the Caterpillar Hydraulic Test Center



Illustration 2g01063311
Connections for the Test Center
(1) Flow control for discharge
(2) "F3" flow meter inlet
(3) "F4" flow meter inlet
(4) Oil supply from the auxiliary pump
(5) "F3" inlet for the flow meter with flow limiter
(6) "F3"outlet for the flow meter with pressure control
(7) Load sensing pressure
(8) Signal pressure
(9) "F4" outlet for the flow meter
(10) Return to tank
(11) Connections for case drain
(12) Oil supply


Illustration 3g01063312
Control and Gauges for the Test Center
(13) Meter for speed and torque
(14) Gauge for signal pressure
(15) Control for signal pressure
(16) Pressure gauge for auxiliary pump
(17) Auxiliary pump flow
(18) "F3" discharge pressure gauge
(19) "F3" discharge flow
(20) "F4" discharge pressure gauge
(21) "F4" discharge flow
(22) Auxiliary pump flow control
(23) "F3" margin pressure
(24) "F3" Load control for discharge pressure
(25) "F4" Load control for discharge pressure

Connections for the Caterpillar Hydraulic Test Bench



Illustration 4g01063314
Connections for the Test Bench
(26) "Flow meter 1" loop and "Flow meter 2" loop
(27) Oil Supply


Illustration 5g01093468
Connections for the Test Bench
(28) "Flow meter 2" loop
(29) "Flow meter 1" loop
(30) "Flow meter 2" outlet
(31) Signal pressure line
(32) "Flow meter 2" inlet
(33a) "Flow meter 1" outlet
(33b) Auxiliary oil supply outlet
(34) Auxiliary oil supply inlet
(35) "Flow meter 1" inlet


Illustration 6g01063316
Control and Gauges for the Test Bench
(36) Auxiliary oil supply pressure
(37) Signal pressure
(38) Control for signal pressure
(39) "Flow meter 1" discharge pressure
(40) Control for auxiliary oil supply pressure
(41) "Flow meter 2" discharge pressure
(42) Auxiliary oil supply control
(43) "Flow meter 2" discharge flow
(44) Discharge flow for auxiliary pump
(45) "Flow meter 1" discharge flow
(46) "Flow meter 1" load control
(47) Speed and direction control
(48) "Flow meter 2" load control

Port Locations



Illustration 7g03888777
Typical port locations and adjustments for tandem pumps
(49) Ports for the negative flow control pressure
(50) Adjustment screws for negative flow control
(51) Adjustment screws for torque control
(52) Discharge Ports
(53) Gauge port for power shift pressure
(54) Port for power shift pressure
(55) Gauge ports for discharge pressure
(57) Case drain ports
(58) Suction port
(59) Pilot pump discharge port
(60) Electrical connector for solenoid
(69) Adjustment screws for minimum displacement
(70) Adjustment screws for high-pressure cut
(71) Adjustment screws for maximum displacement
(72) Gauge port for pilot pump pressure
(73) Suction port for pilot pump


Illustration 8g03328060
Hydraulic Schematic
(49) Ports for the negative flow control pressure
(50) Adjustment screws for negative flow control
(51) Adjustment screws for torque control
(52) Discharge Ports
(53) Gauge port for power shift pressure
(54) Port for power shift pressure
(55) Gauge ports for discharge pressure
(57) Case drain ports
(58) Suction port
(59) Pilot pump discharge port
(70) Adjustment screws for high-pressure cut
(72) Gauge port for pilot pump pressure
(73) Suction port for pilot pump

1U-6392 Pressure Reducing Valve



Illustration 9g01419112
1U-6392 Pressure Reducing Valve


Illustration 10g01419113
1U-6392 Pressure Reducing Valve


Illustration 11g01419118
1U-6392 Pressure Reducing Valve Schematic
(61) Adjustment screw for the outlet pressure
(62) Drain port
(63) Gauge port for the inlet pressure
(64) Port for the outlet pressure
(65) Gauge port for the outlet pressure
(66) Port for the inlet pressure

Pump Setup

Note: A power supply is required to operate the solenoid. The power supply should be capable of delivering 0 mA to 1.5 A with an infinite setting in that range.

  1. Install quick disconnect fittings in the following ports.

    • (49) Both ports for the negative flow control

    • (53) Gauge ports for power shift pressure

    • (54) Port for power shift pressure

    • (55) or (56) Gauge ports for discharge pressure

  2. Connect the suction port (58) to the test bench oil supply. Purge all air from the suction line. Loosen the suction hose at the pump until oil leaks from the connection. Tighten the suction hose.

  3. Connect both discharge ports (52) to the flow meter inlets on the test bench. Direct flow meter outlets to sump.

  4. Connect the pilot pump discharge port (59) to a tee fitting with 8T-0856 Pressure Gauge attached. Connect the other end of the tee fitting to 9U-5841 Needle Valve. Connect 8T-0454 In-line Flow Meter inlet to the Needle Valve. Direct the flow meter output back to sump.

  5. Refer to Illustration 11 to set up Step 5. Connect 1U-6392 Pressure Reducing Valve port for inlet pressure (66) to gauge port for discharge pressure (55). Connect port for outlet pressure (64) to the port for power shift pressure (54). Vent drain port (62) to atmosphere. Connect a 8T-0856 Pressure Gauge to gauge port for outlet pressure (65). Connect a 8T-0860 Pressure Gauge to gauge port for inlet pressure (63). Connect a 8T-0855 Pressure Gauge to the power shift gauge port (53).

  6. Vent both negative flow control ports (49) to atmosphere. Connect a power supply to the electrical connector for solenoid (60).

  7. Fill the pump case with oil. Pour oil directly into case drain port (57) until the case is full. Direct a line from case drain port (57) to the test bench reservoir.

  8. Do not rotate the pump in the wrong direction. The correct direction of rotation will be stated on the pump. The correct direction of rotation will also be in the test specifications. The direction of rotation is viewed from the input shaft end. Visually check the pump for proper rotation.

Test Procedure

Note: The steps in the procedure correlate with the steps under the test specifications according to your specific part number.

The contamination level of the hydraulic oil in the test bench should be ISO 16/13 or better. The oil in the test bench should be one of the following.

  • SAE 10W at 50 °C (122 °F) or

  • Mobil DTE-11 at 46 °C (115 °F)


Illustration 12g01206428
Torque control characteristics
(Q) Discharge flow
(P) Discharge pressure

  1. Start rotating the pump according to Step 1 of the Test Specifications. Listen for abnormal noise. Verify that all connections are tight. Check for leaks around shaft seals. Check for leaks around the control valve. Verify flow from the pump.

    Run the pump for at least 5 minutes to raise the temperature of the oil and purge the system of air.



    Illustration 13g01419149
    Hydraulic schematic for maximum displacement and torque control characteristics setup
    (49) Ports for negative flow control pressure
    (53) Gauge port for power shift pressure
    (54) Port for powershift pressure
    (55) Gauge port for discharge pressure
    (61) Adjustment screw for the outlet pressure
    (62) Outlet port to tank
    (63) Gauge port for the inlet pressure
    (64) Port for the outlet pressure
    (65) Gauge port for the outlet pressure
    (66) Port for the inlet pressure

  2. Step 2 will verify maximum displacement and torque control characteristics. Both pumps will be tested at the same time. Compare the flow rates at each step to the values in Steps 2.a through 2.d in the Test Specifications. Refer to Illustration 12 for the constant horsepower curve. Step 2.b will also verify the discharge flow of the pilot pump.

    1. Slowly increase the input RPM. If the actual discharge flow is less than Step 2.a of the Test Specifications, the pump may not be mechanically feasible.

    2. Slowly increase the discharge pressure for both main pumps to the value in Step 2.b of the Test Specifications. Cycle the discharge pressure to verify the destroke point. Adjust the adjustment screw for the 1U-6392 Pressure Reducing Valve until the outlet pressure (65) is equal to the power shift pressure value in Step 2.b through 2.d of the Test Specifications. Slowly increase the signal current from power supply until the pressure at the power shift gauge port (53) is adjusted according to Steps 2.b through 2.d of the Test Specifications. The discharge flow should drop as the discharge pressure increases. The pumps should now be under constant horsepower control.

      Slowly increase the discharge pressure for the pilot pump to the value in Step 2.b of the Test Specifications. Compare the actual flow rate with the value in Step 2.b of the Test Specifications.

    3. Decrease the pilot pump pressure to zero. Slowly increase the discharge pressure to the main pumps to the value in Step 2.c of the Test Specifications. Compare the actual flow rates with the value in Step 2.c of the Test Specifications.

      ------ WARNING! ------

      Pump test pressures in this guideline may exceed the normal operating range of the hydraulic test hoses utilized when connecting the tested pump to the test bench. However, the order of magnitude of these pressures is significantly below the burst strength of the Caterpillar XT6 product.

      High pressure oil can escape through improperly assembled hoses and fittings. High pressure oil can also escape through poorly maintained hoses and fittings. High pressure oil may also leak through hose that has become damaged over the life of the hose due to the pressure levels that occur during test bench operation.

      Personal injury or death can result during adjustment of the high pressure relief valve if recommended hose maintenance practices are not followed. Escaping fluid under pressure can penetrate body tissue causing serious injury, and possible death.

      Adjustment of the high pressure cut or pressure override valve shall only be performed when the pump is operating at a zero discharge pressure condition. Continuation of the pump test procedure can be resumed when this high pressure adjustment is completed.


    4. Slowly increase the discharge pressure for the pumps to the value in Step 2.d of the Test Specifications. Compare the actual flow rates with the value in Step 2.d of the Test Specifications.

      Note: The pump torque control must be adjusted if Steps 2.b through 2.d flow values are not within test specifications. Turn adjustment screw for torque control (51) accordingly.



    Illustration 14g01181511
    Negative flow characteristics
    (Q) Discharge flow
    (R) Negative flow control pressure


    Illustration 15g01419153
    Hydraulic schematic for negative flow control setup
    (49) Ports for the negative flow control pressure
    (53) Gauge port for power shift pressure
    (54) Port for the power shift pressure
    (55) Gauge port for discharge pressure
    (61) Adjustment screw for the outlet pressure
    (62) Outlet port to tank
    (63) Gauge port for the inlet pressure
    (64) Port for the outlet pressure
    (65) Gauge port for the outlet pressure
    (66) Port for the inlet pressure
    (67) 006-0210 Tee

  3. Steps 3.a and 3.b verify the operation of the negative flow control. Both pumps will be tested at the same time. 1U-6392 Pressure Reducing Valve will be used to adjust the negative flow control pressure. Refer to Illustration 14 for an example of the negative flow control. Refer to Illustration 15 to set up the negative flow control.

    Decrease the input RPM and all pressures to zero. Decrease signal current from power supply to zero. Disconnect the 1U-6392 Pressure Reducing Valve outlet pressure (64) from the port for power shift pressure (54). Vent the port for power shift pressure (54) and the gauge port for power shift pressure (53) to atmosphere. A 006-0210 Tee will be required to connect 1U-6392 Pressure Reducing Valve outlet pressure (64) to the negative flow control ports (49).

    1. Increase the input RPM and the discharge pressure to both pump discharge ports (52) according to Step 3.a of the test specifications. Adjust the adjustment screw (61) for the 1U-6392 Pressure Reducing Valve until the outlet pressure (65) is equal to the negative flow control pressure (49) in Step 3.a of the Test Specifications. Increase the negative flow control pressure until the flow begins to decrease. This is the destroke point. The pumps should now be under negative flow control. Slowly cycle the negative flow control pressure to both pumps around the value in Step 3.a of the Test Specifications. This is accomplished to verify the destroke point. The discharge flow should drop as the negative flow control pressure increases.

      If either pump begins to destroke too soon, then the negative flow control valve should be disassembled and inspected. If either pump begins to destroke too late, then the negative flow control valve should be disassembled and inspected.

    2. Slowly increase the negative flow control pressure (49) according to Step 3.b of the Test Specifications. The pumps should be fully destroked.


    Illustration 16g01419197
    Hydraulic schematic for pump efficiency setup
    (49) Port for negative flow control pressures
    (53) Gauge port for power shift pressure
    (54) Port for power shift pressure
    (55) Gauge port for discharge pressure
    (68) Signal pressure from test bench

  4. Steps 4.a and 4.b measure the amount of internal leakage. Only one pump will be tested at a time. The pump not being tested will be put into standby. Refer to Illustration 16 to set up the pump efficiency.

    Decrease the input RPM and all pressures to zero. Disconnect 006-0210 Tee. Vent negative flow control port (49) on the pump to be tested to atmosphere. Disconnect 1U-6392 Pressure Reducing Valve from the pump. Connect gauge port for discharge pressure (55) or (56) to negative flow control port (49) on the pump to be put in standby. Connect the signal pressure from the test bench to the port for the power shift pressure (54). Connect 8T-0855 Pressure Gauge to the power shift gauge port (53).

    1. Start rotating the pump according to Step 4.a of the Test Specifications. Slowly increase the signal current until the pressure at the power shift gauge port (53) is adjusted according to Step 4.a of the Test Specifications. Slowly increase the discharge pressure to the pump that is not being tested to the standby pressure in the test specifications. The pump should be fully destroked and in standby. Record flow of pump being tested.

    2. Slowly increase the discharge pressure to the tested pump to the value in Step 4.b of the Test Specifications. Subtract the actual discharge flow rate measured in Step 4.b from the actual discharge flow recorded in Step 4.a. This is the internal leakage. The internal leakage should not exceed the value in Step 4.b of the Test Specifications. The pump may not be mechanically feasible if the internal leakage is too high. The pump should be disassembled and inspected. Repeat Step 4 to test the pump that was in standby.

  5. Step 5 will verify operation of the high-pressure cut for pumps equipped with high-pressure cut. Leave connections as used in Step 4 of the Test Procedure. Only one pump will be tested at a time. The pump not being tested will be put into standby. Refer to Illustration 16 for setup.

    Start rotating the pump according to Step 5 of the Test Specifications. Slowly increase the signal current until the pressure at the power shift gauge port (53) is adjusted according to Step 5 of the test specifications. Slowly increase the discharge pressure to the pump that is not being tested to the standby pressure in the test specifications. The pump in standby should be fully destroked and in standby. Slowly increase the discharge pressure to the tested pump to the value in Step 5 of the Test Specifications. The pump being tested should destroke at this pressure to the discharge flow value in 5 of the Test Specifications. If the pump does not destroke at this pressure, adjust high-pressure cut accordingly. Repeat Step 5 to test the pump that was in standby.

------ WARNING! ------

Hot oil and hot components can cause personal injury. Do not allow hot oil or hot components to contact skin.


Reduce RPM and all pressures to zero. Remove the component from the test bench. Drain the oil from the pump. Plug all of the ports.

Test Specifications

Table 3
Part Number  _________________________ 
Pump Rotation  _________________________ 
Step  1  2a  2b  2c  2d  3a  3b  4a  4b  5 
RPM  ________  ________  ________  ________  ________  __________  __________  _________  _______  _________ 
Power Shift Pressure kPa (psi)  __________  __________  __________  __________  _________ 
Negative Flow Control Pressure kPa (psi)  Vent ports (49) to atmosphere  __________  __________  The port for the negative flow control pressure (NFC) of the pump being tested should be vented to atmosphere.  The port for the NFC pressure of the pump being tested should be vented to atm. 
Discharge Pressure kPa (psi)  __________  ________  ________  ________  __________  _________  _______  _________ 
Discharge Flow lpm (gpm)  ________  ________  ________  ________  ________  __________  __________  _________  _______  _________ 
Max. Internal Leakage lpm (gpm)  _______ 
Pilot Pump Discharge Flow lpm (gpm)  ________  ________  ________  ________  ________  __________  __________  _________  _______  _________ 
Pilot Pump Discharge Pressure kPa (psi)  ________ 
Standby Negative Flow Control Pressure kPa (psi)  __________  _________ 
Standby Discharge Pressure kPa (psi)  __________  _________ 
Standby Discharge Flow lpm (gpm)  __________  _________ 

Table 4
Part Number  357-1618 (Front Pump)
Equipped with High Pressure Cut 
Pump Rotation  Clockwise 
Step  1  2a  2b  2c  2d  3a  3b  4a  4b  5 
RPM  600  900  900  900  900  900  900  900  900  900 
Power Shift Pressure kPa (psi)  1340 (194)  Vent port (52) to atmosphere  380 (55)  380 (55) 
Negative Flow Control Pressure kPa (psi)  Vent ports (49) to atmosphere  1160±100 (168±15)  3460±200 (502±30)  The port for the negative flow control pressure (NFC) of the pump being tested should be vented to atmosphere.  The port for the NFC pressure of the pump being tested should be vented to atm. 
Discharge Pressure kPa (psi)  10200 (1479)  20900 (3031)  24000 (3480)(1)  7800 (1131)  14500 (2103)  24000 (3480 
Discharge Flow lpm (gpm)  84 (22)  125 (33)  125 (32)  65 (17)  58 (15)  125±3 (32±1)  12±3 (3±1)  125 (32)  123 (32)  12 (3) 
Max. Internal Leakage lpm (gpm)  1.5 (0.3) 
Pilot Pump Discharge Flow lpm (gpm)  6 (1.5)  9 (2.3)  9 (2.3)  9 (2.3)  9 (2.3)  9 (2.3)  9 (2.3)  9 (2.3)  9 (2.3)  9 (2.3) 
Pilot Pump Discharge Pressure kPa (psi)  3920 (568) 
Standby Negative Flow Control Pressure kPa (psi)  4900 (710)  4900 (710) 
Standby Discharge Pressure kPa (psi)  4900 (710)  4900 (710) 
Standby Discharge Flow lpm (gpm)  12 (3)  12 (3) 
(1) Read flow right before high-pressure cut begins destroke.

Table 5
Part Number  357-1618 (Rear Pump)
Equipped with High Pressure Cut 
Pump Rotation  Clockwise 
Step  1  2a  2b  2c  2d  3a  3b  4a  4b  5 
RPM  600  900  900  900  900  900  900  900  900  900 
Power Shift Pressure kPa (psi)  1340 (194)  Vent port (52) to atmosphere  380 (55)  380 (55) 
Negative Flow Control Pressure kPa (psi)  Vent ports (49) to atmosphere  1790±100 (260±15)  3460±200 (502±30)  The port for the negative flow control pressure (NFC) of the pump being tested should be vented to atmosphere.  The port for the NFC pressure of the pump being tested should be vented to atm. 
Discharge Pressure kPa (psi)  16100 (2335)  20900 (3031)  24500 (3553)(1)  7800 (1131)  20400 (2959)  24500 (3553 
Discharge Flow lpm (gpm)  62 (16.5)  94 (25)  92 (24)  65 (17)  57 (15)  94±3 (25±1)  17±3 (3±1)  94 (25)  91 (24)  17 (3) 
Max. Internal Leakage lpm (gpm)  1.5 (0.3) 
Pilot Pump Discharge Flow lpm (gpm)  6 (1.5)  9 (2.5)  9 (2.5)  9 (2.5)  9 (2.5)  9 (2.5)  9 (2.5)  9 (2.5)  9 (2.5)  9 (2.5) 
Pilot Pump Discharge Pressure kPa (psi)  3920 (568) 
Standby Negative Flow Control Pressure kPa (psi)  4900 (710)  4900 (710) 
Standby Discharge Pressure kPa (psi)  4900 (710)  4900 (710) 
Standby Discharge Flow lpm (gpm)  17 (3.2)  17 (3.2) 
(1) Read flow right before high-pressure cut begins destroke.

Table 6
Part Number  357-1619 (Front and Rear Pumps)
Equipped with High Pressure Cut 
Pump Rotation  Clockwise 
Step  1  2a  2b  2c  2d  3a  3b  4a  4b  5 
RPM  600  900  900  900  900  900  900  900  900  900 
Power Shift Pressure kPa (psi)  1340 (194)  Vent port (52) to atmosphere  380 (55)  380 (55) 
Negative Flow Control Pressure kPa (psi)  Vent ports (49) to atmosphere  1160±100 (168±15)  3460±200 (502±30)  The port for the negative flow control pressure (NFC) of the pump being tested should be vented to atmosphere.  The port for the NFC pressure of the pump being tested should be vented to atm. 
Discharge Pressure kPa (psi)  10200 (1479)  20900 (3031)  24000 (3480)(1)  7800 (1131)  14500 (2103)  24000 (3480 
Discharge Flow lpm (gpm)  84 (22)  125 (33)  124 (32)  65 (17)  58 (15)  125±3 (33)  17±3 (3.2±1)  125 (32)  123 (32)  17 (3) 
Max. Internal Leakage lpm (gpm)  1.5 (0.3) 
Pilot Pump Discharge Flow lpm (gpm)  6 (1.5)  9 (2.3)  9 (2.3)  9 (2.3)  9 (2.3)  9 (2.3)  9 (2.3)  9 (2.3)  9 (2.3)  9 (2.3) 
Pilot Pump Discharge Pressure kPa (psi)  3920 (568) 
Standby Negative Flow Control Pressure kPa (psi)  4900 (710)  4900 (710) 
Standby Discharge Pressure kPa (psi)  4900 (710)  4900 (710) 
Standby Discharge Flow lpm (gpm)  17 (3.2)  17 (3.2) 
(1) Read flow right before high-pressure cut begins destroke.

Test Bench Tooling

Table 7
Part Number  Mounting Flange  Drive Adapter  Suction Adapter  Split Flange  Flange Adapter  Power Shift Port  Negative Flow Ports  Case Drain Port 
357-1618(1)  TBD  9U-5748  1U-9874  8T-9403  9U-7438  G1/4-15  G1/4-15  G3/4-20 
357-1619(1)  TBD  9U-5748  1U-9874  8T-9403  9U-7438  G1/4-15  G1/4-15  G3/4-20 
(1) Pilot pump pressure port size is G1/4-14. Pilot suction port size is G3/4-20.5. Pilot pump discharge size is G1/2-19.

Caterpillar Information System:

2015/09/15 A New Hose Clamp for Auxiliary Lines on XHP Machines {5057}
PL72 Pipelayer Engine Supplement Engine and Torque Converter - Separate
797F Off-Highway Truck Field Assembly Battery Box - Install
735, 740 GC, 740 EJECTOR, 745 Articulated Trucks Engine Supplement Crankshaft Front Seal and Wear Sleeve - Remove and Install
2015/09/09 An Updated Parking Brake Cable and Lever is Now Used on Certain Backhoe Loaders {4282, 4284}
CP54B, CS54B and CS64B Vibratory Soil Compactors Machine Systems Machine Drive Power Angle Sensor - Calibrate
CP56B, CP68B, CS56B, CS66B and CS68B Vibratory Soil Compactors Machine Systems Magnetic Sensor (Vibratory) - Test and Adjust
M314F, M316F, M318F, M320F and M322F Wheeled Excavator and Material Handler Machine Systems Upper Frame and Undercarriage Frame - Separate
2015/09/16 A New Exhaust Gas Temperature Sensor Is Used on Certain 24M Motor Graders {1919, 1920}
CP54B, CS54B and CS64B Vibratory Soil Compactors Machine Systems Magnetic Sensor (Vibratory) - Test and Adjust
M314F, M316F, M318F, M320F and M322F Wheeled Excavator and Material Handler Machine Systems Stub Boom Cylinders - Remove and Install
740 GC, 740 Ejector, 745 Articulated Truck Machine System Gear Pump (Brake Cooling) - Remove and Install
CP54B, CS54B and CS64B Vibratory Soil Compactors Propel System Piston Pump Neutral - Test and Adjust
CP54B, CS54B and CS64B Vibratory Soil Compactors Propel System Piston Pump Neutral (Mechanical) - Test and Adjust
CP56B, CP68B, CS56B, CS66B and CS68B Vibratory Soil Compactors Machine Systems Machine Drive Power Angle Sensor - Calibrate
PL72 Pipelayer Systems Brake Pressure - Test
Load Haul Dump Power Train Drive Shaft
Load Haul Dump Power Train Drive Shaft (Rear) - Remove and Install
PL72 Pipelayer Systems Quick-Drop Valve
797F Off-Highway Truck Field Assembly Exhaust - Install - Extra Quite
3516E Engines for 994K Wheel Loaders Cooling System Operation
3516E Engines for 994K Wheel Loaders Finding the Top Center Position for the No. 1 Piston
Installing Optional Migration Kits on C9.3 through C15 ACERT Tier 4 Interim Machine Engines {1000, 1261, 1380, 775E} Installing Optional Migration Kits on C9.3 through C15 ACERT Tier 4 Interim Machine Engines {1000, 1261, 1380, 775E}
PL72 Pipelayer Systems Transmission Lubrication Oil Pressure - Test
Back to top
The names Caterpillar, John Deere, JD, JCB, Hyundai or any other original equipment manufacturers are registered trademarks of the respective original equipment manufacturers. All names, descriptions, numbers and symbols are used for reference purposes only.
CH-Part.com is in no way associated with any of the manufacturers we have listed. All manufacturer's names and descriptions are for reference only.